Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.5 CrAccepted-Finance | ₹7.5 Cr | 1 | Accepted-Finance approved |
| 2 | 1₹7.5 CrAccepted-Finance | ₹7.5 Cr | 1 | Accepted-Finance approved |
Tender Value
₹1.2 Cr
EMD Value
₹2.3 L
Closing Date
10 Mar 2023, 5:00 pmClosed
S.E Pauri
S.E pauri Ujs pauri
Boonga Bhanghat water supply scheme under Kaljikhal Block
2023_UKJS_55469_9
424/Etender/dated20.02.2023
Open Tender
Civil Works - Water Works
Item Wise
180 days
Boonga BhanghatUnder Kaljikhal Block
As per ten doc
2 documents required · 2 mandatory
₹4,720
EE Pauri
₹2.3 L
01.0.2023
3 Oct 2023
25 Feb 2023
11 Mar 2023
25 Feb 2023
10 Mar 2023
25 Feb 2023
1 Mar 2023
Rates for Supplying ,carting , laying and jointing of G.I pipe (M) , Source work ,Reservoir& Providing Functional House Hold Tap Connection (FHTC) for appropriate & qualitative drinking water for each house hold and all other appurtenant works etc complete BUNGA BHANGHATwater Supply scheme Under KALJIKHAL blocks in District Pauri. All rates shall be included all types of taxes and G.S.T. It is necessary the contractor will start the work from source to Distribution System. If any dispute in the source than other work will not done by the contractor
Consttuction of a Cross wall including supply of all material, labour, T&P etc complete
Construction ofFrenchwell 250 mm including supply of all material, labour, T&P etc complete
100 mm dia GI medium class perforated pipe having 10 mm dia holes 25 mm aprart including supply of all material labour T&P etc complete
Filling pebbles or stone 25 mm to 50 mm size in gallary for water interception around perforated pipe including supply of all materaial labour T&P etc complete
Providing & filling large stones pithcing including supply of all materail labour T&P etc complete
Providing & Fixing 50 mm GI Medium pipe with plug for washout including supply of all material labour T&P etc complete
Supply of all materials, labour, T&P etc and construction of R.C.C. CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2 . 1) 35.00 KL
Supply and installation of bucket type chlorinator of 25 liters capacity including bleeching powder solution doser, chloroscope kit with stop cock & iron cage fabricated with 25 mm x 25 mm square mesh with locking arrangements below dozer to protect flexible pipe connection with CWR complete with all arrangements in position.
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 90% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock 1) Soil mixed with boulder and bajri
Soft soil
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete. G.I. Pipe Medium quality 1) 65 mm dia
2) 50 mm dia
4) 32 mm dia
5) 25 mm dia
6) 20 mm dia
Cartage of following pipes, specials & fittings from Kotdwar to site store for proper completion of works. 1) 65 mm dia
2) 50 mm dia
3) 32 mm dia
4) 25 mm dia
5) 20 mm dia
Supply and fixing of the following fittings including cartage of materials, labour and T&P etc. complete. 1) For 65 mm dia
2) for 50 mm dia
Air Valve for 50 mm dia
Supply of all materials, labour and T&P etc. and construct following valve chambers as per type design. Wheel Valve Chamber 45cm x 45cm size
Air Valve Chamber 45cm x 45cm size
Providing Functional House hold tap Connection (FHTC) from exiting supply main to House hold including with Laying & Jointing of 15 mm G.I Pipe (Medium)line including Excavation of Earth work upto Requried depth , Plain Cement Concret etc, including all materials and Labours etc as per direction of Site Encharge for Proper completion of work.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
RR stone masonary with 1:6 cement and sand mortar nearby sources and along the pipe line for proper completion of work.
RR stone masonary laid in dry for proper completion of work along the pipe line.
Testing of Pipe and other
Godown and Hiring charges
Advertisement board (SIZE 0.90 x 0.60 Mtr.)
M/S INDIAN CONSTRUCTION COMPANY
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .