Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAccepted-AOC NEAR BANIK PARA WEST JOYNAGAR AGARTALA TRIPURA W | NIRMAL | TELANGANA | 799001 | ₹24.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹25.6 LRejected-AOC | ₹25.6 L | L2 | Rejected-AOC L2 |
Tender Value
₹25.3 L
EMD Value
₹50,681
Closing Date
18 Dec 2025, 3:00 pmClosed
Executive Engineer, Div-IV, AM
O/O the Executive Engineer, Div-IV, AM
Construction of Rcc drain and CC road at near the H.O Lt Dinesh Chakraborty to H.O Barun Choudhury connected with GB Indranagar ITI road under Ward No 10 AMC 2ND Call
2025_SAMC_68038_1
DNIET-13/DIV-IV/AMC/25-26
Open Tender
Civil Works
90 days
under ward no-10, AMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
₹50,681
Yes
30 Apr 2026
5 Dec 2025
18 Dec 2025
5 Dec 2025
18 Dec 2025
5 Dec 2025
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. - All kinds of soil
Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size)
First class brick work in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ).
Half brick masonry work with second class bricks in superstructure upto floor five level including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ).
12 mm cement plaster of mix 12.1.1 Cement mortar 1:4 (1 cement : 4 fine sand) including neat cement punning
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishingm and reinforcement- 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more
Centering shuttering including struttings, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platform with timber planks
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level:1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_69233.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_69233.xls
BOQ • 0.28 MB
DNIET13.pdf
Tender Documents • 2.93 MB
Download all tender documents and submit your bid