Loading…
Loading…
Tender Value
₹16.5 Cr
EMD Value
₹16.5 L
Closing Date
5 May 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, R&B Division, Bhuj
Construction Work of New Cross Drainage, Repairing of Cross Drainage, Structure & bridge repair Work & Other Misc. Work on Various Roads as & when required or in Emergency Under Jurisdiction of R & B Sub Division, Road R & B Bhuj &, Mandvi & Nakhatrana Kachchh. (Annual Rate Basis)
299210
10 For 2026-27 (2nd Attempt)
Open
Civil Works - Bridges
Kutch
15 documents required · 15 mandatory
₹18,000
Executive Engineer, R&B Division, Bhuj
₹16.5 L
27 Apr 2026
27 Apr 2026
27 Apr 2026
5 May 2026
27 Apr 2026
Name of work :-
Construction Work of New Cross Drainage, Repairing of Cross Drainage,
Structure & bridge repair Work & Other Misc. Work on Various Roads as &
when required or in Emergency Under Jurisdiction of R & B Sub Division,
Road R & B Bhuj &, Mandvi & Nakhatrana Kachchh. (Annual Rate Basis)
Bill of Quantity
Memorandum showing items of works to be carried out.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated In Figures In Words
but may be estimated Quantities
1 50.00 Job Work for Dismentalling the 590.69 Rupees Five Job
existing Cross Drainage structure Hundred
including removing and stacking Ninety And
the dismentelled materials as and Paise Sixty
where directed (A) R. C. C. work, Nine Only
Brick masonary , UCR masonary,
Pipe etc. Complete as per
instruction of Engineer In Charge.
2 6859.00 Excavation for foundation upto 1.5 157.32 Rupees One Cum
m depth including sortingout and Hundred Fifty
stacking of useful materials and Seven And
disposing off theexcavated stuff Paise Thirty
upto 50 Meter lead.(B) Dense or Two Only
3 1243.00 Providing and casting in situ 3737.13 Rupees Three Cum
Ordinary cement concrete M-150 Thousand
for R.C.C. Raft and cut-off walls Seven Hundred
including necessary shuttering Thirty Seven
laying,vibrating, ramming and And Paise
curing complete. Thirteen Only
4 600.00 Supplying and fixing reinforced 3469.25 Rupees Three Rmt
concrete heavy duty non- Thousand Four
pressurepipes with collars for Hundred Sixty
culverts carrying heavy traffic as Nine And Paise
per IS 458-1991 specifications Twenty Five
including setting the pipes in C.M. Only
1:2watering and laying (to level or
slopes) of class NP3 of
followinginternal daimeters.(v)
5 200.00 Supplying and fixing reinforced 5560.00 Rupees Five Rmt
concrete heavy duty non- Thousand Five
pressurepipes with collars for Hundred Sixty
culverts carrying heavy traffic as Only
per IS 458 1991 specifications
including setting the pipes in C.M.
1:2watering and laying (to level or
slopes) of class NP3 of
followinginternal daimeters.(vii)
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
6 5556.00 Providing and casting in situ 5160.23 Rupees Five Cum
controlled cement concrete M-200 Thousand One
for R.C.C. return as per drawings Hundred Sixty
including centering And Paise
shuttering,scaffolding where Twenty Three
necessary, laying vibrating, curing Only
and finishingcomplete.(A) Height
from 0.0 to 5.0 M. For Wall
7 42980.00 Providing TMT Bar FE 500D 77.28 Rupees Kg
reinforcement for R.C.C. work Seventy Seven
including bending, binding and And Paise
placing in position complete upto Twenty Eight
8 5620.00 Filling around the pipes with 84.68 Rupees Eighty Cum
murrum including dressing , Four And Paise
tampering etc. complete. Sixty Eight Only
9 1965.00 Construction of granular Sub base 1307.95 Rupees One Cum
(Grading -I) by providing close Thousand
graded material BTMC using metal Three Hundred
53 mm to 26.5 mm@ 27.5%, Seven And
aggregate 26.5 mm to 9.5 mm @ Paise Ninety
22.5% & 9.5 mm to 4.75 mm @ Five Only
10% and stone dust 4.75 mm &
below @ 40% incl. spreading in
uniform layers with motor grader
on prepared surface mixing by mix
in place method with Front End
Loader at OMC and compacting
with vibratory roller to achieve the
desired density complete as as per
MORTH specification.
10 2547.00 Painting Two Coats on New 90.90 Rupees Ninety Sqm
Concrete Surfaces (Painting two And Paise
coats after filling the surface with Ninety Only
synthetic enamel paint in all
shades on new plastered concrete
11 4193.00 Providing & laying weep hole in 86.69 Rupees Eighty Each
Aburtments, and returns by using Six And Paise
A.C. pipe of 100mm including Sixty Nine Only
laying in proper grede and
jointingthe completed as per
detailed specification.
12 6313.00 Excavation for foundation in sand, 511.11 Rupees Five Cum
gravel, clay soft soils and murrum Hundred
etc. including shoring, strutting Eleven And
dewatering as necessary and Paise Eleven
disposing of the excavated stuff as Only
directed.(A) Depth up to 3.0 M. and
lead upto 100 m for 10 Cum
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
13 1070.00 Providing and laying controlled 3956.63 Rupees Three Cum
cement concrete M.150 for curing Thousand Nine
complete excluding cost of Hundred Fifty
formwork and reinforcement for Six And Paise
reinforced concrete work in (A) Sixty Three
Foundations, footings,Base Only
ofcolumns and Mass concrete
14 275.00 Providing and Casting in situ 4552.98 Rupees Four Cum
controlled Cement Concrete M-200 Thousand Five
for R.C.C. Raft and cutt-off walls Hundred Fifty
including necessary shuttering Two And Paise
laying, vibrating, ramming and Ninety Eight
curing complete. Only
15 263.00 Providing and casting in situ 5708.72 Rupees Five Cum
controlled cement concrete M-200 Thousand
for R.C.C. work in superstructure Seven Hundred
including centering,ramming Eight And
vibrating curing and finishing Paise Seventy
complete.(A) T-Beam and Deck slab Two Only
type of superstructure (I) Deck slab
16 332.00 Providing and casting in situ 4166.43 Rupees Four Cum
ordinary cement concrete concrete Thousand One
M-200 for approach slab including Hundred Sixty
formwork curing and finishing Six And Paise
complete. Forty Three
17 3121.00 Providing and laying - Fitter Media 1239.35 Rupees One Sqm
600mm thick directed at theback of Thousand Two
abutments, returns and wing walls Hundred Thirty
as per detailed specifications. Nine And Paise
Thirty Five Only
18 90.00 Providing uncoursed rubble stone 2294.11 Rupees Two Cum
masonry in Cement Mortar 1:5 for Thousand Two
flooring including curring pointing Hundred
in Cement Mortar 1:3 on exposed Ninety Four
faces complete. And Paise
19 1699.00 Providing and laying rubble for 1083.81 Rupees One Cum
Flexible appron (each stone Thousand
weighting not less than 40Kg.) Eighty Three
including and packing and filing in And Paise
the interestices with quarry-spalls. Eighty One
20 512.00 Providing and casting in situ 5565.48 Rupees Five Cum
controlled cement concrete M-200 Thousand Five
for average 75 mm thick wearing Hundred Sixty
coat laid as directed including Five And Paise
tamping, vibrating, finishing, Forty Eight
curing and filling in joints with Only
bitumen complete
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
21 49.00 Providing and placing in position 73858.69 Rupees MT
FE 500D bar reinforcement for Seventy Three
following items including cutting Thousand
bending hooking and tying Eight Hundred
complete as per detailed Fifty Eight And
drawing.For well :- curb, staining, Paise Sixty
capand RCC Raft. Nine Only
22 396.60 Providing and laying in position FE 73858.69 Rupees MT
500D TMT bar reinforcement Seventy Three
including cutting, bending, hooking Thousand
and tying complete as perdetailed Eight Hundred
drawings for the following.(A) Piers Fifty Eight And
(B) Abutments (C)R.C.C. Returns Paise Sixty
23 39.50 Providing and placing in position 73243.01 Rupees MT
FE 500D TMT. Bar reinforcement Seventy Three
including, cutting, bending hooking Thousand Two
and tying complete as per detailed Hundred Forty
drawings.(I) Solid Slab.(II) Deck Three And
Slab. Paise One Only
24 89.00 Providing and fixing in position FE 73243.01 Rupees MT
500D TMT bar reinforement Seventy Three
including cutting, bending and Thousand Two
tying complete as per detailed Hundred Forty
drawings. (A) R.C.C. Kerb. (B) Three And
R.C.C. Footpath.(C) R.C.C. Approch Paise One Only
slab.(D) Wearing Coat.
25 187.00 Providing and fixing premoulded 803.22 Rupees Eight Sqm
compressible filler board in black Hundred Three
colour confirming to MoRT&H And Paise
Specifications (Clause 1015),having Twenty Two
minimum density 95kg/cum. non- Only
staining with less than1% water
absorption & compression recovery
of 93% minimum asper
specification for 20 mm wide
expansion joint including cutting to
required size and shape at all levels
etc.complete as directed.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
26 678.00 Providing and applying the 258.07 Rupees Two Rmt
elastomeric joint sealant two Hundred Fifty
component, high performance Eight And
polysulfide formulation conforming Paise Seven
to BS:4254 and ASTM C 920 Only
having weathering resistance to
ultra-violet rays and shall exhibit
shore A hardness of 25 and have
movement accommodation factor
25% including using of compatible
primer of approved standard etc.
complete.For 20 mm thick joint
27 678.00 Providing and fixing 25 mm 13.06 Rupees Rmt
diameter backup rod having Thirteen And
minimum density 22 kg per cum Paise Six Only
(ASTMD - 3575) & compression
strength o f0.40 kg per sqm (ASTM -
5249) and finishing with
polysulphide sealant etc. complete.
For 20 mm wide expansion joint
28 60.00 Provding P.V.C. 100 mm diameter 159.36 Rupees One Each
water spouts including necessary Hundred Fifty
iron gratings as per drawings. Nine And Paise
Thirty Six Only
29 8328.00 Earthwork for embankment 177.91 Rupees One Cum
including breaking clods,dressing Hundred
with all lead and lift and including Seventy Seven
watering rolling and consolidation And Paise
of subgrade in layers at O.M.C. to Ninety One
required dry density including Only
filling the depression which occur
during the process using power
roller 8T to 10T .(E) From Borrow
area within 3.0KM. lead
30 844.00 Providing and laying Pitching on 1051.41 Rupees One Cum
slopes laid over prepared filter Thousand Fifty
media including boulder apron laid One And Paise
dry in front of toe of embankment Forty One Only
complete as per drawing and
Technical specifications A )
31 1238.00 Providing and laying Filter material 881.36 Rupees Eight Cum
underneath pitching in slopes Hundred
complete as per drawing and Eighty One
Technical specification And Paise
Thirty Six Only
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
32 24.00 Hazard Marker Sign :-Providing and 3666.30 Rupees Three No.
fixing sign boards made out of Thousand Six
1.5mm aluminium sheet / 3mm Hundred Sixty
ACP (Aluminum composite Panel); Six And Paise
size 90x30 cms. rectangular as per Thirty Only
design of IRC-67-2012. Pre treated
with phospheting process & acid
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint ;reflectorised
with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per
ASTM D 4956 and latest M.O.S.T.
Specifications; 1.8mtr long stand
post of 75 x 75 x 6mm / 65NB
Circular MS Pipe as required and
frame fabricated from suitable size
iron angle of 35 x 35 x 3mm;
painted with bestquality epoxy
coatings in black and white bends.
The details of symbol foreach board
shall be as per the instruction of
engineer in charge. The fixing at
site shall be in 1:2:4 CC blockof
size 45 x 45 x 60 Cms. for each
leg.including excavation, curing
etc.complete under the supervision
of engineer in charge. A warranty
for 10 years for the Retro reflective
33 327.00 Providing Yellow and Black Patta ( 67.65 Rupees Sixty Sqm
three coat) including distempeing Seven And
(Three coats) with oil bound Paise Sixty Five
distemper of approved brand and Only
manufacture and of required shade
on wall surfaces to give an even
shade, over and including a
priming coat with distemper primer
of approved brand and
manufacture after thoroughly
brushing the surface free from
mortar dropping and other foreign
matter and also including
preparing the surface even and
sand papered smooth as per
instruction of Engineer Incharge.
34 2188.00 Excavation for foundation upto 1.5 122.93 Rupees One Cum
m depth including sortingout and Hundred
stacking of useful materials and Twenty Two
disposing off theexcavated stuff And Paise
upto 50 Meter lead.(A) Loose or soft Ninety Three
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
35 938.00 Providing and casting in situ 5265.95 Rupees Five Cum
controlled cement concrete M-250 Thousand Two
for R.C.C. return as per drawings Hundred Sixty
including centering shuttering Five And Paise
,scaffolding where necessary, laying Ninety Five
vibrating, curing and finishing Only
complete.(A) Height from 0.0 to
36 101.00 Tubular Steel Railing on Medium 2400.77 Rupees Two Meter
Weight steel channel ( ISMC series) Thousand Four
100 mm x 50 mm (Providing, fixing Hundred And
and erecting 50 mm dia steel pipe Paise Seventy
railing in 3 rows duly painted on Seven Only
medium weight steel channels
(ISMC series) 100 mm x 50 mm,
1.2 metres high above ground, 2 m
centre to centre, complete as per
approved drawings)
37 150.00 "THRIE" : Metal Beam Crash 3973.05 Rupees Three Rmt
Barrier with base plate Providing Thousand Nine
and erecting a "Thrie" W - metal Hundred
beam crash barrier comprising of 3 Seventy Three
mm thick corrugated sheet metal And Paise Five
beam rail, 85 cm above Only
road/ground level, fixed on ISMC
series channel vertical post, 150 x
75 x 5 mm spaced 2 m centre to
centre. The vertical post fixing at
site shall be on Base Plate of Size
240 x 320 x 16 mm thick with
Nos 20 mm dia 4.6 grade anchor
bolt upto minimun depth of
mm & ISMC Vertical Post shall be
fixed with base plate with 12 mm
thick stifnner plate of 100 x
mm & This base shall be casted in
M25 grade Cement concrete of size
35 x 35 x 12 cms. for each post
including necessary fabrication
work etc. complete. All steel parts
and fitments to be galvanised by
hot dip process, all fittings to
confirm to IS:1367 and IS:1364,
metal beam rail to be fixed on the
vertical Post with a spacer of
channel section 150 x 75 x 5 mm,
550 mm long complete as per
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
38 293.00 Type - B, "THRIE" : Metal Beam 4321.55 Rupees Four Rmt
Crash Barrier Providing and Thousand
erecting a "Thrie" W - metal beam Three Hundred
crash barrier comprising of 3 mm Twenty One
thick corrugated sheet metal beam And Paise Fifty
rail, 85 cm above road/ground Five Only
level, fixed on ISMC series channel
vertical post, 150 x 75 x 5 mm
spaced 2 m centre to centre, 2 m
high with 1.15 m below ground
level. The vertical post fixing at site
shall be in M25 grade Cement
concrete of size 35 x 35 x 120 cms.
for each post including excavation
curing etc. complete. All steel parts
and fitments to be galvanised by
hot dip process, all fittings to
confirm to IS:1367 and IS:1364,
metal beam rail to be fixed on the
vertical Post with a spacer of
channel section 150 x 75 x 5 mm,
550 mm long complete as per
Morth Specification clause
including butt welding to all nuts &
bolts etc. complete as per
instruction of Engineer In Charge.
Also radium red colour strip of size
100 x 300 mm shall be fixed on
vertical front side of post for better
39 500.00 Gabian Structure for Retaining 1560.45 Rupees One Cum
Earth (Providing and construction Thousand Five
of a gabain structure for retaining Hundred Sixty
earth with segments of wire crates And Paise
of size 7 m x 3 m x 0.6 m each Forty Five Only
divided into 1.5 m compartments
by cross netting, made from 4 mm
galvanised steel wire @ 32 kg per
10 sqm having minimum tensile
strength of 300 Mpa conforming to
IS:280 and galvanizing coating
conforming to IS:4826, woven into
mesh with double twist, mesh size
not exceeding 100 x 100 mm, filled
with boulders with least dimension
of 200 mm, all loose ends to be
tied with 4 mm galvanised steel
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
40 345.00 Gabian Structure for Erosion 2533.08 Rupees Two Cum
Control, River Training Works and Thousand Five
Protection works (Providing and Hundred Thirty
constructing gabain structures for Three And
erosion control, river training Paise Eight
works and protection works with Only
wire crates of size 2 m x 1 m x
m each divided into 1m
compartments by cross netting,
made from 4 mm galvanised steel
wire @ 32 kg per 10 sqm having
minimum tensile strength of
Mpa conforming to IS:280 and
galvanizing coating conforming to
IS:4826, woven into mesh with
double twist, mesh size not
exceeding 100 mm x 100 mm,
filled with boulders with least
dimension of 200 mm, all loose
ends to be securely tied with 4 mm
galvanised steel wire.)
41 150.00 Grouting with C.M. 1:4 in Pitching 2903.86 Rupees Two Cum
as per drawing or as per Thousand Nine
instruction of Engineer In Charge Hundred Three
Eighty Six Only
42 3850.00 Jacketing : - Providing and casting 3155.64 Rupees Three Sqm
in situ design mix concrete M.25 Thousand One
mix for 23 cm thick jacketing Hundred Fifty
consisting 16 mm dia 200mm c/c Five And Paise
both ways , 16 dia pin @ 400mm Sixty Four Only
c/c vertically & 800mm c/c
horizontally with base supported
with 300 x 450 mm beam
reinforced with main 6 No. 16 mm
dia. bar and stirrups 8 mm dia.
150 mm c/c etc. complete
including drilling holes in the pier,
providing steel bars for connecting
existing pier to jacketing and
filling the holes with rich mortar
including shuttering, scaffolding
wherever necessary,laying,
vibrating curing and finishing
43 5050.00 Eproxy bonding of new concrete to 529.24 Rupees Five Sqm
old concrete Hundred
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
44 2880.00 Guniting concrete surface with 775.68 Rupees Seven Sqm
cement mortar applied with Hundred
compressor after cleaning surface Seventy Five
and spraying with epoxy complete And Paise Sixty
as per Technical specification Eight Only
45 700.00 Providing and inserting nipples 502.98 Rupees Five Each
with approved fixing compound Hundred Two
after drilling holes for grouting as And Paise
per Technical specifications Ninety Eight
including subsequent Only
cutting/removal and sealing of the
hole as necessary of nipples after
completion of grouting with
46 280.00 Sealing of crack / porous concrete 794.87 Rupees Seven Kg
with Epoxy Grout by injection Hundred
through nipples complete as per Ninety Four
clause 2803.1. And Paise
47 800.00 Chipping & removing the 888.03 Rupees Eight Per 25
debonded/ delaminated/ loose/ Hundred
disintegrated concrete at the places Eighty Eight
and in the manner and upto the And Paise
depth and in regular shape as Three Only
advised by the Engineer in charge
without damaging the
reinforcement/ RCC with the help
of chisel and light hammering or
equivalent equipments. Cleaning
the surface with wire brushes
making the surface free from dust,
oil and all impurities etc. as
directed by Engineer Incharge.
(Actual consumed bag shall be
measured for payment.)
Patch repair to damaged concrete
up to average 50 mm depth (by
using ready to use patch repair
mortar of best stanadard approved
brand as per data sheet) and as per
the work methodology and
specifications & cost of all material,
labour, machinery, equipment,
taking necessary safety measures
for all floors as directed and
approved by EIC.
48 150.00 Repair of RCC Railing (Carrying out 118.17 Rupees One Rmt
repair of RCC M30 railing to bring Hundred
it to the original shape.) Eighteen And
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
49 150.00 Repair of steel Railing (Repair of 298.96 Rupees Two Rmt
steel railing to bring it to the Hundred
original shape) Ninety Eight
Ninety Six Only
50 500.00 Providing and laying Rubble stone 3791.54 Rupees Three Cum
in cement mortar 1:3 complete as Thousand
per drawing and Technical Seven Hundred
specifications etc. Complete as per Ninety One
instruction of Engineer In Charge And Paise Fifty
51 350.00 Construction of precast RCC railing 2127.06 Rupees Two Meter
of M30 Grade, aggregate size not Thousand One
exceeding 12 mm, true to line and Hundred
grade, tolurence of vertical RCC Twenty Seven
post not to exceed 1 in 500, centre And Paise Six
to centre spacing between vertical Only
post not to exceed 2000 mm,
leaving adequate space between
vertical post for expansion,
complete as per approved drawings
and technical specifications.
52 300.00 Providing G.I. 100 mm diameter 536.02 Rupees Five Each
water spouts including Hundred Thirty
necessaryiron gratings as per Six And Paise
drawings. Two Only
53 5355.00 Removal of existing cement 163.46 Rupees One Sqm
concrete wearing coat including its Hundred Sixty
disposal complete as per Technical Three And
specification without causing any Paise Forty Six
detrimental effect to any part of the Only
bridge structure and removal of
dismantled material with all lifts
and lead upto 1000m(Thickness
54 1000.00 Applying epoxy mortar over 436.32 Rupees Four Sqm
leached, honey combed and Hundred Thirty
spalled concrete surface and Six And Paise
exposed steel reinforcement Thirty Two Only
complete as per Technical
55 750.00 Replacement of Expansion Joints 2733.06 Rupees Two Meter
complete as per drawings Thousand
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
56 1.00 Clearing and grubbing road land 28455.09 Rupees Twenty Hectare
including uprooting rank vegetation Eight
grass bushes, shrubs ,sapling and Thousand Four
trees girth up to 300 mm removal Hundred Fifty
of stumps of trees cut earlier and Five And Paise
disposal of unserviceable materials Nine Only
(C) By mechanical means in area of
57 2299.00 Box cutting the road to proper 109.24 Rupees One Cum
slope and camber for making a Hundred Nine
base for road work including And Paise
removing the excavated stuff and Twenty Four
(Refilling same) depositing on road Only
in layer wise, side slope as directed
up to all lead etc.
complete.including disposed the
surplus soil as and where directed
with all lead and lift without any
extra cost etc. comp.
58 1407.00 Construction of granular Sub base 1106.96 Rupees One Cum
(Grading -IV) by providing close Thousand One
graded material BTMC using metal Hundred Six
26.5 mm to 9 mm @ 64 %, 9.5 mm And Paise
to 4.75 mm @ 11 %, & 4.75 mm Ninety Six Only
& below @ 25% incl. spreading in
uniform layers with motor grader
on prepared surface mixing by mix
in place method with Front End
Loader at OMC and compacting
with vibratory roller to achieve the
desired density complete as as per
MORTH specification.
59 400.00 Supplying and fixing reinforced 1968.37 Rupees One Rmt
concrete heavy duty non- Thousand Nine
pressurepipes with collars for Hundred Sixty
culverts carrying heavy traffic as Eight And
per IS 458-1991 specifications Paise Thirty
including setting the pipes in C.M. Seven Only
1:2watering and laying (to level or
slopes) of class NP3 of
followinginternal daimeters.(iii)
60 4875.00 Providing & laying priming coat 63.06 Rupees Sixty Sqm
with emulsion SS-1 grade and Three And
spraying emulsion with spray set Paise Six Only
fitted on mechanical bouzer using
emulsion at the rate of 7.5 Kg./10
Sqm. On WMM surface incl.
cleaning the surface etc. complete.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
61 224.00 Providing and laying 37.50mm 2969.40 Rupees Two M.T.
thick B.M with B.T Aggregate as Thousand Nine
per MORT & H Specification & Hundred Sixty
emulsion asphalt RS-1 for tack Nine And Paise
coat @ 2.50 Kg./10 Smt with Forty Only
mechanical sprayer & bitumen
Grade VG-40 for mixing @
Kg/MT i.e 3.4% of total mix
including heating the aggregate &
asphalt in Batch mix plant and
spreading the same by paver
finisher & consolidation with
vibratory road roller including
providing all materials,
equipments, tools and plants, fire
wood, oil, kerosene, labour charges
etc. complete using contractor's
own machinery Batch mix plant &
paver finisher etc. complete.
62 120.00 Regulatory / Mandatory Sign :- 3540.12 Rupees Three No.
Providing and fixing sign boards Thousand Five
made out of 2mm aluminium sheet Hundred Forty
/ 4mm ACP (Aluminum composite And Paise
Panel); size 60 cms. Dia Circle as Twelve Only
per design of IRC-67-2012. Pre
treated with phospheting process &
acid etching; coated with one coat
of epoxy primer and two coats of
best quality epoxy paint ;
reflectorised with High Intensity
Prismatic Grade retro
refiectivesheeting of Type-4 as per
ASTM D-4956 and latest
M.O.S.T.Specifications; 3.6mtr long
stand post of Iron Angle 75 x 75 x
6mm / 65NB Circular MS Pipe as
required and frame fabricated from
suitable size iron angle of 35 x 35 x
3mm; painted with bestquality
epoxy coatings in black and white
bends. The details of symbol for
each board shall be as per the
instruction of engineer in charge.
The fixing at site shall be in 1:2:4
CC blockof size 45 x 45 x 60 Cms.
for each leg including excavation,
curing etc.complete under the
supervision of engineer in charge. A
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
63 60.00 Cautionary Warning Sign :- 3906.18 Rupees Three No.
Providing and fixing sign boards Thousand Nine
made out of 2mm aluminium sheet Hundred Six
/ 4mm ACP (Aluminum composite And Paise
Panel); size 90 x 90 x 90 cms. Eighteen Only
equilateral triangle as per design of
IRC-67-2012. Pre treated with
phospheting process & acid
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint ; reflectorised
with High Intensity Prismatic
Grade retro refiectivesheeting of
Type-4 as per ASTM D- 4956 and
latest M.O.S.T. Specifications;
3.6mtr long stand post of Iron
Angle 75 x 75 x 6mm / 65NB
Circular MS Pipe as required and
frame fabricated from suitable size
iron angle of 35 x 35 x 3mm;
painted with best quality epoxy
coatings in black and white bends.
The details of symbol for each
board shall be as per the
instruction of engineer in charge.
The fixing at site shall be in 1:2:4
CC blockof size 45 x 45 x 60 Cms.
for each leg including excavation,
curing etc.complete under the
64 30.00 Hazard Marker Sign :-Providing and 3518.68 Rupees Three No.
fixing sign boards made out of Thousand Five
1.5mm aluminium sheet / 3mm Hundred
ACP (Aluminum composite Panel); Eighteen And
size 90x30 cms. rectangular as per Paise Sixty
design of IRC-67-2012. Pre treated Eight Only
with phospheting process & acid
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint ; reflectorised
with High Intensity Prismatic
Grade retro refiectivesheeting of
Type-4 as per ASTM D-4956 and
latest M.O.S.T. Specifications;
1.8mtr long stand post of Iron
Angle 75 x 75 x 6mm / 65NB
Circular MS Pipe as required and
frame fabricated from suitable size
iron angle of 35 x 35 x 3mm;
painted with bestquality epoxy
coatings in black and white bends.
The details of symbol for each
board shall be as per the
instruction of engineer in charge.
The fixing at site shall be in 1:2:4
CC blockof size 45 x 45 x 60 Cms.
for each leg including excavation,
curing etc.complete under the
supervision of engineer in charge. A
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
65 30.00 Diversion Ahead Sign :-Providing 9867.07 Rupees Nine No.
and fixing sign boards made outof Thousand
2mm aluminium sheet / 4mm ACP Eight Hundred
(Aluminum compositePanel); size Sixty Seven
180x60 cms. rectangular as per And Paise
design of IRC-67-2012.Pre treated Seven Only
with phospheting process & acid
etching; coated withone coat of
epoxy primer and two coats of best
quality epoxypaint ; reflectorised
with High Intensity Prismatic
Grade retrorefiectivesheeting of
Type-4 as per ASTM D-4956 and
latest M.O.S.T.Specifications ;
mtr long stand post (2 Nos.) of
IronAngle 50 x 50 x 5mm / 50NB
Circular MS Pipe as required
andframe fabricated from suitable
size iron angle of 35 x 35 x
3mm;painted with best quality
epoxy coatings in black and white
bends.The details of symbol for
each board shall be as per the
instruction of engineer in charge.
The fixing at site shall be in1:2:4
CC blockof size 45 x 45 x 60 Cms.
for each leg including excavation,
curing etc.complete under the
supervision of engineer in charge. A
66 120.00 Chevron sign:-Providing and fixing 3711.75 Rupees Three No.
sign boards made out of 1.5mm Thousand
aluminium sheet/3mm ACP Seven Hundred
(Aluminum composite Panel); size Eleven And
60x50cm rectangular as per design Paise Seventy
of IRC-67-2012. Pre treated with Five Only
phospheting process & acid
etching, coated with one coat of
epoxy primer and two coats of best
quality epoxy paint; reflectorised
with High Intensity Prismatic
Grade retro refiectivesheeting of
Type-4 as per ASTM D-4956 and
latest M.O.S.T. Specifications;
mtr long stand post of Iron Angle
75 x 75 x 6mm / 65NB Circular MS
Pipe as required and frame
fabricated from suitable size iron
angle of35x35x3mm; painted with
bestquality epoxy coatings in black
and white bends, the details of
symbol or inscription / numerals
for each board shall be as per the
instruction of engineer in charge.
The fixing at site shall be in 1:2:4
CC blockof size 45 x 45 x 60 Cms.
for each leg including excavation,
curing etc.complete under the
supervision of engineer in charge. A
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
67 30.00 Around the Island / Road Direction 9585.24 Rupees Nine No.
Sign (Big) :-Providing andfixing sign Thousand Five
boards made out of 2mm Hundred
aluminium sheet / 4mm Eighty Five
ACP(Aluminum composite Panel); And Paise
size 180x60 cms. as per design Twenty Four
ofIRC-67-2012. Pre treated with Only
phospheting process & acidetching;
coated with one coat of epoxy
primer and two coats ofbest quality
epoxy paint ; reflectorised with
High IntensityPrismatic Grade retro
refiectivesheeting of Type-4 as per
ASTM D-4956 and latest
M.O.S.T.Specifications; 3.3 mtr
long stand post ofIron Angle 75 x
75 x 6mm / 65NB Circular MS Pipe
as required andframe fabricated
from suitable size iron angle of 35 x
35 x 3mm;painted with bestquality
epoxy coatings in black and white
bends.The details of symbol for
each board shall be as per
theinstruction of engineer in
charge. The fixing at site shall be
in1:2:4 CC blockof size 45 x 45 x
60 Cms. for each leg
includingexcavation, curing
etc.complete under the supervision
68 30.00 Men at work (Heavy) sign :- 9148.15 Rupees Nine No.
Providing and fixing sign boards Thousand One
madeout of 2mm aluminium sheet Hundred Forty
/ 4mm ACP (Aluminum Eight And
compositePanel); size 120cm x Paise Fifteen
90cm as per design of IRC-67-2012. Only
Pretreated with phospheting
process & acid etching; coated with
onecoat of epoxy primer and two
coats of best quality epoxy paint
;reflectorised with High Intensity
Prismatic Grade
retrorefiectivesheeting of Type-4 as
per ASTM D-4956 and
latestM.O.S.T.Specifications;
mtr long stand post (2 Nos.) of
IronAngle 75 x 75 x 6mm / 65NB
Circular MS Pipe as required
andframe fabricated from suitable
size iron angle of
50x50x5mm;painted with
bestquality epoxy coatings in black
and white bends. the details of
symbol or inscription / numerals
for each boardshall be as per the
instruction of engineer in charge.
The fixing atsite shall be in 1:2:4
CC blockof size 45 x 45 x 60 Cms.
for each legincluding excavation,
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
69 857.72 Demolation and disposal of 930.35 Rupees Nine Cum
unserviceable materials with all Hundred Thirty
lead & lift. (ii) Un reinforced cement And Paise
concrete Thirty Five Only
70 1132.00 Excavation in large boulders and 716.55 Rupees Seven CUM.
soft rock by welding including Hundred
shoring, strutting and dewatering Sixteen And
as necessary and disposing of the Paise Fifty Five
excavated stuff as directed. Only
71 120.00 Providing and filling in foundation 3327.08 Rupees Three CUM.
with ordinary cement concrete M- Thousand
100 mix and providing necessary Three Hundred
vertical pin headers including Twenty Seven
formwork, vibrating, ramming and And Paise
curing complete. Eight Only
72 36.00 Providing and fixing mild steel 450.07 Rupees Four Rmt
dowel bars of minimum 32mm dia. Hundred Fifty
for anchoring by drilling holes in And Paise
foundation strata including Seven Only
necessary bending, hooking of
dowel bars and grouting the holes
complete as per detailed drawing
and as directed.
73 2128.00 Providing and casting in-situ 4273.18 Rupees Four CUM.
ordinary cement concrete M-200 Thousand Two
mix and providing necessary pin Hundred
headers including shuttering, Seventy Three
scaffolding laying vibrating, curing And Paise
and finishing complete without V- Eighteen Only
74 50.00 Providing and casting in situ 5345.73 Rupees Five CUM.
controlled cement concrete M-250 Thousand
for RCC work in pier caps / Three Hundred
Abutment caps & Dirt wall Forty Five And
including ordinary cement concre- Paise Seventy
te M-250 bed block or pedestal Three Only
of required size below bearings as
per detailed drawings centering,
shuttering, scaffolding
wherevernecessary laying,
vibrating,curing and finishing
75 278.30 Providing and casting in situ 5555.30 Rupees Five Cum.
controlle cement concrete M-300 Thousand Five
for R.C.C. solid slab including Hundred Fifty
centering, scaffolding, curing and Five And Paise
finishing complete. Thirty Only
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
76 26.09 Providing and casting in situ 4901.20 Rupees Four CUM.
controlle cement concrete M-300 Thousand Nine
for RCC Crash Barriar including Hundred One
curing and finishing complete. And Paise
77 144.99 Providing and filling in foundation 3697.13 Rupees Three Cum
with ordinary cement concrete M- Thousand Six
150 mix and providing necessary Hundred
vertical pin headers including Ninety Seven
formwork, vibrating, ramming and And Paise
curing complete. Thirteen Only
78 43.40 Providing and casting in situ 5497.75 Rupees Five CUM.
controlle cement concrete M - 300 Thousand Four
for average 75mm. thick Wearing Hundred
coat laid as directed including Ninety Seven
tamping, vibrating, finishing, And Paise
curing, and filling in joints with Seventy Five
bitumen complete. Only
79 59.00 Providing and casting in - situ 5355.92 Rupees Five CUM.
controlle cement concrete M-300 Thousand
for approach slab. Three Hundred
80 18.00 Providing and fixing in position 341.29 Rupees Three Nos.
mild steel 32 mm dowel bars in pier Hundred Forty
caps for anchorage in fix end as One And Paise
per detailed drawing including Twenty Nine
cutting , bending & welding Only
81 18.00 Providing and fixing in position 399.70 Rupees Three Nos.
mild steel 32 mm dowel bars in pier Hundred
caps for anchorage in free end as Ninety Nine
per detailed drawing including And Paise
cutting , bending & welding Seventy Only
82 35.00 Providing 12 mm thick pre- 703.53 Rupees Seven Sqm.
moulded asphalt filler joints as per Hundred Three
drawing. And Paise Fifty
83 70.00 Providing and fixing tar papper 101.00 Rupees One Sqm.
bearing ,shall be provided between Hundred One
abutment / pier cap and RCC slab Only
84 15.00 Providing flood gauge marks on 167.03 Rupees One Rmt
sub structure as per design Hundred Sixty
including painting complete. Seven And
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
85 178.00 Wall painting (three coats) with 126.92 Rupees One Sqmt
Plastic emulsion paint of approved Hundred
brands like Apex or equivalante Twenty Six And
and manufacture on undecorated Paise Ninety
wall surfaces to give an even shade Two Only
including thorougnly brushinf the
surface free from mortar droppings
and other foreign matter and sand
papered smooth. ( Black & White
86 300.00 Cat Eye/ Road Stud/RPM: 217.40 Rupees Two No.
Supplying Raised Pavement Hundred
Markers made of polycarbonate and Seventeen And
ABS moulded body and reflective Paise Forty
panels with Micro prismatic lens Only
(No Glass bead lens) capable of
providing total internal reflection of
the light entering the lens face and
shall support a load of 13635 kgs.
tested in accordance to ASTM D
4280 Type H and complying to
Specifications of Category A of
MORTH Circular No
11.06. 1997. The height, width and
length shall not exceed 20 mm,
mm and 130 mm and with
minimum reflective area of
Sqcm on each side and the slope to
the base shall be 35 +/- 5 degree.
The body of the marker should
having finger grip for easy and
accurate placement and application
with epoxy/bituminous Adhesive as
recommended by the manufacturer
of the marker. The color of the
marker should be as per the IRC
35-2015 and as directed by
Engineer-in-charge.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
87 345.00 Road marking with hot applied 367.72 Rupees Three Sqm.
thermoplastic palnts with Hundred Sixty
reflectorising glass beads on Seven And
bitumin surface providing and Paise Seventy
laying a hot applied thermoplastic Two Only
compound 2.5 mm thick including
reflectorising glass beads @
250gms per sqm area, thickness of
2.5mm is excluding of surface
applied glass beds as per IRC:35-
2015. The finished surface to be
level, uniform and free from streaks
and holes. zebra patta /bump patta
lane/center line/ edge line/cut
patta. The white color marking
should provide liminance
coefficinet on cemend road shalll
be min 130 mcd/m2/lux and
Asphalt road shall be min
mcd/m2/lux during the servíce life
during the day time. The marking
should meet the performance
crlterla for night time reflectivity,
wet reflectivity and skld resistance
as mentioned in the section-15 of
IRC 35-2015.warty for retro
retlecinty shall be two
years.Warranty for retro reflectivity
shall be for two year
Rupees Sixteen Crore Fifty Two Lakh(s) Twenty Five Thousand Four Hundred Twelve And
Paise Ninety Eight Only
*Estimated amount *Estimated amount
Put to tender Rs……………………… Put to tender Rs………………………
Deduct : ………% below Add : ………% above
Net Rs……………………… Net Rs………………………
In words ……………………………… In words ………………………………
*(please strike out whichever is not applicable)
Note-1 All works shall be carried out as per Public Works Department Handbook and other specifications of
Division or as directed.
Note-3 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and
hold good for work under all conditions, site, moisture, weather etc.
Note-5 Testing of material shall be statement attached with the GERI Vadodara. Bill for testing charges shall
be paid by the Executive Engineer and 1% (One Percent) of amount put to tender excluding cost of
materials to be issued as schedule A i.e. Rs. _________ shall be recovered from the Contractor's
running bills as per (R&B) Department No.TNC/1085/(4)/C dated 10-5-85 and 20-12-91.
Note-8 pnMU VG[ BF6 lJEFU4 ;lRJF,I4 UF\WLGUZGF 9ZFJ S|DF\So V[DPV[DPVFZPv !!Z___vZ_!#vK4 TFP!q)qZ__$
YL ZFHI ;ZSFZGF AF\WSFD DF8[ J5ZFTF UF{6vBlGHGL ZMI<8L ;FNL DF8L VG[ ;MO8 DMZD 5Z ZMI<8L ,FU] 50X[P
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
Note-9 Labour Cess 1% of estimated cost put to tender for this work shall be recovered from the contract
payment as "Labour Cess" in terms of the Gujarat Govt. Gazette - extra ordinary - dt.12.12.2004,
implementation of buildings and other construction work (resolution of employment and conditions of
services Act'1996)
Note-10 Quantity of items may reduce or increase as per work execution.
Note-11 p5ZMST SFD SM.56 SFZ6;Z D\H]Z q GFD\H]Z SZJFGL ;œF ;CL SZGFZ VlWSFZLGL VAFlWT ZC[X[P
Note-13 In RCC items where there is change of grade mix or change as per actual mix design the difference of
cement consumption shall be deducted from rate of original item at the rate of star rate mentioned in
tender. However for Increase in quantity of cement no additional payment shall be made.
Note-14 For earthquake resistance provision the work shall be carried out as per the instruction of Engineer in-
Note-16 CM8DL1F %,Fg8 VG[ 5[JZYL YTF 0FDZGF SFDM AFAT[ ;ZSFZzLGF DFP VG[ DP lJEFU4 UF\WLGUZGF 5lZ5+
G\PV[;V[RVFZq!5(&qVF.ALq!*)s&fv;4 TFPZ_q!q_* VG[ 5ZL5+ S|DF\SP5ZRq!_qZ_!5q55q;L4 TFP_$q!!q!5
D]HA VG];ZJFG]\ ZC[X[P
Note-17 U]HZFT ;ZSFZzLGF DFPDPlJEFUGF 5lZ5+ S|DF\So VFZHLV[Gq&_Z__&qs#5fv; YL NFB, YI[, XZTMP
1) 5_DLDLYL JW] 0FDZ SFDGL ;\I]ST HF0F. sALPV[;PHLP4 ALPALPV[DP l;JFIf CMI T[JF Z:TFGF SFDDF\ NZ Z5_DLP NL9
V[S S|M; ;[SXG 5Z 0FDZSFDGL 5CM/F. VG];FZ A[ YL RFZ SMZ ;[d5, .HFZNFZ[ 5MTFGF SMZ S8L\U DXLG J0[ ;\A\lWT
GFIA SFI"5F,S .HG[ZzLGL CFHZLDF\ D[/JL VF5JFGF ZC[X[ VG[ VF ;[d5, ;L, SZL DFgI ,[AMZ[8ZL DFZOT YLSG[;4
0[g;L8L TYF AL8]DLG; Sg8[\8GF 5lZ1F6 SZFJL 5lZ6FD[ D[/JJFGF ZC[X[P ;\TMQFSFZS 5lZ6FDM VFjIF ;]WL 0FDZ SFDGL
R]SJJF5F+ ZSDGF 5@ ZSD JLYC[<0 ZFBJFDF\ VFJX[4 H[ ZSD ;\TMQFSFZS 5lZ6FDM D?IF AFN H K]8L SZFX[P 5Z\T]
;\TMQFSFZS 5lZ6FDM GlC\ D[/JJFGF lS:;FVMDF\ SZFZGL VgI XZTM VG];FZ SFI"JFCL Y. XSX[P
2) ~FP!__ ,FB S[ T[YL JW] ZSDGF SZFZ C[9/GF SFD 5Z .HFZNFZ[ O],8F.D SJM,LOF.0 V[gHLGLIZ lGI]ST SZJFGM ZC[X[
H[ V\U[ SFDGF JS"VM0"Z D?I[ lNGv!5 DF\ SFI"5F,S .HG[ZzLGL HF6 C[9/4 GFIA SFI"5F,S .HG[ZzLG[ lGO]S .HG[ZGF
GFD4 SJM,LOLS[XG4 DFS"XL84 ;8L"OLS[84 S,Z OM8MU|FO4 lGI]lSTGF C]SD JU[Z[ lJUT ZH] SZJFGL ZC[X[ TYF SFD 5Z CFHZ
YIF V\U[GM ZL5M8" VF5JFGM ZC[X[4 H[ VG];FZ SZFZ C[9/GF SFD 5Z SJM,LOF.0 .HG[ZGL p5ZMST XZT D]HA lGI]lST
YFI TYF :Y/ 5Z BZ[BZ SFDULZL G ;\EF/[ tIF\ ;]WLGF ;DIUF/F T[DH SFD RF,] ZC[ T[ ;DI NZdIFG lGI]S SZ[, .HG[Z
SFDULZL ;\EF/X[ GlC\ T[ ;DIUF/F DF8[ ~FP!54___qv 5|lTDF; ,[B[ lA,DF\YL S5FT SZJFDF\ VFJX4 H[ GMG ZLO\0[A,
Signature of Contractor Executive Engineer
R&B Division, Bhuj
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Building Specifications Book.pdf
Road Work Booklet Part 1.pdf
Road Work Booklet Part 2.pdf
Bridge Booklet(1).pdf
Bridge Booklet(2).pdf
Asphalt Booklet.pdf
Additional Instructions.pdf
BOQ.pdf
GR.pdf
Morth Specifications.pdf
PRE-QUALIFICATION.pdf
SBD Book.pdf
Sp.Structure specification.pdf
Spe. Index.pdf
Special Condition-Bridge.pdf
Specification CAT EYE PATTA.pdf
Download all tender documents and submit your bid