Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 22 1 48 1 CHENGALARAOPETA BEACH ROAD VISAKHAPATNAM ANDHRA PRADESH 530001 | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | Admitted-Finance |
| 4 | Admitted-Finance PLOT NO 4B SURVEY NO 237 3P INDUSTRIAL PARK VAKALAPUDI KAKINADA EAST GODAVARI ANDHRA PRADESH 533005 | KAKINADA | ANDHRA PRADESH | 533005 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
23 Nov 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-Com
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Routines of Propeller Shafts, Rudders, Kort Nozzles, Steering Gear and Bow Thrusters on SCI PAWAN
2021_HSL_88014_1
20/22000/128/2021-22
Open Tender
Miscellaneous Services
Service
20 days
HSL Visakhapatnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹525
Yes
HSL
₹10,000
Yes
29 Nov 2021
12 Nov 2021
23 Nov 2021
12 Nov 2021
23 Nov 2021
12 Nov 2021
120 days
Amount
Routines / Overhauling / Servicing are to be carried out on Propeller Shafts, Stern Tube, Tail Shafts, Rudders, Steering Gear, Bow thruster and Stern Thuster as per Scope of Work. Satisfactory trials to be offered to ship staff, Class Surveyor & HSL post completion of routines. Defects if any observed by Ship staff to be liquidated and trials to be reoffered. And Finally, Satisfactory trials to be shown to ship staff, Class & HSL. All measuring instruments, Consumables are covered in Contractor's Scope
PROPELLER SHAFT,STERN TUBE AND TAIL SHAFT , WARTSILA. TYPE : LIPS 4D1000 CUNIAL,4000 KW 4 BLADED; ALL IMPORTANT ACTIVITIES OF PROPELLER SHAFTING TO BE CARRIED UNDER SUPERVISION OF OEM / OEM AUTHORIZED SERVICE ENGINEER;
PROPELLER PITCH OPERATION TO CHECK AND ZERO PITCH CALIBERATION TO CARRIED OUT PRIOR WITHDRAWL THE TAIL SHAFT AND AFTER COMPLETATION OF TAIL SHAFT JOB.
ROPE GUARD TO REMOVE, CLEAN AND ROPE GUARD TO BE FITTED BACK ON COMPLETION OF SHAFTING JOB. NEW CUTTER TO BE FITTED ON THE ROPE GUARD.
PROPELLER DROP TO MEASURE AND RECORD WITH NO 1 BLADE ON TOP
PROPELLER BALDE TIP CLEARENCE TO BE CHECKED AND RECORDED.
STERN TUBE AND SEAL OIL (APPROX 635LTRS) TO BE DRAINED, DRAINED OIL TO BE COLLECTED IN TANK. FLUSHED AND THERE AFTER FILLED WITH FRESH OIL AFTER FITTING BACK ALL PLUGS WITH NEW COPPER WASHERS. ALL PLUGS TO WIRE LASH WITH STAINLESS STEEL WIRE THEREAFTER.
BOTH STERN TUBE HEADER / EXPANSION TANK TO BE CLEANED. HEADER TANK AIR PRESSURE REGULATING VALVE WITH PRESSURE GAUGE (0 TO 2 KG/CM2)TO BE PROCURED,SUPPLY AND FITMENT IN CONTRACTOR SCOPE.
PROPELLER HUB AND BLADES TO BE BUFFED, SURFACE FINSHED AND VARNISH/GREASE APPLIED
ALL BALDES TO BE REMOVED FROM HUB, AFTER BUFFING BALDES TO BE FITTED WITH NEW BLADE FOOT O' RING AND BOLT O' RINGS (SHIP SUPPLY SPARE). BLADE BOLT TO BE TORQUE TIGHTEEN AT 6200 NM. CONTRACTOR TO BE ARRANGED CALIBRATED TORQUE WRENCHS.
BLADES ROOT AND TIP BOTH SIDES TO CHECK FOR CRACKS USING DYE PENETRANT ( TESTING MATERIALS AND TEST CERTIFICATE TO BE ARRENGED BY CONTRACTOR SCOPE)
PROPELLER BLADE FOOT SKIMMIMG TO BE DONE AS PER SERVICE ENGINEER RECOMONDATION.MACHINING WORKS AND TRANSPORTATION IN CONTRACTOR SCOPE.
BLADE BOLTS TO CHECK FOR CRACKS USING DYE PENETRANT ( TESTING MATERIALS AND TEST CERTIFICATE TO BE ARRENGED BY CONTRACTOR SCOPE)
STERN TUBE SEALS(FWD AND AFT)TO BE RENEWED BY IN SITU BONDING METHOD (SEAL SHIP SUPLY). SEALS SYSTEMS TO BE CHECKED UNDER STATIC HEAD FOR LEAKAGES. INSITU BONDING TO BE CARRIED UNDER SUPERVISION OF OEM / OEM AUTHORIZED SERVICE ENGINEER. FWD AND AFT CHROME LINER TO BE CALIBRATED AND RECORDED. IF CHROME LINER READING NOT IN LIMIT AND NEEDS TO RENEW,THEN NEW SPARE LINER (SHIP SUPPLY) TO BE MACHINED TO SIZE, AS PER INSTRUCTIONS BY OEM.
WITHDRAWAL OF TAIL END SHAFT ALONG WITH PROPELLAR HUB AND BLADE & REFIT TAIL END SHAFT AFTER COMPLETATION OF JOBS
FWD AND AFT BEARING RENEWAL: FWD AND AFT BEARING TEMPERATURE SENSOR TO BE REMOVED CAREFULLY, UTMOST PRECAUTION TO BE TAKEN TO PROTECT THE SENSOR. OLD BEARING TO BE REMOVED FROM PLACE BY USING STRONG BACK AND HYDRAULIC JACK. NEW BEARING OUTER DIA NEEDS TO BE MACHINED AS PER REQUIRED SIZE. 04 NOS SLOT TO BE CUT ON OUTSIDE OF THIS NEW BEARING, OIL HOLES TO BE DRILLED ON BEARING AS REQUIRED. NEW BEARING TO BE FITTED BACK IN STERN TUBE. BEARING FINAL DIMENTION TO BE TAKEN AND RECORDED. TEMPERATURE SENSOR TO BE FIT BACK AFTER BEARING INSTALLATION.BEARING MACHINIG WORKS,PULLER AND HYDRAULIC JACK ARRENGMENTS,DRY ICE,WELDING WORKS ARE IN CONTRACTOR SCOPE.
PROPELLER SHAFT (BEARING SEATING AREA) TO CHECK FOR CRACKS USING DYE PENETRANT & MPI TESTED IN PRESENCE OF SURVEYOR.( TESTING MATERIALS AND TEST CERTIFICATE TO BE ARRENGED BY CONTRACTOR SCOPE)
PROPELLER HUB OVERHAULING: HUB TO BE DISMANTLED, ALL INTERNAL PARTS TO BE CALIBRATED AND DP TESTED AS PER OEM INSTRUCTION. HUB TO BE ASSEMBLED WITH NEW SEAL RING, O RING ETC. (SHIP SUPPLY SPARE).AFTER FITTING OF BALDES, HUB TO BE PRESSURE TESTED AT 1 BAR PRESSURE.
INTERMEDIATE SHAFT BEARINGS (PORT & STBD, TOTAL 10 NOS)TO CHECK. TOP HALF COVER TO BE REMOVED, OLD GREASE TO BE REMOVED MANUALLY. BEARINGS TO BE CLEANED THROUGHLY WITH DIESEL AND COMPRESSED AIR. BEARINGS TO BE GREASED. TOP COVER TO BE TORQUE TIGHTEENED .BOTH FLENDER COUPLING TO CHECK FOR CRACK IN METALLIC PACK AND SLEEVE CLEARANCE TO CHECK.BEARING MAKE COOPER AND SPLIT TYPE. HIGH TEMPERATURE,HEAVY DUTY GOOD QUALITY GREASE TO BE CONTRACTOR SUPPLY.
SHIFTING / ROTATING INNER RACE OF INTERMEDIATE BEARING. INTERMEDIATE SHAFT NEEDS TO BE LIFTED BY PUTTING HYDRAULIC JACK TO FACILATE TURN THE INNER RACE OF THE BEARING. BEARING INNER RACE TO BE FIXED ON ITS ORIGINAL POSITION. 21
PORT AND STBD RUDDER. DETAILS: MAKE-ROLLS ROYCE TYPE- FB1750, AREA-5.6SQMTR, 3200/1750.
RUDDER DROP TO CHECK AND RECORD BEFORE REMOVAL OF RUDDER AND AFTER FITMENT OF RUDDER. REQUIRED TO MAKE NEW TEMPLATE FOR RUDDER DROP.
TO CUT 4 NOS. ACCESS DOORS ON THE RUDDER IN WAY OF PINTLE NUTS AND TO CHECK LOCKING ARRANGEMENTS FOR PINTLE NUTS.
TOP PINTLE CLEARANCES TO MEASURED AND RECORD.
JUMPING CLEARANCES TO MEASURED AND RECORD.
DRAIN PLUGS (4 NOS.) OF RUDDER TO REMOVE IN PRESENCEOF CEO / SUPDT AND TO CHECK FOR WATER INGRESS, IF ANY. RUDDER TO BE PRESSURE TESTED TO 3 PSI. AND TO COAT INTERNALLY WITH FLOAT COATE BY FISH OIL .DRAIN PLUG TO BE FITTED BACK AND TIGHTENED WITH NEW WASHER AND SEAL WITH CEMENT AFTER FITTING IN PLACE.WASHER AND CEMENT,FISH OIL SUPPLY IN CONTRACTOR SCOPE.
RUDDER SEALS & LINER RENEWAL-- RUDDER TO BE UNSHIPPED. AFTER HYDRAULIC LOOSENING, RUDDER STOCK TO DISMANTLE AND RUDDER STOCK SEALS (TOP & BOTTOM) TO RENEW, RUDDER SEAL, V RING (SPARES SHIP SUPPLY), FITMENT OF RUDDER AND RUDDER STOCK BY HYDRAULIC TIGHTENING.STAGING TO BE DONE, SUITABLE BOX STAGING TO PROVIDED. PORT SIDE: ONE TOWER 2.5X2.5X12 MTR AND TWO TOWERS 2.5X2.5X5.5 MTR. STBD SIDE: ONE TOWER 2.5X5X12 MTR, ONETOWER 2.5X2.5X5.5 MTR AND ONETOWER 5X2.5X5.5 MTR.
NECK BEARING BUSH TO BE CLEANED, CALIBRATED AND POLISHED TO BRING THE DIMENSIONS WITHIN LIMIT. RENEW THE BUSH IF REQUIRED, BUSH SHIP SUPPLY.
GREASING OF RUDDER STOCK AND TRUNK TO BE CARRIED OUT AFTER COMPLETION OF REPAIR AS PER RECOMMENDED PROCEDURE. 165 KG OF GREASE TO BE PUMPED IN EACH SYSTEM (STOCK & TRUNK). GREASE SHIP SUPPLY.
AFTER RUDDER REAPIR WORK . TRIAL TO BE SHOWN TO THE SATISFACTION OF SUPDT. /SHIPSTAFF AND NECESSARY ADJUSTMENT TO BE DONE .
STEERING GEAR. DETAIL: TENFJORD, TYPE: SR642-FCP
TO CHANGE FILTER AND RENEW OIL (APPROX 400 LTRS EACH). OIL SHIP SUPPLY.
STEERING ACTUATOR TO DISMANTLE, OVERHAULED, ALL SEALS, BEARINGS AND CONSUMABLES TO RENEW . SPARE SHIP SUPPLY. AFTER OVERHAUL, SAME TO BOX ED AND SATISFACTORY TRIALS TO BE SHOWN. THE JOB TO BE CARRIED OUT UNDER SUPERVISION OF COMPETENT ENGR/OEM'S ENGINERR/SERVICE ENGINEER.
PORT & STBD KORT NOZZLE( MAKE: WARTSILA).
DRAIN PLUGS (4NOS.) FOR KORT NOZZLE TO REMOVE IN PRESENCE OF CEO / SUPDT AND TO CHECK FOR WATER INGRESS, DRAIN PLUG TO BE FITED BACK AND TIGHTENED WITH NEW WASHER AND SEAL WITH CEMENT AFTER FITTING IN PLACE.WASHER AND CEMENT CONTRACTOR SUPPLY.
PRESSURE TEST OF THE KORTZ NOZZLES TO BE DONE.
BOTH KORTZ NOZZLES TO FLOAT COAT WITH 20 LTRS OF FISH OIL, FISH OIL PROCURE AND SUPPLY IN CONTRACTOR SCOPE
BOW THRUSTER & STERN THRUSTER . PARTICULAR: WARTSILA CT150H-D,589KW at 1780 RPM,PPROPELLER DIA./SPEED -- 1500MM/436,WEIGHT-1856 KGS,4 NiAL BRONZE BLADES EACH 53 KGS.
TRUSTER TUNNEL GRATINGS (BOTH SIDE)TO REMOVE, CLEAN AND PAINT AND FIT BACK AFTER THE JOB.
THE CRACK ON COMPENSATING RING (MATERIALS = S.S) IN THRUSTER TUNNEL TO BE REPAIRED. CRACK REPAIR PLAN NEEDS TO BE APPROVED BY CLASS. APPROX 10 NOS CRACK OF 100 MM LENGTH EACH.
ALL FOUR BALDES TIP CLEARENCE OF EACH THRUSTER TO BE CHECKED AND RECORDED
BALDES MOVEMENTS AND ZERO PITCH TO BE CHECKED PRIOR DISMANTLING THE BLADES AND FINAL ZERO PITCH TO BE CHECKED AND ADJUSTED AFTER FITTING THE BLADE.
ALL FOUR BLADES OF EACH THRUSTER TO BE REMOVED FROM PLACE . AFTER REPAIR JOB ALL BALDES TO BE FITTED BACK WITH NEW SEAL RING (SHIP SUPPLY SPARE)
ALL FOUR BALDES OF EACH THRUSTER TO BE POLISHED & BUFFED.
ALL FOUR BLADES ROOT AND BOTH SIDES TIP OF EACH TRUSTER TO CHECK FOR CRACKS USING DYE PENETRANT TEST
ALL FOUR BLADES BOLTS OF EACH THRUSTER TO CHECK FOR CRACK USING DP TEST.
ALL FOUR BLADES FOOT OF EACH THRUSTER TO BE SKIMMED AS PER OEM INSTRUCTION
TRUSTER OIL TO BE DRAINED SYSTEM TO BE FLUSHED AND NEW FRESH OIL TO BE TAKEN. OIL TO BE SUPPLY FROM SHIP STOCK. OIL QTY-415 LTRS FOR EACH THRUSTER
VERTICAL SHAFT OIL SEALS RENEWAL . THE THRUSTER MOTOR TO BE REMOVED FROM PLACE AFTER DISCONNECTION OF ALL POWER CABLE TO MOTOR. SOME PIPE LINES MAY REUIRED FOR REMOVING TO FACILATE MOTOR REMOVAL JOBS. THRUSTER COUPLING TO BE REMOVED AND THEN VERTICAL SHAFT OIL SEALS TO BE RENEWED.
ROUTINE - CHECKS ON BLADE FOOT SEALS FOR ANY LEAK,CHECK POD COATING FOR ANY DAMAGE, REMOVE THE DOME COVER AND CHECK THE CONDITION OF OD VALVE. TOOTH CONTACT TO BE CHECKED. GEAR TO CHECK VISUALLY AND BY MEASURING THE BACKLASH AND COMPARE WITH ALLOWED BAKLASH TO BE CARRIED OUT AS PER OEM GUIDELINES, RENEWAL OF BALDE FOOT O RING, BOLTS O RING ETC. INSPECTION COVER TO FIT BACK WITH NEW PLUG AND SEAMLESS ORING.
PROPELLER SHAFT SEAL TO BE RENEWED BY IN SITU BONDING METHOD (SEAL SHIP SUPLY). SEALS SYSTEMS TO BE CHECKED UNDER STATIC HEAD FOR LEAKAGES. INSITU BONDING TO BE CARRIED UNDER SUPERVISION OF OEM AND INSITU BONDING WILL BE REQUIRED FOR PROPELLER SHAFT SEAL RENEWAL.
ALL THREE THRUSTER HEADER / EXPANSION TANK TO BE CLEANED. HEADER TANK AIR PRESSURE REGULATING VALVE (0 TO 2 KG/CM2)TO BE PROCURED AND FIT.PROCURE,SUPPLY AND FITMENT OF AIR PRESSURE REGULATING VALVE (0 TO 2 KG/CM2)IS IN CONTRACTOR SCOPE.
MAJOR OVERHAULING OF TWO THRUSTER: 1. POD ASSEMBLEY TO BE REMOVED FROM THRUSTER TUNNEL. 2. POD TO BE TRANSPORTED TO WORK SHOP. 3. COMPLETE DISMANTLED OF POD AT WORK SHOP. 4. PROPELLER SHAFT TO BE REMOVED. 5. VERTICAL SHAFT TO BE REMOVED. 6. HUB TO BE DISMANTLED. 7. ALL INTERNAL PARTS TO BE CLEANED. 8. ALL PARTS(AS RERUIRED) TO BE DP TESTED. 9. CALIBRATION AND RECORD OF ALL PARTS (AS REQUIRED). 10. ALL BEARINGS AND SEAL, GASKET TO BE RENEWED. 11. GEAR BACK LASH TO BE MESURED AND ADJUSTED. 12. AFTER ASSEMBLEY ALL PARTS, HUB ASSEMBLEY TO BE PRESSURE TESTED . 12. PITCH OPERATION TO BE CHECKED BY AIR PRESSURE. 13. POD TO BE TRANSPORTED BACK TO VESSEL AND FITTED IN PLACE. 14. ALL CONNECTION TO BE MADE AS PER ORIGINAL.
FOLLOWING SPECIAL TOOLS TO BE FEBRICATE FOR THRUSTER MAJOR OVERHAULING JOB : 1. SUPPORT STAND (1.5 MTR X 1 MTR X25MM). 2. C CHANNEL (100MM X 5MM THICK X 2 MTR LONG). SPANNER 1.5 MTRX 1.5 MTR X 25MM , 3 SPANNER NEEDS TO BE FEBRICATED WITH SLOT MACHINING AND KEY. 4. BLANK FLANGE (OD 220MM, 25MM THICK WITH 06 HOLE OF 29MM DIA) TO BE MADE FOR BLADE FOOT FOR PRESSURE TESTING PURPOSE. 5. TORQUE SPANNER 40NB 100MM PIPE. 6. LIFITING CLAMP 40NB 100MM PIPE THREADED PIECE 02 NOS WITH 02 NOS OF EYE PAD WELDED. 7. SUPPLY BRASS SHIM OF SIZE 0.02, 0.04, 0.05, 0.07, 0.15 MM THICK EACH SHEET OF 350MM X 1000MM. ALL REQUIRED MATERIALS TO BE PROCURED,SUPPILED AND FITTED IN CONTRACTOR SCOPE.
SRI SRINIVASA ENGINEERING WORKS
SRISAI OILFIELD EQUIPMENTS AND MARINE SERVICES PVT LTD
prabhu engineering works
VENKATESWARA ENGINEERING WORKS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .