Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 41 1294 A6 SECOND FLOOR BEEVI COMPLEX C P UMMER ROAD KOCHI ERNAKULAM KERALA 682035 | ERNAKULAM | KERALA | 682035 | Admitted-Finance |
| 2 | Admitted-Finance 2ND FLOOR KALOOR BUSSTAND COMPLEX BUS STAND COMPLEX KALOOR BUSSTAND COMPLEX ERNAKULAM KERALA 682017 | ERNAKULAM | KERALA | 682017 | Admitted-Finance |
| 3 | Rejected-Technical B71 AKSHAY MITTAL INDUSTRIAL CO OPERATIVE SOCIETY BUILDING NO 5 ANDHERI KURLA ROAD MAROL MAROL ANDHERI EAST MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | Rejected-Technical Submitted experience documents does not match with CSL tender pre-qualification criteria |
| 4 | Rejected-Technical | Rejected-Technical Not submitted CSL tender pre-qualification criteria |
Tender Value
Refer Docs
Closing Date
16 Aug 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DEPUTY GENERAL MANGER, SRM
Ship Repair Materials Department Cochin Shipyard Limited Kochi-682015 Kerala, India
INSTRUMENTATION JOBS IN VARIOUS SYSTEMS FOR NAVY VESSELS
2024_CSL_203978_1
CSL/SRM3/ADV108-109_1
Open Tender
Marine Services
Turn-key
150 days
Cochin
Please refer the tender documents
2 documents required · 2 mandatory
₹0
Exempted
3 Sept 2024
7 Aug 2024
17 Aug 2024
7 Aug 2024
16 Aug 2024
7 Aug 2024
7 Aug 2024 - 14 Aug 2024
Amount
Scope 1 - Instrumentation Jobs of Various Systems - (RM.0788)
SHAFTING (1241RE) - AER PORT& STBD SHAFT RPM INDICATOR IS DEFECTIVE AND NOT SHOWING SPRM READINGS ON CCC. REPLACE OF SHAFT RPM INDICATOR ALONG WITH SENSOR - SERVICE COST
SHAFTING (1241RE) - AER PORT& STBD SHAFT RPM INDICATOR IS DEFECTIVE AND NOT SHOWING SPRM READINGS ON CCC. REPLACE OF SHAFT RPM INDICATOR ALONG WITH SENSOR - MATERIAL COST
A/C CONDENSATE SYSTEM REPLACE AND CALIBRATE PRESSURE GAUGES (SUCTION AND DISCHARGE QTY 07) VIEW GAUGE MALFUNCTIONING. ALONG WITH TUBING , FITTINGS AND VALVES -- SERVICE COST
A/C CONDENSATE SYSTEM REPLACE AND CALIBRATE PRESSURE GAUGES (SUCTION AND DISCHARGE QTY 07) VIEW GAUGE MALFUNCTIONING. ALONG WITH TUBING , FITTINGS AND VALVES - MATERIAL COST
A/C CONDENSATE SYSTEM AUTO CUT IN / CUT OUT DFECTIVE. TO BE REFURBISHED BY REPLACING LEVEL SENSORS, CABLING ETC. OFFER TRIALS OF SYSTEM-- SERVICE COST
A/C CONDENSATE SYSTEM AUTO CUT IN / CUT OUT DFECTIVE. TO BE REFURBISHED BY REPLACING LEVEL SENSORS, CABLING ETC. OFFER TRIALS OF SYSTEM - MATERIAL COST
DIESEL GENERATOR 1& 2 (NTA 855 MG) - FER & AER REMOVE AND CHECK THE OVER SPEED TRIP (PROTECTION DEVICE/ SENSOR) FOR CORRECT SETTING/FUNCTIONING, CALIBRATE IF NECESSARY-- SERVICE COST
DIESEL GENERATOR 1& 2 (NTA 855 MG) - FER & AER REMOVE AND CHECK THE OVER SPEED TRIP (PROTECTION DEVICE/ SENSOR) FOR CORRECT SETTING/FUNCTIONING, CALIBRATE IF NECESSARY - MATERIAL COST.
DIESEL GENERATOR 1& 2 (NTA 855 MG) MANUFACTURING OF FOLLOWING COVER AS PER DIMENSIONS (A) DA CONTROL PANEL, MAT-GI SHEET. (B) DA CONTROL PANEL MAT-GI SHEET. (C) DA JUNCTION BOX, MAT- GI SHEET-- SERVICE COST
DIESEL GENERATOR 1& 2 (NTA 855 MG) MANUFACTURING OF FOLLOWING COVER AS PER DIMENSIONS (A) DA CONTROL PANEL, MAT-GI SHEET. (B) DA CONTROL PANEL MAT-GI SHEET. (C) DA JUNCTION BOX, MAT- GI SHEET - MATERIAL COST.
DIESEL GENERATOR 1 & 2 (NTA 855 MG) PROVIDE & FITMENT OF MANOMETERS ON DA NO. 1,2 AND 3 TURBOCHARGER-- SERVICE COST
DIESEL GENERATOR 1 & 2 (NTA 855 MG) PROVIDE & FITMENT OF MANOMETERS ON DA NO. 1,2 AND 3 TURBOCHARGER - MATERIAL COST
DIESEL GENERATOR 3 - (NTA 743 MG) - AER 3 ELECTRICAL CONTROL SYSTEM: UNDERTAKE CHECKS OF ALL CONTROL SYSTEM AND SAFETY DEVICES. . (B) CHECK PNEUMATIC/ ELECTRICAL STARTER WHERE FITTED. (C) CLEAN MAGNETIC PICKUP UNIT-- SERVICE COST
DIESEL GENERATOR 3 - (NTA 743 MG) - AER 3 ELECTRICAL CONTROL SYSTEM: UNDERTAKE CHECKS OF ALL CONTROL SYSTEM AND SAFETY DEVICES. . (B) CHECK PNEUMATIC/ ELECTRICAL STARTER WHERE FITTED. (C) CLEAN MAGNETIC PICKUP UNIT - MATERIAL COST.
D/A GOVERNING SYSTEM - ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA CONTROL WIRING FROM CONTROL PANEL/ BUPS PANEL TO LOCAL CONTROL PANEL IN VIEW OF WIRE PERISHED. OLD WIRES TO BE REMOVED-- SERVICE COST
D/A GOVERNING SYSTEM - ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA CONTROL WIRING FROM CONTROL PANEL/ BUPS PANEL TO LOCAL CONTROL PANEL IN VIEW OF WIRE PERISHED. OLD WIRES TO BE REMOVED - MATERIAL COST.
D/A GOVERNING SYSTEM - ENGINE ROOM UNDERTAKE MANUFACURING OF CABLE TRAY AND CLAMPS FOR PROPER SECURING ARRANGEMENT OF CABLES OF ALL THREE DAS-- SERVICE COST
D/A GOVERNING SYSTEM - ENGINE ROOM UNDERTAKE MANUFACURING OF CABLE TRAY AND CLAMPS FOR PROPER SECURING ARRANGEMENT OF CABLES OF ALL THREE DAS- MATERIAL COST.
D/A GOVERNING SYSTEM UNDERTAKE - SERVICE COSTABILITY CHECK OF DA LOCAL JUNCTION BOXES . NECESSARY RENEWAL AND REWIRING TO BE DONE-- SERVICE COST
D/A GOVERNING SYSTEM UNDERTAKE - SERVICE COSTABILITY CHECK OF DA LOCAL JUNCTION BOXES . NECESSARY RENEWAL AND REWIRING TO BE DONE - MATERIAL COST
D/A GOVERNING SYSTEM - ENGINE ROOM REWIRING OF DA CONTROL WIRES BETWEEN LOCAL CONTROL AND REMOTE CONTROL IN VIEW OF EXCESSIVE PERISHED. LENGTH- 40 MTRS-- SERVICE COST
D/A GOVERNING SYSTEM - ENGINE ROOM REWIRING OF DA CONTROL WIRES BETWEEN LOCAL CONTROL AND REMOTE CONTROL IN VIEW OF EXCESSIVE PERISHED. LENGTH- 40 MTRS - MATERIAL COST.
D/A GOVERNING SYSTEM - ENGINE ROOM REWIRING OF DA INSTRUMENTATION SENSOR WIRES IN VIEW OF EXCESSIVE PERISHED. LENGTH- 30 MTRS-- SERVICE COST .
D/A GOVERNING SYSTEM - ENGINE ROOM REWIRING OF DA INSTRUMENTATION SENSOR WIRES IN VIEW OF EXCESSIVE PERISHED. LENGTH- 30 MTRS- MATERIAL COST.
D/A GOVERNING SYSTEM - ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA METALLIC CONDUIT FOR WIRING FROM CONTROL PANEL TO LOCAL CONTROL PANEL AND LOCAL CONTROL PANEL TO DA IN VIEW OF CORRODED-- SERVICE COST .
D/A GOVERNING SYSTEM - ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA METALLIC CONDUIT FOR WIRING FROM CONTROL PANEL TO LOCAL CONTROL PANEL AND LOCAL CONTROL PANEL TO DA IN VIEW OF CORRODED- MATERIAL COST.
D/A GOVERNING SYSTEM - ENGINE ROOM UNDERTAKE COMPLETE REFURBISHENT OF ALL THREE DA LOCAL CONTROL PANEL WITH RENEWAL OF ALL COMPONENTS AND FITMENT/ PROVINF TO NAVY TRIAL AGENCIES , INCLUDING GOVERNOR TUNING . (MAKE - M/S SYMPTRONICS)-- SERVICE COST
D/A GOVERNING SYSTEM - ENGINE ROOM UNDERTAKE COMPLETE REFURBISHENT OF ALL THREE DA LOCAL CONTROL PANEL WITH RENEWAL OF ALL COMPONENTS AND FITMENT/ PROVINF TO NAVY TRIAL AGENCIES , INCLUDING GOVERNOR TUNING . (MAKE - M/S SYMPTRONICS) - MATERIAL COST
D/A GOVERNING SYSTEM - ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA SENSOR/ INSTRUMENTATION WIRING IN VIEW OF WIRE PERISHED-- SERVICE COST .
D/A GOVERNING SYSTEM - ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA SENSOR/ INSTRUMENTATION WIRING IN VIEW OF WIRE PERISHED- MATERIAL COST.
D/A GOVERNING SYSTEM - ENGINE ROOM UNDERTAKE COMPLETE REFURBISHMENT OF REMOTE CONTROL PANEL OF ALL THREE DAs IN MCR IN VIEW OF FAULTY ALARM AND INDICATION LAMP NOT GLOWING PROPERLY-- SERVICE COST .
D/A GOVERNING SYSTEM - ENGINE ROOM UNDERTAKE COMPLETE REFURBISHMENT OF REMOTE CONTROL PANEL OF ALL THREE DAs IN MCR IN VIEW OF FAULTY ALARM AND INDICATION LAMP NOT GLOWING PROPERLY- MATERIAL COST.
FIREMAIN PUMP (MAKE - M/S JOHNSON, CAPACITY - 60 TPH) FER / AER UNDERTAKE OVERHAUL OF FIREMAIN PUMPS AS FOLLOWS(QTY - 02 NO, MAKE - M/S JOHNSON, CAPACITY - 60 TPH):- REPLACE AND CALIBRATE ALL INSTRUMENTATION (PRESSURE GAUGE ETC)-- SERVICE COST .
FIREMAIN PUMP (MAKE - M/S JOHNSON, CAPACITY - 60 TPH) FER / AER UNDERTAKE OVERHAUL OF FIREMAIN PUMPS AS FOLLOWS(QTY - 02 NO, MAKE - M/S JOHNSON, CAPACITY - 60 TPH):- REPLACE AND CALIBRATE ALL INSTRUMENTATION (PRESSURE GAUGE ETC)- MATERIAL COST.
AK176 COOLING SYSTEM AND AK630 SPRINKLING SYSTEM - AFT STBD & PORT CARRY OUT ROUTINES OF AK 176/ AK 630 SPRINKLING SYSTEMS (QTY 02) AS FOLLOWS: - CALIBRATE/ RENEW PRESSURE SWITCHES. REPLACE IF DEFECTIVE-- SERVICE COST
AK176 COOLING SYSTEM AND AK630 SPRINKLING SYSTEM - AFT STBD & PORT CARRY OUT ROUTINES OF AK 176/ AK 630 SPRINKLING SYSTEMS (QTY 02) AS FOLLOWS: - CALIBRATE/ RENEW PRESSURE SWITCHES. REPLACE IF DEFECTIVE - MATERIAL COST
FIREMAIN SYSTEM SCATTERED CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND REFIT PRESSURE GAUGE VALVES-- SERVICE COST .
FIREMAIN SYSTEM SCATTERED CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND REFIT PRESSURE GAUGE VALVES- MATERIAL COST.
FIREMAIN SYSTEM SCATTERED CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE ALL PRESSURE GAUGES. {(A) SUCTION GAUGE - 1 TO 2 KGF/CM2 (QTY- 05) (B) DISCHARGE GAUGE - 0 TO 20 KGF/CM2 (QTY- 15), (C) 0 TO 10 KGF/CM2, QTY- 03}-- SERVICE COST
FIREMAIN SYSTEM SCATTERED CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE ALL PRESSURE GAUGES. {(A) SUCTION GAUGE - 1 TO 2 KGF/CM2 (QTY- 05) (B) DISCHARGE GAUGE - 0 TO 20 KGF/CM2 (QTY- 15), (C) 0 TO 10 KGF/CM2, QTY- 03} - MATERIAL COST
FOAM FIRE SMOOTHERING SYSTEM (CO 500) MAIN ALLEWAY CARRY OUT OVERHAUL/ ROUTINES OF FOAM SMOOTHERINGTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES-- SERVICE COST .
FOAM FIRE SMOOTHERING SYSTEM (CO 500) MAIN ALLEWAY CARRY OUT OVERHAUL/ ROUTINES OF FOAM SMOOTHERINGTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES- MATERIAL COST.
GT FIRE FIGHTING SYS. (DRY CHEMICAL) AER/FER CARRY OUT OVERHAUL/ ROUTINES OF GT FIRE SMOOTHERING SYSTEMS IN BOTH ENGINE ROOMS AS FOLLOWS: - CALIBRATE PRESSURE GAUGES-- SERVICE COST .
GT FIRE FIGHTING SYS. (DRY CHEMICAL) AER/FER CARRY OUT OVERHAUL/ ROUTINES OF GT FIRE SMOOTHERING SYSTEMS IN BOTH ENGINE ROOMS AS FOLLOWS: - CALIBRATE PRESSURE GAUGES- MATERIAL COST.
GT/RG LUB OIL SYSTEM - FER UNDERTAKE OVERHAUL OF GT & RG LUB OIL SYSTEM AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES-- SERVICE COST .
GT/RG LUB OIL SYSTEM - FER UNDERTAKE OVERHAUL OF GT & RG LUB OIL SYSTEM AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES- MATERIAL COST.
HOLD PUMP - FER UNDERTAKE REPLACEMENT OF HOLD PUMP WITH MOTOR AND DO THE FOLLOWING: REPLACE AND CALIBRATE ALL INSTRUMENTATION.SUCTION AND DISCHARGE PRESSURE GAUGES-- SERVICE COST .
HOLD PUMP - FER UNDERTAKE REPLACEMENT OF HOLD PUMP WITH MOTOR AND DO THE FOLLOWING: REPLACE AND CALIBRATE ALL INSTRUMENTATION.SUCTION AND DISCHARGE PRESSURE GAUGES- MATERIAL COST.
FRESH WATER PUMP FER (PORT / STBD) UNDERTAKE OVERHAUL OF FRESH WATER PUMP AS FOLLOWS: - REPLACE AND CALIBRATE ALL TEMPERATURE AND PRESSURE GAUGES VIEW DEFECTIVE-- SERVICE COST .
FRESH WATER PUMP FER (PORT / STBD) UNDERTAKE OVERHAUL OF FRESH WATER PUMP AS FOLLOWS: - REPLACE AND CALIBRATE ALL TEMPERATURE AND PRESSURE GAUGES VIEW DEFECTIVE- MATERIAL COST
DOMESTIC FW SYSTEM THROUGHOUT SHIP CARRY OUT ROUTINES OF FW SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES-- SERVICE COST .
DOMESTIC FW SYSTEM THROUGHOUT SHIP CARRY OUT ROUTINES OF FW SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES- MATERIAL COST.
HP AIR COMPRESSOR (ELGI EKPA 2/150) AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 1 CONTROL PANEL. RELATED CABLING AND TERMINATIONS TO BE CARRIED OUT . SYSTEM TO BE PROVED (EQUIPMENT SUPPLLIED BY NAVY)-- SERVICE COST
HP AIR COMPRESSOR (ELGI EKPA 2/150) AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 1 CONTROL PANEL. RELATED CABLING AND TERMINATIONS TO BE CARRIED OUT . SYSTEM TO BE PROVED (EQUIPMENT SUPPLLIED BY NAVY)- MATERIAL COST
HP AIR COMPRESSOR (ELGI EKPA 2/150) AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 2 CONTROL PANEL.RELATED CABLING AND TERMINATIONS TO BE CARRIED OUT . SYSTEM TO BE PROVED (EQUIPMENT SUPPLIED BY NAVY)-- SERVICE COST
HP AIR COMPRESSOR (ELGI EKPA 2/150) AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 2 CONTROL PANEL.RELATED CABLING AND TERMINATIONS TO BE CARRIED OUT . SYSTEM TO BE PROVED (EQUIPMENT SUPPLIED BY NAVY)- MATERIAL COST
HP AIR COMPRESSOR (ELGI EKPA 2/150) - AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACE AUTO CUT IN AND CUT OFF SYSTEM AND STW FOR CORRECT OPERATION-- SERVICE COST
HP AIR COMPRESSOR (ELGI EKPA 2/150) - AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACE AUTO CUT IN AND CUT OFF SYSTEM AND STW FOR CORRECT OPERATION - MATERIAL COST
HP AIR COMPRESSOR (ELGI EKPA 2/150) AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- UNDERTAKE REFURBISHMENT OF REMOTE OPERATION PANEL IN MCR (QTY 1). REPLACE CABLING, INERNAL WIRING, SWITCHES, RELAYS, INDICATORS, KNOBs ETC VIEW WORN OUT DUE TO PROLONED USAGE-- SERVICE COST .
HP AIR COMPRESSOR (ELGI EKPA 2/150) AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- UNDERTAKE REFURBISHMENT OF REMOTE OPERATION PANEL IN MCR (QTY 1). REPLACE CABLING, INERNAL WIRING, SWITCHES, RELAYS, INDICATORS, KNOBs ETC VIEW WORN OUT DUE TO PROLONED USAGE- MATERIAL COST.
HP AIR SYSTEM SCATTERED UNDERTAKE FOLLOWING ON HP AIR SYSTEM COMPRESSORS :- FOLLOWING GAUGES DEFECTIVE. REPLACE THE AIR SYSTEM PRESSURE GAUGES. (A) RANGE: 0-250 KGF/CM2, QTY- 10. (B) RANGE: 0-100 KGF/CM2, QTY- 05. (C) RANGE:0-40 KGF/CM2, QTY-05-- SERVICE COST .
HP AIR SYSTEM SCATTERED UNDERTAKE FOLLOWING ON HP AIR SYSTEM COMPRESSORS :- FOLLOWING GAUGES DEFECTIVE. REPLACE THE AIR SYSTEM PRESSURE GAUGES. (A) RANGE: 0-250 KGF/CM2, QTY- 10. (B) RANGE: 0-100 KGF/CM2, QTY- 05. (C) RANGE:0-40 KGF/CM2, QTY-05- MATERIAL COST.
JS FIRE FIGHTING SYSTEM NEAR CO CABIN/ QUERTER DECK UNDERTAKE OVERHAUL OF THE JS(HALON) FIRE FIGHTING SYSTEMS (FWD AND AFT) AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES-- SERVICE COST .
JS FIRE FIGHTING SYSTEM NEAR CO CABIN/ QUERTER DECK UNDERTAKE OVERHAUL OF THE JS(HALON) FIRE FIGHTING SYSTEMS (FWD AND AFT) AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES- MATERIAL COST.
MGT STARTING & TURNING SYSTEM (CRUISE/ BOOST-1241RE) - AER/ FER CALIBRATE ALL PRESSURE GAUGES. REPLACE DEFECTIVE-- SERVICE COST
MGT STARTING & TURNING SYSTEM (CRUISE/ BOOST-1241RE) - AER/ FER CALIBRATE ALL PRESSURE GAUGES. REPLACE DEFECTIVE- MATERIAL COST
MGT STARTING & TURNING SYSTEM (CRUISE/ BOOST-1241RE) - AER/ FER CARRY OUT FUNCTIONAL CHECKS OF CONTROL INSTRUMENTATION. REPLACE IF REQUIRED-- SERVICE COST
MGT STARTING & TURNING SYSTEM (CRUISE/ BOOST-1241RE) - AER/ FER CARRY OUT FUNCTIONAL CHECKS OF CONTROL INSTRUMENTATION. REPLACE IF REQUIRED- MATERIAL COST
REFRIGERATION PLANT (700 KCAL/HR) - ASP PORT STORE/ ASP STBD CANTEEN/ SHIPS GALLEY CARRY OUT MAJOR OVERHAUL OF REFRIGERATION PLANTS WITH ASSOCIATED CONTROLS AND CUTOUTS -- SERVICE COST
REFRIGERATION PLANT (700 KCAL/HR) - ASP PORT STORE/ ASP STBD CANTEEN/ SHIPS GALLEY CARRY OUT MAJOR OVERHAUL OF REFRIGERATION PLANTS WITH ASSOCIATED CONTROLS AND CUTOUTS - MATERIAL COST
REFRIGERATION PLANT (700 KCAL/HR) - ASP PORT STORE/ ASP STBD CANTEEN/ SHIPS GALLEY RENEW & CALIBRATE ALL INSTRUMENTATION -- SERVICE COST
REFRIGERATION PLANT (700 KCAL/HR) - ASP PORT STORE/ ASP STBD CANTEEN/ SHIPS GALLEY RENEW & CALIBRATE ALL INSTRUMENTATION- MATERIAL COST
SANITARY PUMP - AER PORT UNDERTAKE FOLLOWING ON SANITARY PUMP: - REPLACE AND CALIBRATE ALL INSTRUMENTATION-- SERVICE COST .
SANITARY PUMP - AER PORT UNDERTAKE FOLLOWING ON SANITARY PUMP: - REPLACE AND CALIBRATE ALL INSTRUMENTATION- MATERIAL COST.
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED UNDERTAKE OVERHAUL OF TANK LEVEL SYSTEM. REPLACE SENSORS AND CABLING. PROVE SYSTEM IN LOCAL AND REMOTE OPERATION . SENSORS - 07NOS -- SERVICE COST
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED UNDERTAKE OVERHAUL OF TANK LEVEL SYSTEM. REPLACE SENSORS AND CABLING. PROVE SYSTEM IN LOCAL AND REMOTE OPERATION . SENSORS - 07NOS- MATERIAL COST
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED ELECTROMAGNETIC VALVES OF SHIP FUEL SYSTEM NOT HOLDING. UNDERTAKE OF ELECTROMAGNETIC VALVE MOTOR, AND OF VALVE SEATING VIEW SEEAPAGE IN CLOSED POSITION-- SERVICE COST .
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED ELECTROMAGNETIC VALVES OF SHIP FUEL SYSTEM NOT HOLDING. UNDERTAKE OF ELECTROMAGNETIC VALVE MOTOR, AND OF VALVE SEATING VIEW SEEAPAGE IN CLOSED POSITION- MATERIAL COST.
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED EM VALVES AND EMERGENCY DRAIN VALVES NOT OPERATING FROM MCR. UNDERTAKE REPAIRS AND OVERHAULING CONTROL CIRCUIT FROM CCC PANEL TO EACH VALVE AND PROVE REMOTE OPERATIONS (TOTAL CKTS - 12 NO)-- SERVICE COST
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED EM VALVES AND EMERGENCY DRAIN VALVES NOT OPERATING FROM MCR. UNDERTAKE REPAIRS AND OVERHAULING CONTROL CIRCUIT FROM CCC PANEL TO EACH VALVE AND PROVE REMOTE OPERATIONS (TOTAL CKTS - 12 NO)- MATERIAL COST
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED REPLACE LOW/HIGH LEVEL SENSORS OF ALL SEVEN FUEL TANKS AND PROVE FUNCTIONALITY FROM CCC PANEL. (QTY - 18 NO)-- SERVICE COST
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED REPLACE LOW/HIGH LEVEL SENSORS OF ALL SEVEN FUEL TANKS AND PROVE FUNCTIONALITY FROM CCC PANEL. (QTY - 18 NO) - MATERIAL COST.
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED FOLLOWING GAUGES READING ERRATIC AND MALFUNCTIONING. UNDEERTAKE CALIBRATION/ SERVICABLITY CHECKS OF FOLLOWING PRESSURE GAUGES.(A) -1 TO 1.5 KGF/CM2,(B) 0 TO 16 KGF/CM2,QTY- 03 (C) 02TO 10 KGF/CM2,QTY- 02(D) 0 TO 9 KGF/CM2,QTY- 01(E) 0 TO 150 KGF/CM2,QTY-01(F) 0 TO 4 KGF/CM2, " REPLACE IF REQUIRED-- SERVICE COST
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED FOLLOWING GAUGES READING ERRATIC AND MALFUNCTIONING. UNDEERTAKE CALIBRATION/ SERVICABLITY CHECKS OF FOLLOWING PRESSURE GAUGES.(A) -1 TO 1.5 KGF/CM2,(B) 0 TO 16 KGF/CM2,QTY- 03 (C) 02TO 10 KGF/CM2,QTY- 02(D) 0 TO 9 KGF/CM2,QTY- 01(E) 0 TO 150 KGF/CM2,QTY-01(F) 0 TO 4 KGF/CM2, " REPLACE IF REQUIRED - MATERIAL COST.
PENUMATIC SIREN (TYPHOON) - SUPER STRUCTURE CALIBRATE CONTROL INSTRUMENTS-- SERVICE COST .
PENUMATIC SIREN (TYPHOON) - SUPER STRUCTURE CALIBRATE CONTROL INSTRUMENTS- MATERIAL COST.
PENUMATIC SIREN (TYPHOON) - SUPER STRUCTURE RENEW TYPHOON ASSEMBLY-- SERVICE COST .
PENUMATIC SIREN (TYPHOON) - SUPER STRUCTURE RENEW TYPHOON ASSEMBLY- MATERIAL COST.
PENUMATIC SIREN (TYPHOON) - SUPER STRUCTURE REPLACE SOLENOID VALVE/MANUAL VALVE-- SERVICE COST .
PENUMATIC SIREN (TYPHOON) - SUPER STRUCTURE REPLACE SOLENOID VALVE/MANUAL VALVE- MATERIAL COST.
PENUMATIC SIREN (TYPHOON) - SUPER STRUCTURE OFFER SYSTEM TRIALS AS PER IN STANDARDS INCLUDING SEA TRIALS AND PROVE SYSTEM-- SERVICE COST
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- REPLACE AND CALIBRATE ALL PRESSURE GAUGES-- SERVICE COST .
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- REPLACE AND CALIBRATE ALL PRESSURE GAUGES- MATERIAL COST.
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION AND REPLACEMENT OF STEERING GEAR SYSTEM PRESSURE GAUGES. RANGE: 0-100 KGF/CM2-- SERVICE COST
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION AND REPLACEMENT OF STEERING GEAR SYSTEM PRESSURE GAUGES. RANGE: 0-100 KGF/CM2- MATERIAL COST
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION OF HYDRAULIC SYSTEM PRESSURE GAUGES. RANGE: 0-250 KGF/CM2-- SERVICE COST
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION OF HYDRAULIC SYSTEM PRESSURE GAUGES. RANGE: 0-250 KGF/CM2- MATERIAL COST
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- ORION LEAKAGE OBSERVED INI THE THE 4/3 VALVE LEADING TO INADVERT OPERATIONAL. UNDERTAKE REPAIR AND OVERHAULING OF 4/3 WAY VV OF STEERING GEAR SYSTEM SYSTEM-- SERVICE COST .
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- ORION LEAKAGE OBSERVED INI THE THE 4/3 VALVE LEADING TO INADVERT OPERATIONAL. UNDERTAKE REPAIR AND OVERHAULING OF 4/3 WAY VV OF STEERING GEAR SYSTEM SYSTEM- MATERIAL COST.
MISC SCATTERED NAGMAN LP CALIBERATOR DEFUCNTIONAL. UNDERTAKE - SERVICE COSTBILITY CHECKS AND CALIBERATION AND REPAIR OF NAGMAN LP CALIBERATOR -- SERVICE COST
MISC SCATTERED NAGMAN LP CALIBERATOR DEFUCNTIONAL. UNDERTAKE - SERVICE COSTBILITY CHECKS AND CALIBERATION AND REPAIR OF NAGMAN LP CALIBERATOR - MATERIAL COST
MISC SCATTERED NAGMAN HP CALIBERATOR NOT OPERATIONAL. UNDERTAKE - SERVICE COSTBILITY CHECKS AND CALIBERATION AND REPAIR OF NAGMAN HP CALIBERATOR -- SERVICE COST
MISC SCATTERED NAGMAN HP CALIBERATOR NOT OPERATIONAL. UNDERTAKE - SERVICE COSTBILITY CHECKS AND CALIBERATION AND REPAIR OF NAGMAN HP CALIBERATOR - MATERIAL COST
MISC SCATTERED KITTIWAKE LUB OIL TEST KIT READING ERRATIC VALUES/ DEFUNC. UNDERTAKE REPAIRS AND PROVE - SERVICE COSTBILITY CHECKS AND CALIBERATION OF KITIWAKE TEST KIT -- SERVICE COST
MISC SCATTERED KITTIWAKE LUB OIL TEST KIT READING ERRATIC VALUES/ DEFUNC. UNDERTAKE REPAIRS AND PROVE - SERVICE COSTBILITY CHECKS AND CALIBERATION OF KITIWAKE TEST KIT - MATERIAL COST
ADDRESSABLE FLOOD ALARM SYSTEM (AFAS) (Make M/s L&T, India) (EQUIPMENT WILL BE SUPPLIED BY IN) VARIOUS "UNDERTAKE ROUTINES OF AFAS AS FOLLOWS:-" (A) REMOVE(AS PART OF DEGUTTING), REPLACE DEFECTIVE SYSTEM COMPONENTS INCLUDING SENSORS, FOUNDATIONS, CABLES, DBs, PANELS ETC. (B) REGUTTING/ INSTALLATION, CABLING & CONNECTORISATION OF AFAS SENSORS, FOUNDATIONS, CONTROL UNITS AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT AUGMENTATION (ADDITION) OF SENSORS, I.A.W.AMMENDED IN POLICY (D) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (E) OFFER SYSTEM CHECKS TO ETMA (G) OEM DETAILS : - Make M/s L&T, India -- SERVICE COST
ADDRESSABLE FLOOD ALARM SYSTEM (AFAS) (Make M/s L&T, India) (EQUIPMENT WILL BE SUPPLIED BY IN) VARIOUS "UNDERTAKE ROUTINES OF AFAS AS FOLLOWS:-" (A) REMOVE(AS PART OF DEGUTTING), REPLACE DEFECTIVE SYSTEM COMPONENTS INCLUDING SENSORS, FOUNDATIONS, CABLES, DBs, PANELS ETC. (B) REGUTTING/ INSTALLATION, CABLING & CONNECTORISATION OF AFAS SENSORS, FOUNDATIONS, CONTROL UNITS AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT AUGMENTATION (ADDITION) OF SENSORS, I.A.W.AMMENDED IN POLICY (D) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (E) OFFER SYSTEM CHECKS TO ETMA (G) OEM DETAILS : - Make M/s L&T, India- MATERIAL COST
SHIP'S SIREN (EQUIPMENT WILL BE PROVIDED BY IN) WHEEL HOUSE UNDERTAKE INSTALLATION OF SHIPS SIREN AS FOLLOWS: - (A) REMOVE OLD GT SIREN INCLUDING MOUNTS, CABLING, FOUNDATIONS ETC. (B) INSTALLATION, CABLING & CONNECTORISATION OF SIREN, CONTROL PANEL AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (D) OFFER SYSTEM HATs TO ETMA/ SS -- SERVICE COST
SHIP'S SIREN (EQUIPMENT WILL BE PROVIDED BY IN) WHEEL HOUSE UNDERTAKE INSTALLATION OF SHIPS SIREN AS FOLLOWS: - (A) REMOVE OLD GT SIREN INCLUDING MOUNTS, CABLING, FOUNDATIONS ETC. (B) INSTALLATION, CABLING & CONNECTORISATION OF SIREN, CONTROL PANEL AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (D) OFFER SYSTEM HATs TO ETMA/ SS - MATERIAL COST
AC DIESEL ALTERNATOR (MCK 103-4) AFT ENGINE ROOM/FWD ENGINE ROOM REPLACE / CALIBRATE / PROVE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER -- SERVICE COST
AC DIESEL ALTERNATOR (MCK 103-4) AFT ENGINE ROOM/FWD ENGINE ROOM REPLACE / CALIBRATE / PROVE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER- MATERIAL COST.
AC DIESEL ALTERNATOR (MCK 92-4) NO.3 DA UNDERTAKE OVERHAUL OF ALTERNATERS AS FOLLOWS: - REPLACE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER -- SERVICE COST
AC DIESEL ALTERNATOR (MCK 92-4) NO.3 DA UNDERTAKE OVERHAUL OF ALTERNATERS AS FOLLOWS: - REPLACE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER- MATERIAL COST.
DIESEL GENERATOR CONTROL - ENGINE ROOMS AND MCR CARRY OUT REFUBISHMENT OF BOTH MAIN AND REMOTE PANELS. (MAKE - M/S SYMPTRONICS) REPLACE INSTRUMENTS (METERS) -- SERVICE COST
DIESEL GENERATOR CONTROL - ENGINE ROOMS AND MCR CARRY OUT REFUBISHMENT OF BOTH MAIN AND REMOTE PANELS. (MAKE - M/S SYMPTRONICS) REPLACE INSTRUMENTS (METERS) - MATERIAL COST
DIESEL GENERATOR CONTROL - ENGINE ROOMS AND MCR REPLACE INSTRUMENTS (METERS) -- SERVICE COST
DIESEL GENERATOR CONTROL - ENGINE ROOMS AND MCR REPLACE INSTRUMENTS (METERS) - MATERIAL COST
DIESEL GENERATOR CONTROL - ENGINE ROOMS AND MCR (PAYMENT IN ACTUALS) RENEWAL OF LUGS AND REWIRING OF CABLE (TYPE - SCREENED, 3 CORE, CORE DIA 2.5 SQ MM, COPPER) FROM ALL ALTERNATORS TO SWITCHBOARD VIEW CABLE PERISHED/ CUT/ SHOWING LOW INSULATION -- SERVICE COST
DIESEL GENERATOR CONTROL - ENGINE ROOMS AND MCR (PAYMENT IN ACTUALS) RENEWAL OF LUGS AND REWIRING OF CABLE (TYPE - SCREENED, 3 CORE, CORE DIA 2.5 SQ MM, COPPER) FROM ALL ALTERNATORS TO SWITCHBOARD VIEW CABLE PERISHED/ CUT/ SHOWING LOW INSULATION- MATERIAL COST
DIESEL GENERATOR CONTROL - ENGINE ROOMS AND MCR REWIRING FROM DA CONTROL PANEL TO LOCAL CONTROL PANEL AND JUNCTION BOX OF ALL THREE DAs IN VIEW OF CABLE PERISHED/DEGUTTED FOR HULL SURVEY(APPROX LENGTH 80 MTRS, SCREENED, 3 CORE, DIA 1.5 SQ MM, COPER) -- SERVICE COST
DIESEL GENERATOR CONTROL - ENGINE ROOMS AND MCR REWIRING FROM DA CONTROL PANEL TO LOCAL CONTROL PANEL AND JUNCTION BOX OF ALL THREE DAs IN VIEW OF CABLE PERISHED/DEGUTTED FOR HULL SURVEY(APPROX LENGTH 80 MTRS, SCREENED, 3 CORE, DIA 1.5 SQ MM, COPER) - MATERIAL COST
DIESEL GENERATOR CONTROL - ENGINE ROOMS AND MCR DA NO.1,2,3 IS NOT STARTING FROM MCR REMOTE PANEL(CCC). DEFECT IDENTIFICATION AND RECTIFICATION FOR THE SAME -- SERVICE COST
DIESEL GENERATOR CONTROL - ENGINE ROOMS AND MCR DA NO.1,2,3 IS NOT STARTING FROM MCR REMOTE PANEL(CCC). DEFECT IDENTIFICATION AND RECTIFICATION FOR THE SAME- MATERIAL COST
ELECTRICAL GENERAL LIGHTING AND CABLING VARRIOUS PLACE REPLACE CABLING JS SYSTEM AUDIO VISUAL ALARM IN VARIOUS COMPARTMENT IN VIEW OF WIRE PERISHED/FAULTY ALARM (APPROX 02 CORE CABLE 2.5 SQMM 300 MTRS REQD) -- SERVICE COST
ELECTRICAL GENERAL LIGHTING AND CABLING VARRIOUS PLACE REPLACE CABLING JS SYSTEM AUDIO VISUAL ALARM IN VARIOUS COMPARTMENT IN VIEW OF WIRE PERISHED/FAULTY ALARM (APPROX 02 CORE CABLE 2.5 SQMM 300 MTRS REQD)- MATERIAL COST
DOOR SWITCH REPLACE DOOR SWITCHES (9 NO) WITH CABLE (SCREENED, 2 CORE, 1 SQ MM, 100 MTR) -- SERVICE COST
DOOR SWITCH REPLACE DOOR SWITCHES (9 NO) WITH CABLE (SCREENED, 2 CORE, 1 SQ MM, 100 MTR)- MATERIAL COST
SIRS 4012 A - WHEEL HOUSE UNDERTAKE THE FOLLOWING ON SIRS SYSTEM CALIBRATION/ SERVIABILITY CHECKS OF RADIOACTIVE SOURCE OF SIRS. CALIBRATION/ - SERVICE COSTABILITY CHECK OF FOLLOWINGS:-(A)SIRS SYSTEM WITH SENSORS. (B)RADIATION SURVEY METER. (C) POCKET DOZIMETER. (D) CONTAMINATION MONITOR. RENEWAL OF ALL BASE MOUNT PLATES OF SIRS SENSORS IN VIEW OF CORRODED/DAMAGED(QTY-05). REPAIR OF POCKET DOZY METER 04 IN NO, RADIATION SURVEY METER 01 IN NO, DE-CONTAMINATION METER 01 IN NO REPAIR OF 05 IN NO OFF SIRS SENSORS -- SERVICE COST
SIRS 4012 A - WHEEL HOUSE UNDERTAKE THE FOLLOWING ON SIRS SYSTEM CALIBRATION/ SERVIABILITY CHECKS OF RADIOACTIVE SOURCE OF SIRS. CALIBRATION/ - SERVICE COSTABILITY CHECK OF FOLLOWINGS:-(A)SIRS SYSTEM WITH SENSORS. (B)RADIATION SURVEY METER. (C) POCKET DOZIMETER. (D) CONTAMINATION MONITOR. RENEWAL OF ALL BASE MOUNT PLATES OF SIRS SENSORS IN VIEW OF CORRODED/DAMAGED(QTY-05). REPAIR OF POCKET DOZY METER 04 IN NO, RADIATION SURVEY METER 01 IN NO, DE-CONTAMINATION METER 01 IN NO REPAIR OF 05 IN NO OFF SIRS SENSORS- MATERIAL COST
STEERING SYSTEM (AIST-12-10) - TILLER FLAT UNDERTAKE FOLLOWING ROUTINES OVERHAUL OF STEERING SYSTEM: - REPLACE AND CALIBRATE PRESSURE GAUGES VIEW ERRATIC READING -- SERVICE COST
STEERING SYSTEM (AIST-12-10) - TILLER FLAT UNDERTAKE FOLLOWING ROUTINES OVERHAUL OF STEERING SYSTEM: - REPLACE AND CALIBRATE PRESSURE GAUGES VIEW ERRATIC READING- MATERIAL COST
Scope 2 - Instrumentation Jobs of Various Systems - (RM.0789)
UNDERTAKE MAJOR OVERHAUL OF FWD CAPSTAN AS FOLLOWS: - (IV) REPLACE THE PRESSURE GAUGE (04 NO) (IX) REPLACE SOLENOID VALVES (04 NO) -- SERVICE COST
UNDERTAKE MAJOR OVERHAUL OF FWD CAPSTAN AS FOLLOWS: - (IV) REPLACE THE PRESSURE GAUGE (04 NO) (IX) REPLACE SOLENOID VALVES (04 NO) - MATERIAL COST
SHAFT RPM INDICATOR IS DEFECTIVE AND NOT SHOWING SPRM READINGS ON CCC. REPLACE OF SHAFT RPM INDICATOR. -- SERVICE COST
SHAFT RPM INDICATOR IS DEFECTIVE AND NOT SHOWING SPRM READINGS ON CCC. REPLACE OF SHAFT RPM INDICATOR. - MATERIAL COST
UNDERTAKE ROUTINES OF AC CONDENSATE SYSTEM AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES (SUCTION AND DISCHARGE QTY 07) VIEW GAUGE MALFUNCTIONING-- SERVICE COST .
UNDERTAKE ROUTINES OF AC CONDENSATE SYSTEM AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES (SUCTION AND DISCHARGE QTY 07) VIEW GAUGE MALFUNCTIONING- MATERIAL COST.
UNDERTAKE ROUTINES OF AC CONDENSATE SYSTEM AS FOLLOWS: - AUTO CUT IN / CUT OUT DFECTIVE. TO BE REFURBISHED BY REPLACING LEVEL SENSORS, CABLING ETC. OFFER TRIALS OF SYSTEM-- SERVICE COST
UNDERTAKE ROUTINES OF AC CONDENSATE SYSTEM AS FOLLOWS: - AUTO CUT IN / CUT OUT DFECTIVE. TO BE REFURBISHED BY REPLACING LEVEL SENSORS, CABLING ETC. OFFER TRIALS OF SYSTEM- MATERIAL COST
FER & AER UNDERTAKE 12K ROUTINES OF DA 1, 2 & 3 USING OEM SUPPLIED MOH SPARES KIT (REF MAINTOP NO. 410002) AS FOLLOWS REMOVE AND CHECK THE OVER SPEED TRIP (PROTECTION DEVICE/ SENSOR) FOR CORRECT SETTING/FUNCTIONING, CALIBRATE IF NECESSARY-- SERVICE COST .
FER & AER UNDERTAKE 12K ROUTINES OF DA 1, 2 & 3 USING OEM SUPPLIED MOH SPARES KIT (REF MAINTOP NO. 410002) AS FOLLOWS REMOVE AND CHECK THE OVER SPEED TRIP (PROTECTION DEVICE/ SENSOR) FOR CORRECT SETTING/FUNCTIONING, CALIBRATE IF NECESSARY- MATERIAL COST.
FER & AER UNDERTAKE 12K ROUTINES OF DA 1, 2 & 3 USING OEM SUPPLIED MOH SPARES KIT (REF MAINTOP NO. 410002) AS FOLLOWS MANUFACTURING OF FOLLOWING COVER AS PER DIMENSIONS (A) DA CONTROL PANEL, MAT-GI SHEET. (B) DA CONTROL PANEL MAT-GI SHEET. (C) DA JUNCTION BOX, MAT- GI SHEET-- SERVICE COST .
FER & AER UNDERTAKE 12K ROUTINES OF DA 1, 2 & 3 USING OEM SUPPLIED MOH SPARES KIT (REF MAINTOP NO. 410002) AS FOLLOWS MANUFACTURING OF FOLLOWING COVER AS PER DIMENSIONS (A) DA CONTROL PANEL, MAT-GI SHEET. (B) DA CONTROL PANEL MAT-GI SHEET. (C) DA JUNCTION BOX, MAT- GI SHEET- MATERIAL COST.
FER & AER UNDERTAKE 12K ROUTINES OF DA 1, 2 & 3 USING OEM SUPPLIED MOH SPARES KIT (REF MAINTOP NO. 410002) AS FOLLOWS PROVIDE & FITMENT OF MANOMETERS ON DA NO. 1,2 AND 3 TURBOCHARGER-- SERVICE COST
FER & AER UNDERTAKE 12K ROUTINES OF DA 1, 2 & 3 USING OEM SUPPLIED MOH SPARES KIT (REF MAINTOP NO. 410002) AS FOLLOWS PROVIDE & FITMENT OF MANOMETERS ON DA NO. 1,2 AND 3 TURBOCHARGER - MATERIAL COST
ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA CONTROL WIRING FROM CONTROL PANEL/ BUPS PANEL TO LOCAL CONTROL PANEL IN VIEW OF WIRE PERISHED-- SERVICE COST .
ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA CONTROL WIRING FROM CONTROL PANEL/ BUPS PANEL TO LOCAL CONTROL PANEL IN VIEW OF WIRE PERISHED- MATERIAL COST.
ENGINE ROOM UNDERTAKE MANUFACURING OF CABLE TRAY/ CLAMPS FOR PROPER SECURING ARRANGEMENT OF CABLES OF ALL THREE DAS. LCP to engine 10mtr each DA, total 30mtr-- SERVICE COST
ENGINE ROOM UNDERTAKE MANUFACURING OF CABLE TRAY/ CLAMPS FOR PROPER SECURING ARRANGEMENT OF CABLES OF ALL THREE DAS. LCP to engine 10mtr each DA, total 30mtr- MATERIAL COST
ENGINE ROOM UNDERTAKE - SERVICE COSTABILITY CHECK OF DA LOCAL JUNCTION BOXES-- SERVICE COST
ENGINE ROOM UNDERTAKE - SERVICE COSTABILITY CHECK OF DA LOCAL JUNCTION BOXES- MATERIAL COST
ENGINE ROOM REWIRING OF DA CONTROL WIRES BETWEEN LOCAL CONTROL AND REMOTE CONTROL IN VIEW OF EXCESSIVE PERISHED. LENGTH- 40 MTRS-- SERVICE COST .
ENGINE ROOM REWIRING OF DA CONTROL WIRES BETWEEN LOCAL CONTROL AND REMOTE CONTROL IN VIEW OF EXCESSIVE PERISHED. LENGTH- 40 MTRS- MATERIAL COST.
D/A GOVERNING SYSTEM ENGINE ROOM REWIRING OF DA INSTRUMENTATION SENSOR WIRES IN VIEW OF EXCESSIVE PERISHED. LENGTH- 30 MTRS-- SERVICE COST .
D/A GOVERNING SYSTEM ENGINE ROOM REWIRING OF DA INSTRUMENTATION SENSOR WIRES IN VIEW OF EXCESSIVE PERISHED. LENGTH- 30 MTRS- MATERIAL COST.
ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA METALLIC CONDUCT FOR WIRING FROM CONTROL PANEL TO LOCAL CONTROL PANEL AND LOCAL CONTROL PANEL TO DA IN VIEW OF CORRODED-- SERVICE COST .
ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA METALLIC CONDUCT FOR WIRING FROM CONTROL PANEL TO LOCAL CONTROL PANEL AND LOCAL CONTROL PANEL TO DA IN VIEW OF CORRODED- MATERIAL COST.
D/A GOVERNING SYSTEM ENGINE ROOM UNDERTAKE COMPLETE REFURBISHENT OF ALL THREE DA LOCAL CONTROL PANEL AND FITMENT PROVING TO NAVY TRIAL AGENCY INCLUDING GOVERNOR TUNING . (MAKE - M/S SYMPTRONICS)-- SERVICE COST
D/A GOVERNING SYSTEM ENGINE ROOM UNDERTAKE COMPLETE REFURBISHENT OF ALL THREE DA LOCAL CONTROL PANEL AND FITMENT PROVING TO NAVY TRIAL AGENCY INCLUDING GOVERNOR TUNING . (MAKE - M/S SYMPTRONICS)- MATERIAL COST
ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA SENSOR/ INSTRUMENTATION WING IN VIEW OF WIRE PERISHED-- SERVICE COST .
ENGINE ROOM UNDERTAKE RENEWAL OF ALL THREE DA SENSOR/ INSTRUMENTATION WING IN VIEW OF WIRE PERISHED- MATERIAL COST.
ENGINE ROOM UNDERTAKE COMPLETE REFURBISHMENT OF REMOTE CONTROL PANEL OF ALL THREE DAS IN MCR IN VIEW OF FAULTY ALARM AND INDICATION LAMP NOT GLOWING PROPERLY-- SERVICE COST .
ENGINE ROOM UNDERTAKE COMPLETE REFURBISHMENT OF REMOTE CONTROL PANEL OF ALL THREE DAS IN MCR IN VIEW OF FAULTY ALARM AND INDICATION LAMP NOT GLOWING PROPERLY- MATERIAL COST.
UNDERTAKE OVERHAUL/ ROUTINES ON ALL 07 PACKAGE Acs AS FOLLOWS (MAKE VOLTAS, CAPACITY - 4 TR) : - REPLACE AND CALIBRATE ALL PRESSURE AND TEMPERATURE GAUGES.(QTY-07 EACH) VIEW MALFUNCTIONING-- SERVICE COST .
UNDERTAKE OVERHAUL/ ROUTINES ON ALL 07 PACKAGE Acs AS FOLLOWS (MAKE VOLTAS, CAPACITY - 4 TR) : - REPLACE AND CALIBRATE ALL PRESSURE AND TEMPERATURE GAUGES.(QTY-07 EACH) VIEW MALFUNCTIONING- MATERIAL COST.
UNDERTAKE OVERHAUL/ ROUTINES ON ALL 07 PACKAGE Acs AS FOLLOWS (MAKE VOLTAS, CAPACITY - 4 TR) : - AC PLANT NOT TRIPPING DURING PROTECTION CHECKS. REPLACE AND UNDERTAKE CALIBRATION CHECKS OF CUTOUTS (A) LP CUT OUT (B) TEMP CUTOUT (C) HP CUTOUT, RANGE 270 PSI-- SERVICE COST
UNDERTAKE OVERHAUL/ ROUTINES ON ALL 07 PACKAGE Acs AS FOLLOWS (MAKE VOLTAS, CAPACITY - 4 TR) : - AC PLANT NOT TRIPPING DURING PROTECTION CHECKS. REPLACE AND UNDERTAKE CALIBRATION CHECKS OF CUTOUTS (A) LP CUT OUT (B) TEMP CUTOUT (C) HP CUTOUT, RANGE 270 PSI- MATERIAL COST.
UNDERTAKE OVERHAUL OF FIREMAIN PUMPS AS FOLLOWS(QTY - 02 NO, MAKE - M/S JOHNSON, CAPACITY - 60 TPH):- REPLACE AND CALIBRATE ALL INSTRUMENTATION(PRESSURE GAUGE ETC) -- SERVICE COST
UNDERTAKE OVERHAUL OF FIREMAIN PUMPS AS FOLLOWS(QTY - 02 NO, MAKE - M/S JOHNSON, CAPACITY - 60 TPH):- REPLACE AND CALIBRATE ALL INSTRUMENTATION(PRESSURE GAUGE ETC)- MATERIAL COST.
CARRY OUT ROUTINES OF AK 176/ AK 630 SPRINKLING SYSTEMS (QTY 02) AS FOLLOWS: - CALIBRATE/RENEW PRESSURE SWITCHES. REPLACE IF DEFECTIVE -- SERVICE COST
CARRY OUT ROUTINES OF AK 176/ AK 630 SPRINKLING SYSTEMS (QTY 02) AS FOLLOWS: - CALIBRATE/RENEW PRESSURE SWITCHES. REPLACE IF DEFECTIVE- MATERIAL COST
FIREMAIN SYSTEM SCATTERED CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND REFIT PRESSURE GAUGE VALVES -- SERVICE COST
FIREMAIN SYSTEM SCATTERED CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND REFIT PRESSURE GAUGE VALVES- MATERIAL COST.
FIREMAIN SYSTEM SCATTERED CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE ALL PRESSURE GAUGES. {(A) SUCTION GAUGE - 1 TO 2 KGF/CM2 (QTY- 05) (B) DISCHARGE GAUGE - 0 TO 20 KGF/CM2 (QTY- 15), (C) 0 TO 10 KGF/CM2, QTY- 03} -- SERVICE COST
FIREMAIN SYSTEM SCATTERED CARRY OUT ROUTINES OF FIREMAIN SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE ALL PRESSURE GAUGES. {(A) SUCTION GAUGE - 1 TO 2 KGF/CM2 (QTY- 05) (B) DISCHARGE GAUGE - 0 TO 20 KGF/CM2 (QTY- 15), (C) 0 TO 10 KGF/CM2, QTY- 03}- MATERIAL COST
FOAM FIRE SMOOTHERING SYSTEM (CO 500) MAIN ALLEWAY CARRY OUT OVERHAUL/ ROUTINES OF FOAM SMOOTHERINGTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES -- SERVICE COST
FOAM FIRE SMOOTHERING SYSTEM (CO 500) MAIN ALLEWAY CARRY OUT OVERHAUL/ ROUTINES OF FOAM SMOOTHERINGTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES- MATERIAL COST.
GT FIRE FIGHTING SYS. (DRY CHEMICAL) - AER/FER CARRY OUT OVERHAUL/ ROUTINES OF GT FIRE SMOOTHERING SYSTEMS IN BOTH ENGINE ROOMS AS FOLLOWS: - CALIBRATE PRESSURE GAUGES -- SERVICE COST
GT FIRE FIGHTING SYS. (DRY CHEMICAL) - AER/FER CARRY OUT OVERHAUL/ ROUTINES OF GT FIRE SMOOTHERING SYSTEMS IN BOTH ENGINE ROOMS AS FOLLOWS: - CALIBRATE PRESSURE GAUGES- MATERIAL COST.
FRESH WATER PUMP - FER (PORT / STBD) UNDERTAKE OVERHAUL OF FRESH WATER PUMP AS FOLLOWS: - REPLACE AND CALIBRATE ALL TEMPERATURE AND PRESSURE GAUGES VIEW DEFECTIVE -- SERVICE COST
FRESH WATER PUMP - FER (PORT / STBD) UNDERTAKE OVERHAUL OF FRESH WATER PUMP AS FOLLOWS: - REPLACE AND CALIBRATE ALL TEMPERATURE AND PRESSURE GAUGES VIEW DEFECTIVE- MATERIAL COST.
DOMESTIC FW SYSTEM THROUGHOUT SHIP CARRY OUT ROUTINES OF FW SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES -- SERVICE COST
DOMESTIC FW SYSTEM THROUGHOUT SHIP CARRY OUT ROUTINES OF FW SYSTEMS AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES- MATERIAL COST.
HP AIR COMPRESSOR (ELGI EKPA 2/150) - AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 1 CONTROL PANEL , INCLUDING CABLING AND TERMINATION (EQUIPMENT SUPPLIED BY NAVY) -- SERVICE COST
HP AIR COMPRESSOR (ELGI EKPA 2/150) - AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 1 CONTROL PANEL , INCLUDING CABLING AND TERMINATION (EQUIPMENT SUPPLIED BY NAVY) -- MATERIAL COST
HP AIR COMPRESSOR (ELGI EKPA 2/150) - AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 2 CONTROL PANEL INCLUDING CABLING AND TERMINATION. (EQUIPMENTSUPPLIED BY NAVY) -- SERVICE COST
HP AIR COMPRESSOR (ELGI EKPA 2/150) - AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACEMENT OF HPAC NO 2 CONTROL PANEL INCLUDING CABLING AND TERMINATION. (EQUIPMENT SUPPLIED BY NAVY)- MATERIAL COST
HP AIR COMPRESSOR (ELGI EKPA 2/150) - AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACE AUTO CUT IN AND CUT OFF SYSTEM AND STW FOR CORRECT OPERATION) -- SERVICE COST
HP AIR COMPRESSOR (ELGI EKPA 2/150) - AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- REPLACE AUTO CUT IN AND CUT OFF SYSTEM AND STW FOR CORRECT OPERATION) - MATERIAL COST
HP AIR COMPRESSOR (ELGI EKPA 2/150) - AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- UNDERTAKE REFURBISHMENT OF REMOTE OPERATION PANEL IN MCR (QTY 1). REPLACE CABLING, INERNAL WIRING, SWITCHES, RELAYS, INDICATORS, KNOBs ETC VIEW WORN OUT DUE TO PROLONED USAGE -- SERVICE COST
HP AIR COMPRESSOR (ELGI EKPA 2/150) - AER/FER UNDERTAKE FOLLOWING ON BOTH HPAC COMPRESSORS :- UNDERTAKE REFURBISHMENT OF REMOTE OPERATION PANEL IN MCR (QTY 1). REPLACE CABLING, INERNAL WIRING, SWITCHES, RELAYS, INDICATORS, KNOBs ETC VIEW WORN OUT DUE TO PROLONED USAGE- MATERIAL COST.
HP AIR SYSTEM SCATTERED UNDERTAKE FOLLOWING ON HP AIR SYSTEM COMPRESSORS :- FOLLOWING GAUGES DEFECTIVE. REPLACE THE AIR SYSTEM PRESSURE GAUGES. (A) RANGE: 0-250 KGF/CM2, QTY- 10. (B) RANGE: 0-100 KGF/CM2, QTY- 05. (C) RANGE:0-40 KGF/CM2, QTY-05 -- SERVICE COST
HP AIR SYSTEM SCATTERED UNDERTAKE FOLLOWING ON HP AIR SYSTEM COMPRESSORS :- FOLLOWING GAUGES DEFECTIVE. REPLACE THE AIR SYSTEM PRESSURE GAUGES. (A) RANGE: 0-250 KGF/CM2, QTY- 10. (B) RANGE: 0-100 KGF/CM2, QTY- 05. (C) RANGE:0-40 KGF/CM2, QTY-05- MATERIAL COST.
JS FIRE FIGHTING SYSTEM NEAR CO CABIN/ QUERTER DECK UNDERTAKE OVERHAUL OF THE JS(HALON) FIRE FIGHTING SYSTEMS (FWD AND AFT) AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES -- SERVICE COST .
JS FIRE FIGHTING SYSTEM NEAR CO CABIN/ QUERTER DECK UNDERTAKE OVERHAUL OF THE JS(HALON) FIRE FIGHTING SYSTEMS (FWD AND AFT) AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES- MATERIAL COST.
REFRIGERATION PLANT (700 KCAL/HR) ASP PORT STORE/ ASP STBD CANTEEN/ SHIPS GALLEY RENEW & CALIBRATE ALL INSTRUMENTATION -- SERVICE COST .
REFRIGERATION PLANT (700 KCAL/HR) ASP PORT STORE/ ASP STBD CANTEEN/ SHIPS GALLEY RENEW & CALIBRATE ALL INSTRUMENTATION- MATERIAL COST .
SANITARY PUMP - AER PORT UNDERTAKE FOLLOWING ON SANITARY PUMP: - REPLACE AND CALIBRATE ALL INSTRUMENTATION -- SERVICE COST .
SANITARY PUMP - AER PORT UNDERTAKE FOLLOWING ON SANITARY PUMP: - REPLACE AND CALIBRATE ALL INSTRUMENTATION- MATERIAL COST.
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED UNDERTAKE OVERHAUL OF TANK LEVEL SYSTEM. REPLACE SENSORS AND CABLING. PROVE SYSTEM IN LOCAL AND REMOTE OPERATION . SENSOR- 07NOS -- SERVICE COST
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED UNDERTAKE OVERHAUL OF TANK LEVEL SYSTEM. REPLACE SENSORS AND CABLING. PROVE SYSTEM IN LOCAL AND REMOTE OPERATION . SENSOR- 07NOS- MATERIAL COST
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED ELECTROMAGNETIC VALVES OF SHIP FUEL SYSTEM NOT HOLDING. UNDERTAKE OF ELECTROMAGNETIC VALVE MOTOR, AND OF VALVE SEATING VIEW SEEAPAGE IN CLOSED POSITION -- SERVICE COST .
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED ELECTROMAGNETIC VALVES OF SHIP FUEL SYSTEM NOT HOLDING. UNDERTAKE OF ELECTROMAGNETIC VALVE MOTOR, AND OF VALVE SEATING VIEW SEEAPAGE IN CLOSED POSITION- MATERIAL COST.
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED EM VALVES AND EMERGENCY DRAIN VALVES NOT OPERATING FROM MCR. UNDERTAKE REPAIRS AND OVERHAULING CONTROL CIRCUIT FROM CCC PANEL TO EACH VALVE AND PROVE REMOTE OPERATIONS (TOTAL CKTS - 12 NO) -- SERVICE COST
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED EM VALVES AND EMERGENCY DRAIN VALVES NOT OPERATING FROM MCR. UNDERTAKE REPAIRS AND OVERHAULING CONTROL CIRCUIT FROM CCC PANEL TO EACH VALVE AND PROVE REMOTE OPERATIONS (TOTAL CKTS - 12 NO)- MATERIAL COST
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED REPLACE LOW/HIGH LEVEL SENSORS OF ALL SEVEN FUEL TANKS AND PROVE FUNCTIONALITY FROM CCC PANEL. (QTY - 18 NO) -- SERVICE COST
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED REPLACE LOW/HIGH LEVEL SENSORS OF ALL SEVEN FUEL TANKS AND PROVE FUNCTIONALITY FROM CCC PANEL. (QTY - 18 NO)- MATERIAL COST
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED FOLLOWING GAUGES READING ERRATIC AND MALFUNCTIONING. UNDEERTAKE CALIBRATION/ SERVICABLITY CHECKS OF FOLLOWING PRESSURE GAUGES.(A) -1 TO 1.5 KGF/CM2,(B) 0 TO 16 KGF/CM2,QTY- 03 (C) 02TO 10 KGF/CM2,QTY- 02(D) 0 TO 9 KGF/CM2,QTY- 01(E) 0 TO 150 KGF/CM2,QTY-01(F) 0 TO 4 KGF/CM2, " REPLACE IF REQUIRED -- SERVICE COST .
SHIPS FUEL SYSTEM (1241RE/PE) - SCATTERED FOLLOWING GAUGES READING ERRATIC AND MALFUNCTIONING. UNDEERTAKE CALIBRATION/ SERVICABLITY CHECKS OF FOLLOWING PRESSURE GAUGES.(A) -1 TO 1.5 KGF/CM2,(B) 0 TO 16 KGF/CM2,QTY- 03 (C) 02TO 10 KGF/CM2,QTY- 02(D) 0 TO 9 KGF/CM2,QTY- 01(E) 0 TO 150 KGF/CM2,QTY-01(F) 0 TO 4 KGF/CM2, " REPLACE IF REQUIRED- MATERIAL COST.
PENUMATIC SIREN (TYPHOON) - SUPER STRUCTURE CALIBRATE CONTROL INSTRUMENTS -- SERVICE COST .
PENUMATIC SIREN (TYPHOON) - SUPER STRUCTURE CALIBRATE CONTROL INSTRUMENTS- MATERIAL COST.
PENUMATIC SIREN (TYPHOON) - SUPER STRUCTURE RENEW TYPHOON ASSEMBLY -- SERVICE COST .
PENUMATIC SIREN (TYPHOON) - SUPER STRUCTURE RENEW TYPHOON ASSEMBLY- MATERIAL COST- MATERIAL COST.
PENUMATIC SIREN (TYPHOON) - SUPER STRUCTURE REPLACE SOLENOID VALVE/MANUAL VALVE -- SERVICE COST .
PENUMATIC SIREN (TYPHOON) - SUPER STRUCTURE REPLACE SOLENOID VALVE/MANUAL VALVE- MATERIAL COST.
PENUMATIC SIREN (TYPHOON) - SUPER STRUCTURE OFFER SYSTEM TRIALS AS PER IN STANDARDS INCLUDING SEA TRIALS AND PROVE SYSTEM -- SERVICE COST
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- REPLACE AND CALIBRATE ALL PRESSURE GAUGES -- SERVICE COST .
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- REPLACE AND CALIBRATE ALL PRESSURE GAUGES- MATERIAL COST.
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION/ REPLACEMENT OF STEERING GEAR SYSTEM PRESSURE GAUGES. RANGE: 0-100 KGF/CM2 -- SERVICE COST
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION/ REPLACEMENT OF STEERING GEAR SYSTEM PRESSURE GAUGES. RANGE: 0-100 KGF/CM2- MATERIAL COST,
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION OF HYDRAULIC SYSTEM PRESSURE GAUGES. RANGE: 0-250 KGF/CM2 -- SERVICE COST
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- UNDERTAKE CALIBRATION OF HYDRAULIC SYSTEM PRESSURE GAUGES. RANGE: 0-250 KGF/CM2- MATERIAL COST
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- ORION LEAKAGE OBSERVED INI THE THE 4/3 VALVE LEADING TO INADVERT OPERATIONAL. UNDERTAKE REPAIR AND OVERHAULING OF 4/3 WAY VV OF STEERING GEAR SYSTEM SYSTEM -- SERVICE COST .
STEERING GEAR (SERVESTAL 124PE/RE) - ASP CARRY OUT MAJOR OVERHAUL OF STEERING GEAR SYSTEM WITH ASSOCIATED PUMP, MOTORS, CONTROLS, REPEATERS AS FOLLOWS:- ORION LEAKAGE OBSERVED INI THE THE 4/3 VALVE LEADING TO INADVERT OPERATIONAL. UNDERTAKE REPAIR AND OVERHAULING OF 4/3 WAY VV OF STEERING GEAR SYSTEM SYSTEM- MATERIAL COST.
BRACKETS / CLAMPS - Scattered UNDERTAKE FITMENT OF SUPPORTING BRACKETS FOR THE FOLLOWING:-(d) PRESSURE GAUGES, QTY- 100 -- SERVICE COST .
BRACKETS / CLAMPS - Scattered UNDERTAKE FITMENT OF SUPPORTING BRACKETS FOR THE FOLLOWING:-(d) PRESSURE GAUGES, QTY- 100- MATERIAL COST.
MISC SCATTERED NAGMAN LP CALIBERATOR DEFUCNTIONAL. UNDERTAKE - SERVICE COSTBILITY CHECKS/CALIBERATION AND REPAIR OF NAGMAN LP CALIBERATOR -- SERVICE COST
MISC SCATTERED NAGMAN LP CALIBERATOR DEFUCNTIONAL. UNDERTAKE - SERVICE COSTBILITY CHECKS/CALIBERATION AND REPAIR OF NAGMAN LP CALIBERATOR- MATERIAL COST
MISC SCATTERED NAGMAN HP CALIBERATOR NOT OPERATIONAL. UNDERTAKE - SERVICE COSTBILITY CHECKS/CALIBRATION AND REPAIR OF NAGMAN HP CALIBERATOR -- SERVICE COST
MISC SCATTERED NAGMAN HP CALIBERATOR NOT OPERATIONAL. UNDERTAKE - SERVICE COSTBILITY CHECKS/CALIBRATION AND REPAIR OF NAGMAN HP CALIBERATOR- MATERIAL COST
MISC SCATTERED KITTIWAKE LUB OIL TEST KIT READING ERRATIC VALUES/ DEFUNC. UNDERTAKE REPAIRS AND PROVE - SERVICE COSTABILITY CHECKS/CALIBERATION OF KITIWAKE TEST KIT -- SERVICE COST
MISC SCATTERED KITTIWAKE LUB OIL TEST KIT READING ERRATIC VALUES/ DEFUNC. UNDERTAKE REPAIRS AND PROVE - SERVICE COSTABILITY CHECKS/CALIBERATION OF KITIWAKE TEST KIT - MATERIAL COST
ADDRESSABLE FLOOD ALARM SYSTEM (AFAS) (Make M/s L&T, India) (EQUIPMENT WILL BE SUPPLIED BY IN) VARIOUS "UNDERTAKE ROUTINES OF AFAS AS FOLLOWS:-" (A) REMOVE(AS PART OF DEGUTTING), REPLACE DEFECTIVE SYSTEM COMPONENTS INCLUDING SENSORS, FOUNDATIONS, CABLES, DBs, PANELS ETC. (B) REGUTTING/ INSTALLATION, CABLING & CONNECTORISATION OF AFAS SENSORS, FOUNDATIONS, CONTROL UNITS AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT AUGMENTATION (ADDITION) OF SENSORS, I.A.W.AMMENDED IN POLICY (D) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (E) OFFER SYSTEM CHECKS TO ETMA -- SERVICE COST
ADDRESSABLE FLOOD ALARM SYSTEM (AFAS) (Make M/s L&T, India) (EQUIPMENT WILL BE SUPPLIED BY IN) VARIOUS "UNDERTAKE ROUTINES OF AFAS AS FOLLOWS:-" (A) REMOVE(AS PART OF DEGUTTING), REPLACE DEFECTIVE SYSTEM COMPONENTS INCLUDING SENSORS, FOUNDATIONS, CABLES, DBs, PANELS ETC. (B) REGUTTING/ INSTALLATION, CABLING & CONNECTORISATION OF AFAS SENSORS, FOUNDATIONS, CONTROL UNITS AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT AUGMENTATION (ADDITION) OF SENSORS, I.A.W.AMMENDED IN POLICY (D) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (E) OFFER SYSTEM CHECKS TO ETMA - MATERIAL COST
SHIP'S SIREN (EQUIPMENT WILL BE PROVIDED BY IN) WHEEL HOUSE UNDERTAKE INSTALLATION OF SHIPS SIREN AS FOLLOWS: - (A) REMOVE OLD GT SIREN INCLUDING MOUNTS, CABLING, FOUNDATIONS ETC. (B) INSTALLATION, CABLING & CONNECTORISATION OF SIREN, CONTROL PANEL AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (D) OFFER SYSTEM HATs TO ETMA/ SS -- SERVICE COST
SHIP'S SIREN (EQUIPMENT WILL BE PROVIDED BY IN) WHEEL HOUSE UNDERTAKE INSTALLATION OF SHIPS SIREN AS FOLLOWS: - (A) REMOVE OLD GT SIREN INCLUDING MOUNTS, CABLING, FOUNDATIONS ETC. (B) INSTALLATION, CABLING & CONNECTORISATION OF SIREN, CONTROL PANEL AND ASSOCIATED COMPONENTS AS PER IN APPROVED BPs AND DRAWINGS. (C) CARRY OUT STW, PROVE FUNCTIONING OF SYSTEM AS PER APPROVED BPs. (D) OFFER SYSTEM HATs TO ETMA/ SS - MATERIAL COST
AC DIESEL ALTERNATOR (MCK 103-4) AFT ENGINE ROOM/FWD ENGINE ROOM SUPPLY , CALIBRATE AND REPLACE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER -- SERVICE COST .
AC DIESEL ALTERNATOR (MCK 103-4) AFT ENGINE ROOM/FWD ENGINE ROOM SUPPLY , CALIBRATE AND REPLACE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER- MATERIAL COST.
AC DIESEL ALTERNATOR (MCK 92-4) NO.3 DA UNDERTAKE OVERHAUL OF ALTERNATERS AS FOLLOWS: - REPLACE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER -- SERVICE COST .
AC DIESEL ALTERNATOR (MCK 92-4) NO.3 DA UNDERTAKE OVERHAUL OF ALTERNATERS AS FOLLOWS: - REPLACE (A) THERMO-COUPLE (B) ELECTRICAL TEMPERATURE INDICATOR. (C) TACHO-METER TRANSMITTER- MATERIAL COST.
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR CARRY OUT REFUBISHMENT OF BOTH MAIN AND REMOTE PANELS. (MAKE - M/S SYMPTRONICS) REPLACE INSTRUMENTS (METERS) -- SERVICE COST
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR CARRY OUT REFUBISHMENT OF BOTH MAIN AND REMOTE PANELS. (MAKE - M/S SYMPTRONICS) REPLACE INSTRUMENTS (METERS) - MATERIAL COST
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR REPLACE INSTRUMENTS (METERS) -- SERVICE COST
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR REPLACE INSTRUMENTS (METERS) - MATERIAL COST
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR (PAYMENT IN ACTUALS) RENEWAL OF LUGS AND REWIRING OF CABLE (TYPE - SCREENED, 3 CORE, CORE DIA 2.5 SQ MM, COPPER) FROM ALL ALTERNATORS TO SWITCHBOARD VIEW CABLE PERISHED/ CUT/ SHOWING LOW INSULATION -- SERVICE COST
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR (PAYMENT IN ACTUALS) RENEWAL OF LUGS AND REWIRING OF CABLE (TYPE - SCREENED, 3 CORE, CORE DIA 2.5 SQ MM, COPPER) FROM ALL ALTERNATORS TO SWITCHBOARD VIEW CABLE PERISHED/ CUT/ SHOWING LOW INSULATION- MATERIAL COST
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR REWIRING FROM DA CONTROL PANEL TO LOCAL CONTROL PANEL AND JUNCTION BOX OF ALL THREE DAs IN VIEW OF CABLE PERISHED/DEGUTTED FOR HULL SURVEY(APPROX LENGTH 80 MTRS, SCREENED, 3 CORE, DIA 1.5 SQ MM, COPER) -- SERVICE COST
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR REWIRING FROM DA CONTROL PANEL TO LOCAL CONTROL PANEL AND JUNCTION BOX OF ALL THREE DAs IN VIEW OF CABLE PERISHED/DEGUTTED FOR HULL SURVEY(APPROX LENGTH 80 MTRS, SCREENED, 3 CORE, DIA 1.5 SQ MM, COPER) - MATERIAL COST
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR DA NO.1,2,3 IS NOT STARTING FROM MCR REMOTE PANEL(CCC). DEFECT IDENTIFICATION AND RECTIFICATION FOR THE SAME -- SERVICE COST
DIESEL GENERATOR CONTROL ENGINE ROOMS AND MCR DA NO.1,2,3 IS NOT STARTING FROM MCR REMOTE PANEL(CCC). DEFECT IDENTIFICATION AND RECTIFICATION FOR THE SAME- MATERIAL COST
ELECTRICAL GENERAL LIGHTING AND CABLING VARIOUS PLACE REPAIR OF QOV PRESSURE DOM SWITCHES IN VIEW OF MALFUNCTIONING.(QTY-08) -- SERVICE COST
ELECTRICAL GENERAL LIGHTING AND CABLING VARIOUS PLACE REPAIR OF QOV PRESSURE DOM SWITCHES IN VIEW OF MALFUNCTIONING.(QTY-08)- MATERIAL COST
ELECTRICAL GENERAL LIGHTING AND CABLING VARRIOUS PLACE REPLACE CABLING JS SYSTEM AUDIO VISUAL ALARM IN VARIOUS COMPARTMENT IN VIEW OF WIRE PERISHED/FAULTY ALARM (APPROX 02 CORE CABLE 2.5 SQMM 300 MTRS REQD) -- SERVICE COST
ELECTRICAL GENERAL LIGHTING AND CABLING VARRIOUS PLACE REPLACE CABLING JS SYSTEM AUDIO VISUAL ALARM IN VARIOUS COMPARTMENT IN VIEW OF WIRE PERISHED/FAULTY ALARM (APPROX 02 CORE CABLE 2.5 SQMM 300 MTRS REQD)- MATERIAL COST
DOOR SWITCH REPLACE DOOR SWITCHES (9 NO) WITH CABLE (SCREENED, 2 CORE, 1 SQ MM, 100 MTR) -- SERVICE COST
DOOR SWITCH REPLACE DOOR SWITCHES (9 NO) WITH CABLE (SCREENED, 2 CORE, 1 SQ MM, 100 MTR)- MATERIAL COST
SIRS 4012 A WHEEL HOUSE UNDERTAKE THE FOLLOWING ON SIRS SYSTEM CALIBRATION/ SERVIABILITY CHECKS OF RADIOACTIVE SOURCE OF SIRS. CALIBRATION/ - SERVICE COSTABILITY CHECK OF FOLLOWINGS:- (A)SIRS SYSTEM WITH SENSORS. (B)RADIATION SURVEY METER. (C) POCKET DOZIMETER. (D) CONTAMINATION MONITOR. RENEWAL OF ALL BASE MOUNT PLATES OF SIRS SENSORS IN VIEW OF CORRODED/DAMAGED(QTY-05). REPAIR OF POCKET DOZY METER 04 IN NO, RADIATION SURVEY METER 01 IN NO, DE-CONTAMINATION METER 01 IN NO REPAIR OF 05 IN NO OFF SIRS SENSORS -- SERVICE COST
SIRS 4012 A WHEEL HOUSE UNDERTAKE THE FOLLOWING ON SIRS SYSTEM CALIBRATION/ SERVIABILITY CHECKS OF RADIOACTIVE SOURCE OF SIRS. CALIBRATION/ - SERVICE COSTABILITY CHECK OF FOLLOWINGS:- (A)SIRS SYSTEM WITH SENSORS. (B)RADIATION SURVEY METER. (C) POCKET DOZIMETER. (D) CONTAMINATION MONITOR. RENEWAL OF ALL BASE MOUNT PLATES OF SIRS SENSORS IN VIEW OF CORRODED/DAMAGED(QTY-05). REPAIR OF POCKET DOZY METER 04 IN NO, RADIATION SURVEY METER 01 IN NO, DE-CONTAMINATION METER 01 IN NO REPAIR OF 05 IN NO OFF SIRS SENSORS- MATERIAL COST
STEERING SYSTEM (AIST-12-10) TILLER FLAT UNDERTAKE FOLLOWING ROUTINES OVERHAUL OF STEERING SYSTEM: - REPLACE AND CALIBRATE PRESSURE GAUGES VIEW ERRATIC READING -- SERVICE COST
STEERING SYSTEM (AIST-12-10) TILLER FLAT UNDERTAKE FOLLOWING ROUTINES OVERHAUL OF STEERING SYSTEM: - REPLACE AND CALIBRATE PRESSURE GAUGES VIEW ERRATIC READING- MATERIAL COST
DREAMZWELL TECHNICAL SERVICES PVT LTD
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .