Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹29.9 Laccepted-aoc | accepted-aoc |
Tender Value
₹36.9 L
EMD Value
₹37,000
Closing Date
27 Jan 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, PR Circle, Krishna
Superintending Engineer, PR Circle, ZP Compound, Machilipatnam, Krishna District
Construction of Compound wall to Eidgah site at Pedapulipaka road in Tadigadapa of Tadigadapa Municipality Est.Rs.44.00 lakhs
889794
NIT No.99/T.O/2025, dt:29.12.2026 of the Superintending Engineer, PR Circle, Krishna District 1st call
OPEN - NCB
Buildings
KRISHNA, ANDHRA PRADESH
7 documents required · 7 mandatory
₹1,307
₹37,000
11 Feb 2026
13 Jan 2026
13 Jan 2026
Augoring and boring of holes in site and under reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black cotton soils and ordinary soils with augoring and boring equipment as per IS 2911 - 1980 as per approved designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and for finished item of work for piles of different diameter , inclding VRCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges , seigniorage charges for finished item of work, including centering, shuttering. Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308) Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST.
RCC M- 25 designl mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges ,Seigniorage charges for finished item of work, including centering, shuttering.Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST. for Plinth Beams
RCC M- 25 designll mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges ,Seigniorage charges for finished item of work, including centering, shuttering.Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST. For Colums
Masonry work in CM (1:8) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls and Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
Flush Pointing with CM (1:3) to Brick Masonry inclduing cost and conveyance of all materials and all labour charges etc., complete and Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
Filling with sand dust inclduing cost and conveyance of all labour charges and all material charges etc., complete and Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
White Washing two coats with Whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials and Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
Providing High Yield Strength Deformed (HYSD)/ Thermo Machanically Treated (TMT) / Mild Steel (MS) steel bars (Fe 415 / Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightering, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and typing and lap -splicing with binding wire of 18 SWG, forming grillls for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps , couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidnetal, operaitonal, labour charges such as cutting , bending, placing in position, typing inlcuding sales and other taxes on all materials etc., complete for finished item of work in all floors (APSS No.126) and Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
Cost and supply of MS Grills including cost and conveyance to work spot and fabrication charges of steel like cutting rods, welding grills placing in position etc., complete and Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST.
Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coat Red oxide with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors and Including Overhead charges & Contractor's Profit @ 13.615% but excluding seigniorage charges & GST
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Bld. Doc.doc
TENDER_DOCUMENT • 0.64 MB
BOQ.xlsx
TENDER_DOCUMENT • 0.01 MB
tadigadapa compound wall Schedule 12.01.2026.xls
TENDER_DOCUMENT • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .