₹1.4 L
Closing Date
4 Dec 2023, 5:00 pmClosed
Superintending Engineer
Superintending Engineer, Uttarakhand Jal Sansthan Circle Gopeshwar, (Chamoli)
Supply, Laying and Jointing of G.I. Pipe line (m) and other appurtenant works of Phase Bhenti w/s Water supply scheme in block Nandanagar of District chamoli under Jal jeewan mission
2023_UKJS_65810_2
631/Vividh/2023-24 dated 20.11.2023
Open Tender
Civil Works - Water Works
Item Wise
75 days
Gopeshwar Chamoli
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Executive Engineer, UJS
₹1.4 L
Gopeshwar Chamoli
5 Dec 2023
22 Nov 2023
5 Dec 2023
22 Nov 2023
4 Dec 2023
22 Nov 2023
28 Nov 2023
Rates for Supply, Laying & Jointing of G.I. Pipe line (m) and other appurtenant works of Phase Bhenti w/s Water supply scheme in block Nandanagar of District chamoli under Jal jeewan mission FY 2023-24.
Source Work:-
Cost of steel intake chamber size of 0.60 x 0.60 m complete as per type design and painted with anti corrosive paint
Construction of Roughening Filter cum Collecting Chamber including supply of all material, labour, T&P etc complete
Construction of R.R.1:6 Cement & Sand Motar along the source Protaction.
RR stone masonary laid in dry for proper completion of work along the pipe line.
SUPPLY MAIN WORKS
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 50% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock. Earth soil mixed with Boulders & Bajari
Medium Rock
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete. G.I. Pipe Medium quality 40 mm dia
Supply of all materials, labour, T&P etc and construction of R.C.C. CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2 . C.W.R 35.00 KL
Construction of R.R.1:6 Cement & Sand Motar along the CWR Protaction.
RR stone masonary laid in dry for proper completion of work along the pipe line.
Supply and installation of bucket type chlorinator of 25 liters capacity including bleeching powder solution doser, chloroscope kit with stop cock & iron cage fabricated with 25 mm x 25 mm square mesh with locking arrangements below dozer to protect flexible pipe connection with CWR complete with all arrangements in position.
Supply and fixing of the following fittings including cartage of materials,labours ,T.&P. etc. Complete Gate valves (Class-I)as per I S 788/1997 40 mm dia
High head cast iron air valves (15 mm, T.P-10 kg / Sqcm)
Supply of all materials,labours ,T.&P. etc.and construct Wheel valve chamber as per type design complete size 0.60x0.60 m.
Supply of all materials,labours ,T.&P. etc.and construct Wheel valve chamber as per type design complete size 0.60x0.60 m.
Construction of R.R.1:6 Cement & Sand Motar along the source Protaction.
RR stone masonary laid in dry for proper completion of work along the pipe line.
DISTRIBUTION SYSTEM
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 50% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock. Earth soil mixed with Boulders & Bajari
Medium Rock
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete. G.I. Pipe Medium quality 20 mm dia
25 mm dia
32 mm dia
40 mm dia
50 mm dia
Dismantling of following dia screwed and socketed G.I. Pipes, specials and fittings including taking out of dismantled G.I. pipes and specials from trenches and stacking them properly within 50.00m but excluding the cost of earth work Relaying of dismantled G.I. Pipe in true alignment in trenches including supply of all materials, labour, T&P etc. complete. 20mm dia
25mm dia
32mm dia
40mm dia
Supply and fixing of the following fittings including cartage of materials,labours ,T.&P. etc. Complete Gate valves (Class-I)as per I S 788/1997 20 mm dia
25 mm dia
32 mm dia
50 mm dia
Supply of all materials,labours ,T.&P. etc.and construct Wheel valve chamber as per type design complete size 0.60x0.60 m.
Cartage of following pipes, specials & fittings from Rishikesh to site store for proper completion of works.
Supply of all materials labour and T&P etc andc construct pippar type stand post as per type design for given FHTC
Provision for Cutting of C.C. Khharinja
Reinstatement of Khharinja C.C. Khharinja
RR stone masonary with 1:6 cement and sand mortar nearby along the pipe line for proper completion of work.
RR stone masonary laid in dry for proper completion of work along the pipe line.
Murkhulya Singh Rawat
PRAHALAD SINGH RAWAT
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .