| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAdmitted-Finance | ₹8.8 L | L1 | Admitted-Finance |
| 2 | L2₹9.8 LAdmitted-Finance | ₹9.8 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JOYEETA ENTERPRISE L1 | M/S. S C ELECTRIC CO L2 |
|---|---|---|---|---|---|
| 1.00VARIOUS CABLE LAYING JOB | |||||
| 1.01 | Power Cable Laying work(upto 50 SQ MM)LT ( Laying of Cable through existing RCC/Hume /GI Pipe,Open masonry Trench/Cable Tray for Single 2,3<(>,,<)>3 ½ & 4 Core up to 50 Sqmm. ) | 400 | Meter | 14,000 ₹14,000 | 9,600 ₹9,600 Lowest |
| 1.02 | Power Cable laying work(70-400SQ MM)LT ( Laying of Cable through existingRCC/Hume /GI Pipe,Open masonry Trench/Cable Tray for Single 2,3<(>,,<)>3 ½ & 4 Core Above 50 Sqmm to 400 Sqmm. ) | 400 | Meter | 26,000 ₹26,000 | 22,000 ₹22,000 Lowest |
| 1.03 | Road boring job | 200 | Meter | 1,00,000 ₹1,00,000 | 90,000 ₹90,000 Lowest |
| 1.04 | Cable route marker ( Engraved MILESTONE shaped<(>,<)> ORANGE colored RCC concrete markers 2 feet Height, Width 1ft & 8 Inches Depth to be deployed along the cable path at an interval of every 200 mtrs. ) | 100 | NO | 35,000 ₹35,000 Lowest | 43,000 ₹43,000 |
| 1.05 | Construction of Earthing pit | 12 | NO | 72,000 ₹72,000 | 63,600 ₹63,600 Lowest |
| 1.06 | LT Power cable laying job(50-185 SQMM) ( Laying of Cable through U/G above 35 sqmm and up to 185 sqmm in underground trench 460mm wide x 760mm average depth, with brick protection on the top of the cable with 8 (eight) Nos. bricks per Mtr. including filling the space between the bricks and cable and also the trench with shifted soil, levelling up and restoring. ) | 400 | Meter | 39,200 ₹39,200 Lowest | 57,200 ₹57,200 |
| 1.07 | Supply&layingof 4 Inch GI Pipe(6Mtr/Pc) | 89 | NO | 4,00,500 ₹4,00,500 Lowest | 4,03,170 ₹4,03,170 |
| 1.08 | supply & laying 1.5sqmX3.5c armoured cab ( (Make-Polycab/ Havells/ Universal/ KEI Or any reputed vendor confirmed by department) ) | 200 | Meter | 24,000 ₹24,000 Lowest | 24,600 ₹24,600 |
| 1.09 | supply & laying 2.5sqmX3.5c armoured cab ( (Make-Polycab/ Havells/ Universal/ KEI Or any reputed vendor confirmed by department) ) | 200 | Meter | 32,000 ₹32,000 Lowest | 38,600 ₹38,600 |
Tender Value
₹10.0 L
EMD Value
₹19,952
Closing Date
2 Jun 2026, 10:00 amClosed
The General Manager, SGTPP, WBPDCL
Administrative Building, SgTPP, PO-Manigram, Dist- Murshidabad, Pin-742237
Service Contract for different sizes cable laying and associated jobs under the scope of EMOPH, SgTPP.
2026_WBPDC_1024234_1
WBPDCL/SGTPP/NIT/E3948/25-26 dated 07-03-2026
Open Tender
Support/Maintenance Service
Lump-sum
365 days
Sagardighi Thermal Power Project.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹19,952
Yes
20 Jul 2026
13 May 2026
4 Jun 2026
19 May 2026
2 Jun 2026
19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1VARIOUS CABLE LAYING JOB | |||||
| 1.01 | Power Cable Laying work(upto 50 SQ MM)LT ( Laying of Cable through existing RCC/Hume /GI Pipe,Open masonry Trench/Cable Tray for Single 2,3<(>,,<)>3 ½ & 4 Core up to 50 Sqmm. ) | 400 | Meter | 33 | ₹13,200 |
| 1.02 | Power Cable laying work(70-400SQ MM)LT ( Laying of Cable through existingRCC/Hume /GI Pipe,Open masonry Trench/Cable Tray for Single 2,3<(>,,<)>3 ½ & 4 Core Above 50 Sqmm to 400 Sqmm. ) | 400 | Meter | 62 | ₹24,800 |
| 1.03 | Road boring job | 200 | Meter | 450 | ₹90,000 |
| 1.04 | Cable route marker ( Engraved MILESTONE shaped<(>,<)> ORANGE colored RCC concrete markers 2 feet Height, Width 1ft & 8 Inches Depth to be deployed along the cable path at an interval of every 200 mtrs. ) | 100 | NO | 640 | ₹64,000 |
| 1.05 | Construction of Earthing pit | 12 | NO | 7,500 | ₹90,000 |
| 1.06 | LT Power cable laying job(50-185 SQMM) ( Laying of Cable through U/G above 35 sqmm and up to 185 sqmm in underground trench 460mm wide x 760mm average depth, with brick protection on the top of the cable with 8 (eight) Nos. bricks per Mtr. including filling the space between the bricks and cable and also the trench with shifted soil, levelling up and restoring. ) | 400 | Meter | 108 | ₹43,200 |
| 1.07 | Supply&layingof 4 Inch GI Pipe(6Mtr/Pc) | 89 | NO | 5,336.7 | ₹4,74,966.3 |
| 1.08 | supply & laying 1.5sqmX3.5c armoured cab ( (Make-Polycab/ Havells/ Universal/ KEI Or any reputed vendor confirmed by department) ) | 200 | Meter | 104 | ₹20,800 |
| 1.09 | supply & laying 2.5sqmX3.5c armoured cab ( (Make-Polycab/ Havells/ Universal/ KEI Or any reputed vendor confirmed by department) ) | 200 | Meter | 170 | ₹34,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
ReFinalTenderDocumentE3948.pdf
Tender Documents • 1.85 MB
BOQ_2517194.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].