Executive Engineer I-FC Division Kargil
Executive Engineer I-FC Division Kargil
Construction of flood protection bund/Nallah training at Olikhotu Chiktan RD 127-250mtr (Both side)
2026_PWD_18935_1
Fresh e-Tender 03 of 2026-27/INFC Kargil
Open Tender
Civil Works - Canal
Works
90 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹340
Payable To Executive Engineer I-FC Division Kargil
₹68,000
13 May 2026
13 May 2026
25 May 2026
13 May 2026
23 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means over areas (exceeding 30cm in depth ,1.5m in weadth as well as 10 sqm on plan ) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m ,as directed by Engineer -in-charge | |||||
| 1.01 | All Kind of Soil 85% | 185.57 | Cum | 531.04 | ₹98,545.09 |
| 1.02 | Ordinary Rock 10% | 21.83 | Cum | 842.03 | ₹18,381.51 |
| 1.03 | Hard Rock (B.P) 05% | 10.91 | Cum | 1,987.92 | ₹21,688.21 |
| 2Earth work in excavation by manual means in foundation trench or drains (not exceeding 1.5m in weadth or 10 sqm on plan )including dressing of sides and ramming of bottoms ,lift upto 1.5m ,including getting out the excavated soil and disposal of surplus excavated soil as directed ,within a lead of 50m | |||||
| 2.01 | All Kind of soil 85% | 239.94 | Cum | 431.41 | ₹1,03,512.52 |
| 2.02 | Ordinary Rock 10% | 28.22 | Cum | 954.5 | ₹26,935.99 |
| 2.03 | Hard Rock (B.P) 05% | 14.11 | Cum | 1,947.26 | ₹27,475.84 |
| 3 | Cast in situ plum concrete work of nominal mix concrete M-10 grade (total mass of dry nallah aggregate 480kg(max excluding plums) and water 34Kg (max) per 50kg of cement) nominal max size of stone aggregate 20mm, volumetric batching using plum aggregate 20mm, volumetric batching using plum (size over 160mm, split nallah stone or quarry stone) @20% of gross volume upto plinth level excluding cost of form work and including curing complete.. | 383.76 | Cum | 5,330 | ₹20,45,440.8 |
| 4 | Centering and shuttering incld.strutting propping etc. and removal of from for wall any thickness incld. Attached pilaster, buttresses plinth and string coarse ect walls of any thickness | 1,279.2 | Sqm | 614.86 | ₹7,86,528.91 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_45234.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .