Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 CrAccepted-AOC BARKOT UTTARKASHI | RUDRA PRAYAG | UTTARAKHAND | 246141 | ₹1.8 Cr | 1 | Accepted-AOC QUALIFIED FOR AOC |
| 2 | 2₹1.9 Cr+₹5.9 L (3.26%)Rejected-Finance | ₹1.9 Cr+₹5.9 L (3.26%) | 2 | Rejected-Finance NOT QUALIFIED FOR AOC |
| 3 | 3₹1.9 Cr+₹10.7 L (5.96%)Rejected-Finance DEHRADUN VICTORIA CROSS VIJETA GABAR SINGH URJA BHAWAN KANWALI ROAD DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹1.9 Cr+₹10.7 L (5.96%) | 3 | Rejected-Finance NOT QUALIFIED FOR AOC |
Tender Value
Refer Docs
EMD Value
₹3.6 L
Closing Date
25 Mar 2023, 12:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER,EDC KARANPRAYAG
E-TENDER NO.55/EDC(K)/2022-23 REPLACEMENT OF EXISTING 11KV ACSR WEASAL CONDUCTOR TO AAAC COVERED CONDUCTOR 70 SQMM FOR 11KV KEDARNATH FEEDER FROM SONPRAYAG TO RAMBADA UNDER 33/11KV S/S SONPRAYAG UNDER EDD, RUDRAPRAYAG ON SEMI-TURNKEY BASIS.
2023_UPCL4_56140_2
55/EDC(K)/2022-23
Open Tender
Repair and Maintenance Works
Turn-key
180 days
RUDRAPRAYAG
AS PER NIT
3 documents required · 3 mandatory
₹11,800
EE ETD KARANPRAYAG
₹3.6 L
Yes
24 Jul 2023
18 Mar 2023
27 Mar 2023
18 Mar 2023
25 Mar 2023
18 Mar 2023
SUPPLY OF MATERIAL PORTION
11 KV AAAC 70 Sq mm covered conductor {As per EN. 50397(2006)} Aconductor shall be strended round non-compacted and water tight 2006 The standred conductor shall be longitudinally water blocked by the mean of water blocking material The semi-conductring screen inner insulation and outer insulation should be extrucded in one step The outer covering insulation shall ber UV-Stablized tracking resistance black XLPE
MVCC Accessories (As per EN - 50397-2) as below:
11 KV tension with ball and IPC
33 KV cable ties for Pin insulator
11 KV IPC for covered to covered connection
11 KV IPC for covered to bare conductor
11 KV Mid span jointing kit
IPC with Aluminium bail for earthing
PP & clamp sp-23 with N&B
STAY SET 16*1800 MM
STAY WIRE 7/10 SWG
LABOUR PORTION
Cartage of material from central store Srinagar to road side including loading and unloding dist 0-80km
ST pole SP 23 (galvanised hot dip)
Small Material
Head load cartage of following material from road side to work side dist. Approx 03 km loading/unloading complete
ST pole SP 23 (galvanised hot dip)
Small Material
Removing of old conductor with opening of existing jumpering and making of bundle with carriage from pit to JE Store including loading/unloading complete
laying spreading stringing sagging of 11 kv line in 3 phase of the following wire as phase wire including proper sagging with binding and jumoering as per user mannual and sagging complete work
11 kv grade conductor covered conductor AAAC with 70 sq mm.
Excavation of earth and erection of 11 kv single support with cc COMP
Fixing , tightening and Nozzeling of Stay With pole and Stay rod on required Tension as per per drawing
Digging Pit of Stay Set 0.6x0.6x1.2 Mtr in All Type of Soil
Grouting of Stay in Size 0.6x0.6x0.3x444=13.716 Cub mtr in CC ratio (cement sand & Stone ballast Back Fiiling of Soil and boulder in pit
Fabrication citting and drilling of steel
Fixing of MVCC Accessories
11 KV tension with ball and IPC
33 KV cable ties for Pin insulator
11 KV IPC for covered to covered connection
11 KV IPC for covered to bare conductor
11 KV Mid span jointing kit
Chemical Earthing on pole structure (Existing/New)
PP & clamp sp-23 with N&B
T S Power Co
M/S GOVERDHAN TRADERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .