| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.2 Cr+₹1.2 Cr (39.2%)Admitted-Finance 401 4TH FLOOR CAPITAL PARK IMAGE GARDEN LANE HI TECH CITY MADHAPUR HYDERABAD TELANGANA 500081 INDIA | HYDERABAD | TELANGANA | 500081 | ₹4.2 Cr+₹1.2 Cr (39.2%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SATRA Services and Solutions Private Limited L2 | JAIMAN Construction and Consultants LLP L1 |
|---|---|---|---|---|---|
| 1.00Remuneration for Local Staff | |||||
| 1.01 | Team Leader cum Senior Highway Engineer | 5 | Month | 2,75,000 ₹13,75,000 | 1,50,000 ₹7,50,000 Lowest |
| 1.02 | Senior Bridge Engineer | 2.5 | Month | 2,55,000 ₹6,37,500 | 1,25,000 ₹3,12,500 Lowest |
| 1.03 | Highway cum Pavement Engineer | 2.5 | Month | 2,55,000 ₹6,37,500 | 1,25,000 ₹3,12,500 Lowest |
| 1.04 | Material cum Geotechnical Engineer cum Geologist | 3 | Month | 1,95,000 ₹5,85,000 | 1,25,000 ₹3,75,000 Lowest |
| 1.05 | Senior Survey Engineer | 4 | Month | 1,95,000 ₹7,80,000 | 1,25,000 ₹5,00,000 Lowest |
| 1.06 | Traffic and Safety Expert | 2.5 | Month | 1,35,000 ₹3,37,500 | 1,25,000 ₹3,12,500 Lowest |
| 1.07 | Enviroment Specialist | 2 | Month | 1,90,000 ₹3,80,000 | 1,25,000 ₹2,50,000 Lowest |
| 1.08 | Quantity Surveyor / Documentation expert | 5 | Month | 1,72,000 ₹8,60,000 | 1,25,000 ₹6,25,000 Lowest |
| 2.00Sub Professional Staff (To be assessed by consultant as per requirement of assignment) | |||||
Tender Value
₹3.4 Cr
EMD Value
₹4.2 L
Closing Date
9 Feb 2024, 12:00 pmClosed
HQ CE (P) Arunank (GREF)
HQ CE (P) Arunank (GREF), Dam site, Naharlagun, AP
ENGAGING TECHNICAL CONSULT FOR PREPARATION OF FS DPR ON EPC MODE FOR CONST RD TAPA-KARU-SERING-BAGAN (NEW ALIGNT) KM 0.00 TO KM 68.00 (NET L 68.000 KM) GREEN FIELD ALIGNT TO NHSL SPECIFICATIONS IN AOR OF 85 RCC UNDER 756 TF P ANK IN THE STATE OF A. P
2024_BRO_636819_1
ANK/NIT-25/2023-24 (2nd Call)
Open Tender
Consultancy Services
Works
150 days
AT KM 0.00 TO 68.00 ON TAPA-KARU-SERING-BAGAN RD
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹4.2 L
Yes
HQ CE (P) Arunank (GREF)
22 Feb 2024
10 Jan 2024
10 Feb 2024
12 Jan 2024
9 Feb 2024
20 Jan 2024
13 Jan 2024 - 16 Jan 2024
19 Jan 2024
Amount
Remuneration for Local Staff
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Material cum Geotechnical Engineer cum Geologist
Senior Survey Engineer
Traffic and Safety Expert
Enviroment Specialist
Quantity Surveyor / Documentation expert
Sub Professional Staff (To be assessed by consultant as per requirement of assignment)
Position
Position
Position
Position
Position
Position
Position
Support Staff Note : To be assessed by consultant as per requirement of assignment)
Office Manager
Typist
Office Boy
Night Watchman
Transportation (Fixed Cost)
The Vehicle provided by the consultant shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc A. For use of Consultants
Duty travel to Site (Fixed Cost)
Trips
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies Drafting
Supplies Computer
Running Costs
Domestic and International Communication
Office Furniture and Equipment (Rental)
Office Furniture and Equipment
Reports and Document Printing
Monthly Reports (3 Copies per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Enviroment Assessment report & RAP
Final Enviroment Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Document
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. Final EMP
Final EMP
Final Bidding Documents
Draft 3(a), 3(A) and 3(D) notification for land acquisition (03 copies each)
LA & Clearances II Report
Survey and Investigation
A. Tropographical Survey (Fixed Cost)
Tropographical Survey including hire charges for eqipment and supply of survey team comprising of project survey field staff etc. inclusive of cost of materials, labourer
Detailed topograhic surveys using mobile/aerial LiDAR or equivalent technology
B. Investigation (Fixed Cost)
Road and Bridge Inventory
BBD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Any other Investigation/Surveys
Sub-soil Investigation
Boring in all type of soils (Other than hard rock)
Boring in hard rock
Estimate of Cost for Expatriate Consultants ( Name and Position to be filled in below columns by the bidder) Renumeratrion of Expatriate Satff including per diem allowance
Position
Position
Position
Position
Position
Position
Mobilization and Demobilization - International Airfares (Fixed Cost) (To be filled by the bidder in below columns)
Position
Position
Position
Position
Position
Position
Mobilization and Demobilization -Inland Travel in Home Country (Fixed Costs)
Other Miscellaneous expenses (Like DA, Internal travel expenses other than incidentals) (Fixed Cost)
SATRA Services and Solutions Private Limited
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
RFPDPRTapaKaruSeringBagan06Jan2024.pdf
Tender Documents • 1.17 MB
BOQ_712915.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .