Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹41.9 LAdmitted-Finance | -19.50% | ₹41.9 L | L1 | Admitted-Finance |
| 2 | L2₹42.7 L+₹78,117.61 (1.86%)Admitted-Finance | -18.00% | ₹42.7 L+₹78,117.61 (1.86%) | L2 | Admitted-Finance |
| 3 | L3₹42.9 L+₹93,220.34 (2.22%)Admitted-Finance | -17.71% | ₹42.9 L+₹93,220.34 (2.22%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical THAYAN KALAROOS SHAH BULDING THAYAN KALAROOS THAYAN KAAROOS KUPWARA JAMMU KASHMIR 193222 UDYAM JK 12 0011118 | KUPWARA | JAMMU AND KASHMIR | 193222 | - | - | - | Rejected-Technical Debared by PDC for period of 2 years |
Tender Value
₹52.0 L
EMD Value
₹2.6 L
Closing Date
12 Jun 2026, 4:00 pmClosed
Executive Engineer
CMD USHP-II Kangan
Construction of meeting hall at power House/divisional Complex including allied works/purchase through GeM.
2026_SPDC_310109_1
04 OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
kangan
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,550
CPAO JKPDC Kangan
₹2.6 L
CMD USHP-II Kangan
27 Jun 2026
18 May 2026
15 Jun 2026
18 May 2026
12 Jun 2026
18 May 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 47.43 | Cum | 256.85 | ₹12,182.4 |
| 1.02 | Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts. | 277.56 | sqm | 723.2 | ₹2,00,731.39 |
| 1.03 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 34.39 | cum | 7,788.4 | ₹2,67,843.08 |
| 1.04 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 30.92 | cum | 7,677.35 | ₹2,37,383.66 |
| 1.05 | Supplying, filling , spreading and leveling coarse sand of size range 1.5 mm to 2 mm, in recharge pit in required thickness over the gravel layer, for all leads and lifts all complete as per direction of Engineer-in-charge. | 14.29 | cum | 1,031.2 | ₹14,735.85 |
| 1.06 | Supplying, filling, spreading and leveling stone boulders of size range 5 cm to 20 cm, in recharge pit in the required thickness for all leads and lifts all complete as per direction of Engineer-in-charge. | 8.74 | cum | 857.3 | ₹7,492.8 |
| 1.07 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 3.3 | sqm | 5,733.6 | ₹18,920.88 |
| 1.08 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.28 | cum | 6,591.25 | ₹15,028.05 |
| 1.09 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand)…. | 65.83 | cum | 7,571.55 | ₹4,98,435.14 |
| 1.1 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level. | 65.83 | cum | 1,455.65 | ₹95,825.44 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_1003547.xls
BOQ • 0.44 MB
corrigendum01to04.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .