Loading…
Loading…
Tender Value
₹14.2 L
EMD Value
₹28,440
Closing Date
22 Aug 2026, 4:00 pmClosed
Executive Engineer PHE Division Kargil
Executive Engineer PHE Division Kargil
Permanent restoration of JJM pipe line of water supply scheme Garkone under the alignment of construction of road from Haroo to Bararoo (Under SDP R and B Deposit).
2026_PWD_19366_2
Short E-tender- 74 of PHE Division Kargil of 2026-27
Open Tender
Pipes and Pipe related activities
Percentage
25 days
Haroo to Bararoo Garkone
Refer to NIT
3 documents required · 3 mandatory
₹142
Payable To Executive Engineer PHE Division Kargil
₹28,440
14 Aug 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
22 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in bulk excavation by manual means over areas (exceeding 30cm & up to 1.5mte in depth, 1.5mtr in width as well as 10sqm on plan) including Disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed. | |||||
| 1.01 | All kind of soil 30% | 25.39 | Cum | 245.94 | ₹6,244.42 |
| 1.02 | Ordanary rock 30% | 25.39 | Cum | 452.99 | ₹11,501.42 |
| 1.03 | Hard rock (by cheselling) 40% | 33.85 | Cum | 1,292.6 | ₹43,754.51 |
| 2Earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: | |||||
| 2.01 | All kind of soil 40% | 72 | Cum | 526.11 | ₹37,879.92 |
| 2.02 | Ordanary rock 40% | 72 | Cum | 1,164 | ₹83,808 |
| 2.03 | Hard rock (by cheselling) 20% | 36 | Cum | 2,374.71 | ₹85,489.56 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidation each deposited layer by ramming and watering lead up to 50mtr and left up to 1.5m. | 238.17 | Cum | 260.08 | ₹61,943.25 |
| 4 | Dumping of dry stone pitching (any thickness) on horizontal level excluding cost of stones. | 1.3 | Cum | 634.5 | ₹824.85 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 21.16 MB
BOQ_45987.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .