Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹8.1 L (4.98%)Admitted-Finance F 33 3 OKHLA INDUSTRIAL AREA PHASE 2 DELHI 110020 | SOUTH | DELHI | 110020 | ₹1.7 Cr+₹8.1 L (4.98%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹34.2 L (21.0%)Admitted-Finance | ₹2.0 Cr+₹34.2 L (21.0%) | L3 | Admitted-Finance |
| 4 | L4₹2.0 Cr+₹42.0 L (25.8%)Admitted-Finance | ₹2.0 Cr+₹42.0 L (25.8%) | L4 | Admitted-Finance |
| 5 | L5₹2.4 Cr+₹79.4 L (48.7%)Admitted-Finance UNIT NO 514 515 AND 516 5TH FLOOR SUNCITY SUCCESS TOWER GOLF COURSE EXTENSION ROAD GURGAON 122005 | GURGAON | GURGAON | HARYANA | 122005 | ₹2.4 Cr+₹79.4 L (48.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Voyants Solutions Pvt Ltd L6 | Almondz Global Infra Consultant Limited L2 | CivilMantra Infracon Private Limited L4 | Indian Technocrat Limited L1 | Holtec Consulting Private Limited L3 | MSV International Inc L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Remuneration for Local Staff | |||||||||
| 1.01 | Team Leader cum Senior Highway Engineer | 6 | Month | 2,50,000 ₹15,00,000 | 2,00,000 ₹12,00,000 | 2,40,000 ₹14,40,000 | 2,50,000 ₹15,00,000 | 3,00,000 ₹18,00,000 | 1,41,600 ₹8,49,600 Lowest |
| 1.02 | Senior Bridge Engineer | 4 | Month | 2,00,000 ₹8,00,000 | 1,75,000 ₹7,00,000 | 1,80,000 ₹7,20,000 | 2,00,000 ₹8,00,000 | 3,00,000 ₹12,00,000 | 94,400 ₹3,77,600 Lowest |
| 1.03 | Highway cum Pavement Engineer | 4 | Month | 2,00,000 ₹8,00,000 | 1,50,000 ₹6,00,000 | 1,80,000 ₹7,20,000 | 1,50,000 ₹6,00,000 | 2,00,000 ₹8,00,000 | 94,400 ₹3,77,600 Lowest |
| 1.04 | Material cum Geotechnical Engineer cum Geologist | 4 | Month | 2,00,000 ₹8,00,000 | 1,50,000 ₹6,00,000 | 1,80,000 ₹7,20,000 | 1,50,000 ₹6,00,000 | 2,00,000 ₹8,00,000 | 88,500 ₹3,54,000 Lowest |
| 1.05 | Senior Survey Engineer | 4 | Month | 1,50,000 ₹6,00,000 | 1,50,000 ₹6,00,000 | 1,80,000 ₹7,20,000 | 1,50,000 ₹6,00,000 | 2,00,000 ₹8,00,000 | 88,500 ₹3,54,000 Lowest |
| 1.06 | Traffic and Safety Expert | 4 | Month | 1,00,000 ₹4,00,000 | 1,25,000 ₹5,00,000 | 3,00,000 ₹12,00,000 | 1,20,000 ₹4,80,000 | 2,00,000 ₹8,00,000 | 94,400 ₹3,77,600 Lowest |
| 1.07 | Environment Specialist | 2 | Month | 1,00,000 ₹2,00,000 | 1,10,000 ₹2,20,000 | 1,50,000 ₹3,00,000 | 1,20,000 ₹2,40,000 | 2,00,000 ₹4,00,000 | 70,800 ₹1,41,600 Lowest |
| 1.08 | Quantity Surveyor / Documentation expert | 6 | Month | 1,00,000 ₹6,00,000 | 50,000 ₹3,00,000 Lowest | 1,30,000 ₹7,80,000 | 1,15,000 ₹6,90,000 | 2,00,000 ₹12,00,000 | 70,800 ₹4,24,800 |
| 1.09 | Land Acquisition Expert | 6 | Month | 1,00,000 ₹6,00,000 | 50,000 ₹3,00,000 Lowest | 1,30,000 ₹7,80,000 | 1,15,000 ₹6,90,000 | 2,00,000 ₹12,00,000 | 70,800 ₹4,24,800 |
Tender Value
₹2.4 Cr
Closing Date
31 May 2025, 12:00 pmClosed
The Chief Engineer Project Udayak
HQ CE(P) Udayak, C/o 99 APO, PIN-931715(Doomdooma)
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FS AND DPR AND PROVIDING PRE-CONSTRUCTION ACTIVITIES FOR ERECTION OF FENCE AND CONSTRUCTION OF TRACK ALONG THE FENCE OF IMB BETWEEN BP-168 TO BP-175 (LENGTH - 74.70 KM) INCLUDING CONSTR OF APPROACH Rd
2025_BRO_704753_1
CE (P) Udayak/DPR Consultancy/04/2025-26
Open Tender
Consultancy Services
Works
180 days
(IMB) BETWEEN BP-168 TO BP-175
As per RFP/Tender Documents
6 documents required · 6 mandatory
₹5,000
Chief Engineer, Project Udayak
Exempted
HQ CE(P) Udayak, C/o 99 APO, PIN-931715(Doomdooma)
21 Jun 2025
19 Apr 2025
2 Jun 2025
21 Apr 2025
31 May 2025
7 May 2025
23 Apr 2025 - 28 Apr 2025
5 May 2025
Amount
Remuneration for Local Staff
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Material cum Geotechnical Engineer cum Geologist
Senior Survey Engineer
Traffic and Safety Expert
Environment Specialist
Quantity Surveyor / Documentation expert
Land Acquisition Expert
Utility Expert
Office Rent
Office Rent
Support Staff Note : To be assessed by consultant as per requirement of assignment)
Office Manager
Typist
Office Boy
Night Watchman
Transportation (Fixed Cost)
The Vehicle provided by the consultant shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc A. For use of Consultants
Duty travel to Site (Fixed Cost)
Trips
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies Drafting
Supplies Computer
Running Costs
Domestic and International Communication
Office Furniture and Equipment (Rental)
Office Furniture and Equipment
Reports and Document Printing
Monthly Reports (3 Copies per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Enviroment Assessment report & RAP
Final Enviroment Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Document
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. Final EMP
Final EMP
Final Bidding Documents
Draft 3(a), 3(A) and 3(D) notification for land acquisition (03 copies each)
LA & Clearances II Report
Survey and Investigation
A. Tropographical Survey (Fixed Cost)
Tropographical Survey including hire charges for eqipment and supply of survey team comprising of project survey field staff etc. inclusive of cost of materials, labourer
Detailed topograhic surveys using mobile/aerial LiDAR or equivalent technology
B. Investigation (Fixed Cost)
Road and Bridge Inventory
BBD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/Studies
Any other Investigation/Surveys
C. Network Survey and GPR
Network Survey and GPR
Cost of Supply and fixing boundary pillars
Cost of Supply and fixing boundary pillars
Land Acquisition
Land Acquisition Team including support staff and logistic/Transportation
Foreign Consultants
A. Renumeration of Expatriate Staff including per diem allowance
Position
Position
Position
Position
Position
Position
B. Mobilization and Demobilization-International Airfares (Fixed Cost) To be filled by the bidder in below columns)
Position
Position
Position
Position
Position
Position
Almondz Global Infra Consultant Limited (BID ID -3309289)
Holtec Consulting Private Limited (BID ID -3304613)
CivilMantra Infracon Private Limited (BID ID -3309409)
MSV International Inc (BID ID -3303759)
Voyants Solutions Pvt Ltd (BID ID -3309865)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.39 MB
NIT80183.pdf
Additional Documents • 2.37 MB
AoRMAP.pdf
Additional Documents • 0.39 MB
RFP80183.pdf
Tender Documents • 3.16 MB
BOQ_789412.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .