Executive Engineer, R&B Division, Bhuj
Renovation of Town Planner office in Bahumali Bhavan (Room No: 115, 116) at Bhuj (Providing new Windows, Doors, Flooring work, Ceiling work, Wall Paneling, Colour work and other Misc. works)
337899
41 For 2026-27
Open
Repair and Maintenance
Works
Kutch
10 documents required · 10 mandatory
₹1,500
Executive Engineer, R and B Division, Bhuj
₹38,000
24 Aug 2026
24 Aug 2026
24 Aug 2026
7 Sept 2026
24 Aug 2026
Name of work :-
Renovation of Town Planner office in Bahumali Bhavan (Room No: 115, 116)
at Bhuj (Providing new Windows, Doors, Flooring work, Ceiling work, Wall
Paneling, Colour work and other Misc. works)
Bill of Quantity
Memorandum showing items of works to be carried out.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
1 14.00 Dismantling doors, windows, 192.09 Rupees One Each
ventilators etc. (wood or steel) Hundred
shutters including chowkhats, Ninety Two
architraves, holdfasts and other And Paise Nine
attachment etc. complete and Only
stacking them within all lead and
lift. (I) Not exceeding 3 sq.m. in
2 167.30 Dismantling of tiled/stone floors 49.12 Rupees Forty Smt
laid in mortar incl. stacking of Nine And Paise
serviceable materials and disposal Twelve Only
of unserviceable materials with all
3 33.90 Removing Existing Aluminum 303.00 Rupees Three Smt
partition. including sliding door Hundred Three
(where Req) as per instruction By Only
Engineer in charge.
4 275.00 Providing and fixing MDF wall 4895.47 Rupees Four Smt
panelling or Wooden Partition (Its Thousand
include doors any size and Eight Hundred
thickness materials like wooden Ninety Five
flush door & glass door and its And Paise
necessary fixtures) with using Forty Seven
different thickness of ply M.R. Only
grade plywood in frame and box
section with 0.80 to 1.0mm thick
decorative laminate wtih necessary
other fixtures and fastening etc.
complete or as directed by Engineer
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
5 32.70 Providing and laying 18 mm thick 2966.37 Rupees Two Smt
polished Black or colour Granite Thousand Nine
stone slab machine cut in single Hundred Sixty
piece with all exposed edges Six And Paise
polished, chamfered and proected Thirty Seven
6mm from finished wall thickness Only
in sill and jambs laid on 10 mm
thick cement mortar 1 : 3 (
cement : 3 coarse sand ) laid over
and jointed withgrey cement slurry
including rubbing and polishing
etc. complete. also Fixing: Rear
face of granite shall be standed
using clean sand sieve no.
passed 2mm fixed with araldite and
dried for at list 36 hours.
6 1.50 Providing and fixing standard 5037.88 Rupees Five Smt
aluminum glass windows having Thousand
standard extruded anodized Two Thirty Seven
track sliding window jindal series E- And Paise
30 mm section frame- bottom with Eighty Eight
gutter section No 20878(1.906 Only
Kg/Rmt), Top & Side section no.
20877(1.685 KG/Rmt), shutter size
50 x 20 mm Top & Lock rail section
No. 21675(0.766 Kg./Rmt), Bottom
rail section No 20772 (0.948
Kg/Rmt), Interlock rail section No
20550(0.994 Kg/Rmt) with 5mm
thick transperant float glass with
rubber gasket, air lock strip and
finishing joint with transparent
silicon sealant with aluminum
powder coated fittings and fixture
complete as per detailed drawing
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
7 24.50 Providing and fixing standard 5121.71 Rupees Five Smt
aluminum glass windows having Thousand One
standard extruded anodized Three Hundred
track sliding window jindal series C- Twenty One
20 mm section frame- bottom with And Paise
gutter section No 21651(1.864 Seventy One
Kg/Rmt), Top & Side section no. Only
21650 (1.685 KG/Rmt), shutter
size 50 x 20 mm Top Rail section
No. 20530(0.571 Kg./Rmt), Bottom
Rail section No 20529 (0.642
Kg/Rmt), Side Rail section No
20544 (0.495 Kg/Rmt), interlock
rail section No.20531(0.697
Kg/Rmt) with 5mm thick
transperant flot glass with rubber
gasket, air lock strip and finishing
with transparent silicon sealant
with alumium powder coted fittings
and fixtures complete as per
detailed drawing etc. complete.
8 8.40 Providing and fixing 35 mm thick 2931.02 Rupees Two Smt
flush door with solid core Thousand Nine
construction finished with 1 mm Hundred Thirty
thick lamination on both side with One And Paise
S.S handle and S.S Fixtures and Two Only
fastening including anodised
alluminium butt hinges with
necessary screws labour & material
equipments as directed
9 174.50 Pro. And fixing single layer water 606.95 Rupees Six Smt
proof gypsum board 12.5 mm thick Hundred Six
sections using water proof board of And Paise
size 1220 mm x 1830 mm x 8.0 Ninety Five
mm suspended by GI suspender Only
channel of size 25 mm x 3 mm with
intermediate channel og size
mm center to center ceiling section
of size 40 mm x 35 mm x 0.55 mm
at 457 mm c/c and perimeter
channel A of size 20 mm x 27 mm x
30 mm x 0.5 mm at edges & drops
incl.paper tap sand sofit cleat,
anchor fastener, scoch bolt
connecting cleat, joining compound
top coat on ceiling incl.making
necy. opening for light fitting,
diffuser etc. comp. as per detail
drawing as directed.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
10 910.00 Providing and fixing M.S. grills of 113.12 Rupees One Kg
required pattern to wall frame of Hundred
windows etc. with 16mm M.S. Thirteen And
polished square bar at required Paise Twelve
spacing and frame of 5 cm x 3 mm Only
flat alround with necessary hold
fast including applying priming
coat and two coats of oil painting
11 1061.00 Applying two coats of putty & two 40.59 Rupees Forty Smt
coats of primer of approved brand And Paise Fifty
and manufacture on new wall Nine Only
surface to give an even shade
including thoroughly brushing the
surface free from mortar dropping
and other foreign matter and sand
papered smooth.
12 1061.00 Wall painting (two coats) with 84.37 Rupees Eighty Smt
plastic emulsion paint of approved Four And Paise
brand and manufacture on Thirty Seven
undecorated wall surface to give an Only
even shade including throughly
brushing the surface free from
mortar droppings and other foreign
matter and sand papered smooth.
13 16.00 Wooden cupboards Providing and 16438.76 Rupees Sixteen Nos.
supplying Full height Storage Thousand Four
Storage unit made with using Hundred Thirty
19mm The Plywood (MI) structure I Eight And
and finished with 1.0 mm The Paise Seventy
decorative laminate(124) sheet or Six Only
outside & and 0.8 mm The liner
laminate (125) on inside as
specified / approved by architect
with fixed with necessary fixtures
and fastening (Hardware) (114), as
per architect drawing. The similar
Ply + laminate made shutter shall
be fixed with required handle
(MTS), hinges (M18), magnet (M18)
& Locks (MTG) complete with
bidding patties (14) and all required
hardware (M14). I Ply shelves
removable Type supported on side
leak wood (M5) battens on both
sides. All exposed edges shall be
covered with 8 I mm Thk. Teak
wood beading Patti (M4) finished
with melamine polish (M29).
Complete or as directed as per
architect drawing and as per
instruction of architect & engineer
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
14 16.00 Wooden cupboards Providing and 11307.96 Rupees Eleven Nos.
supplying Low Height Storage unit Thousand
made with using 19mm The Three Hundred
Plywood (MI) structure I and Seven And
finished with 1.0 mm The Paise Ninety
decorative laminate(124) sheet or Six Only
outside & and 0.8 mm The liner
laminate (125) on inside as
specified / approved by architect
with fixed with necessary fixtures
and fastening (Hardware) (114), as
per architect drawing. The similar
Ply + laminate made shutter shall
be fixed with required handle
(MTS), hinges (M18), magnet (M18)
& Locks (MTG) complete with
bidding patties (14) and all required
hardware (M14). I Ply shelves
removable Type supported on side
leak wood (M5) battens on both
sides. All exposed edges shall be
covered with 8 I mm Thk. Teak
wood beading Patti (M4) finished
with melamine polish (M29).
Complete or as directed as per
architect drawing and as per
instruction of architect & engineer
15 66.00 Providing & fixing compactor of 6389.26 Rupees Six Smt
Base frame fabricated from cold Thousand
formed channel & angle sections of Three Hundred
10/14 Gauge Thick HRC material Eighty Nine
and sections Sizes of 25 x 100 x 25 And Paise
mm, 25/45 x 100 x 25/45 mm, 45 Twenty Six Only
x 45 mm with guide rails comprises
of solid round shaft of 30 mm
(Bright bar) in ground finish, press
fit in to cold formed 'U' channel
made from 14 G Thick material
completely grouted within the floor
with 0 – 0 levelling having 4 Nos. of
Cast Iron Wheels of Size : 128 X
28mm (moving on a pair of rails)
for units of lengths less than
mm. All units more than length
3540 mm shall have 6 nos. of cast
iron wheels of size 128 x 28 mm
(moving on 3 Nos. of rails). The
Driving wheel will comprise of a
central hub resting on a pair of
roller bearings with 3 insertable
arms engaging into the hub.
Boltless type shelves made of
SWG C.R.C.A, quality steel having
8 folds each designed to carry a
U.D.L. of 50 Kgs. Vertical and
central panels made out of 22 SWG
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
16 167.30 P & L vitrified 6 mm thick tile 1467.72 Rupees One Smt
flooring over 20 mm (average) base Thousand Four
of cement mortar 1:6 ( 1 cement: 6 Hundred Sixty
coarse sand) on new surface or Seven And
fixing on existing flooring by Paise Seventy
adhesive material including Two Only
dismentaling of existing flooring
and jointed with color cement
slurry including finised with flush
pointing & cleaning the surface etc.
complete for DARK shade
17 18.00 Main Table with side unit providing 21543.30 Rupees Twenty Nos.
and supplying Main Table made One Thousand
with 19mm The Plywood (MI) Five Hundred
structure as per architect drawing ' Forty Three
finished with 1.0 mm The And Paise
decorative laminate (M24) on Thirty Only
outside portion &0.8 mm The liner
Laminate inside as specified &
approved by architect fixed with
necessary fixtures and fastening
(Hardware) (M14) as per architect
drawing. Provide Plastic Computer
Desk Table Grommet Cable Wire
Outlet Hole Cover, 60mm, Key-
board trey, 5.5. legs, Drawers with
telescopic roller channels (115),
Handle (M19) and locking (M16)
arrangements with all necessary
fixtures and fastening (114).
Provide Shutters as per drawing
fixed with handle (119), hinges
(M18), magnet 114), complete with
bidding patties and all required
hardware 114). Provide footrest as
per drawing All exposed edges shall
be covered with required Teak wood
beading Patti (14) finished with
approved melamine polishing (129)
work. Complete as per architect's
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
18 9.00 Table with side storage unit and 16960.93 Rupees Sixteen Nos.
Partition providing and supplying Thousand Nine
Table made with 19mm The Hundred Sixty
Plywood (M1)structure as per And Paise
architect drawing finished with 1.0 Ninety Three
mm The decorative laminate (M24) Only
on outside portion &0.8 mm The
liner Laminate inside as specified &
approved by architect fixed with
necessary fixtures and fastening
(Hardware) (M14) as per architect
drawing. Provide Plastic Computer
Desk Table Grommet Cable Wire
Outlet Hole Cover 60mm, Key-
board trey, Soft-board, 5.5. legs,
Drawers with telescopic roller
channels (115), Handle (M79) and
locking (M16) arrangements with
all necessary fixtures and fastening
(M14). Provide Shutters as over I
drawing fixed with handle (119),
hinges (118), magnet (M14),
complete with bidding patties and
all required hardware (M14).
Provide footrest, solid partition (38
mm The Plywood(MY) structure) &
Glass partition (10mm this.
Toughened glass (M27) with
Polished Edges. Fixed with
19 25.90 Providing & Fixing Roller blind type 3394.00 Rupees Three Smt
curtain for window opening Thousand
including all material & Labour as Three Hundred
per instruction of Engineer in Ninety Four
20 50.30 Glass Top- Providing, supplying 1535.20 Rupees One Smt
and installation 8mm thick clear Thousand Five
glass on top on laminate or veneer Hundred Thirty
finished table rest on vaccumes as Five And Paise
reuires. Glass have bewel edjes. Twenty Only
fitting as per details given in
drawing asper instructions of
architect/ engineer in charge.
contractor has to provided all
necessry cut outs for electrical
work & no extra payment shall be
Rupees Thirty Seven Lakh(s) Eighty Thousand Two Hundred Sixty Eight And Paise Twenty
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 Labour Cess shall be recovered as per SBD
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items
where there is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Executive Engineer
R & B Division, Bhuj
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Additional Instructions.pdf
BOQ.pdf
BUILDING SPECIFICATIONS BOOK.pdf
GR.pdf
SBD Book.pdf
Spe. Index.pdf
Specification town planer.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].