Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
5 May 2025, 11:00 amClosed
Manager SRC-OS
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
CALIBRATION AND RENEWAL OF PRESSURE AND TEMPERATURE GAUGES ON INS JAMUNA
2025_HSL_97243_2
20 / 22040 / 071 / PRESSURE AND TEMPERATURE
Open Limited
Miscellaneous Services
Service
30 days
HSL Visakhapatnam
Please refer Tender documents.
6 documents required · 6 mandatory
₹525
Yes
HSL
₹10,000
Yes
21 May 2025
2 May 2025
5 May 2025
2 May 2025
5 May 2025
2 May 2025
Amount
VESSEL : INS JAMUNA WO.NO:22040 DL NOS : : 20001.19,20003.01,20025.01 ,20027.01,20030.02,20031.02,20033.01,20042.02,20093,180,210,214,217,296,20008.01. SUB:CALIBRATION AND RENEWAL OF GAUGES
MAIN ENGINE (P&S): CALIBRATE ALL PRESSURE AND TEMPERATURE GAUGES OF BOTH MAIN ENGINES. VENDOR SHOULD CONSIDER GAUGES FOR CALIBRATION - 215 NOS AND RENEWAL OF DEFECTIVE GAUGES - 100 NOS.
MAIN ENGINE SEA WATER CIRCULATNG SYSTEM: CALIBRATE ALL PRESSURE GAUGES AND RENEW DEFECTIVE GAUGES. CONSIDER COPPER LINE -50 RMT ALONG WITH END FITTINGS. - 22Nos.
SHIP FIRE MAIN SYSTEM: CALIBRATE ALL INSTRUMENTATION, PRESSURE GAUGES AND RENEW DEFECTIVE GAUGES. - 08Nos.
HP AIR SYSTEM: CALIBRATE ALL PRESSURE GAUGES AND RENEW DEFECTIVE GAUGES. - 20Nos.
SHIP FUEL SYSTEM: CARRYOUT CALIBRATION OF ALL INSTRUMENTATION AND PRESSURE GAUGES . REPLACE DEFECTIVE. - 12Nos.
REF CONDENSER PP: CARRYOUT CALIBRATION OF ALL INSTRUMENTATION AND PRESSURE GAUGES . REPLACE DEFECTIVE. - 08Nos.
AVCAT SYSTEM: CALIBRATE ALL PRESSURE GAUGES AND RENEW DEFECTIVE GAUGES. - 10No.
STEERING GEAR: CALIBRATE ALL TEMPERATURE AND PRESSURE GAUGES.RENEW DEFECTIVE GAUGES. - 08Nos.
MAIN ENGINE CONTROL: LOW CONTROL AIR FAILURE OBSERVED, RENEW/ REPLACEMENT OF CONTROL AIR PIPELINE (200 MTRS COPPER GAUGE LINE) ALONG WITH END FITTINGS (300 NOS). SCOPE OF WORK INVOLVE RENEWAL DEFECTIVE GAUGE LINE WITH NEW GAUGE LINES ALONG WITH END FITTINGS. MAT COPPER GAUGE LINE, SIZE 3/4 INCH.
AC AND REF SYSTEM: MANUFACTURING OF GAUGE LINE WITH END FITTINGS OF AC CHILLED WATER AND SEA WATER PUMP. LENGTH : 40 MTR, COPPER LINES.
GEAR BOX: LO PRESSURE LINE (GAUGE LINE) OF BOTH GEAR BOX FOR PRESSURE SWITCHES PERISHED, GAUGE LINE TO BE RENEWED ALONG WITH REQUIRED END FITTINGS.
MAIN SHAFTING: CALIBRATION OF SHAFTING TEMPERATURE GAUGES ALONG WITH SENSOR. RENEW DEFECTIVE GAUGES ALONG WITH SENSOR. - 20Nos.
CARRY OUT CALIBRATION OF ALL ATU TEMPERATURE AND PRESSURE GAUGES. RENEW DEFECTIVE GAUGES. - 08Nos.
CONTROL AIR SYSTEM: CALIBRATE ERRATIC PRESSURE GAUGES.RENEW DEFECTIVE GAUGES. - 20Nos.
REDUCTION GEAR BOX (PORT & STBD) : CALIBRATE PRESSURE AND TEMPERATURES GAUGES. RENEW DEFECTIVE GAUGES.
SRI VENKATA SAI CONSTRUCTION (BID ID -416443)
RAO ELECTRICAL ENGINEERIONG WORKS (BID ID -416449)
SHARP ELECTRICAL AND MECH ENGG SERVICES (BID ID -416456)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Restricted Tender
This is a Open Limited tender. Documents are accessible only to bidders authorized by the issuing authority on the government portal.
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .