Loading…
Loading…
Tender Value
₹3.6 Cr
EMD Value
₹3.3 L
Closing Date
4 Aug 2026, 3:00 pm
Lubrication of curves by contractor's own track based gauge face rail lubricators including its maintenance for period of five years (more than 1.25 degree) in jurisdiction of Sr.DEN(S)-ADI (Phase-II)
DRM-ADI-91-2026-27
DRM-ADI-91-2026-27
Open
Service - General
60 Months
Hamirpur, Himachal Pradesh
₹0
₹3.3 L
10 Jul 2026
10 Jul 2026
21 Jul 2026
Supply, installation and commissioning of track based rail lubricator (Electronic type) with dual applicator/wiper bar complete system as per RDSO's technical specification No. IRS-T 48 along with advanced correction slip No.1 with carry down effect of 1 Km. & Supply of solar panel and its accessories including battery and mast for successful operation of lubricator. The firm has to inspect each location regularly for operation and maintenance not less than 15 days for each curve. Power supply: Application system should be designed to accommodate both direct electrical 1 connection to an AC power source and to operate independently using a solar panel and battery as per para 7.2 of RDSO technical specification for track based lubricator. The rate includes all tools, plants, parts, labour, taxes, transportation, royalty etc complete job. The rate also includes the cost of parts and AMC for 5 years. The machine and the solar panel assembly will be the property of contractor which will be taken back by contractor after successful completion of job (i.e. after 5 years.) The rate also includes the testing of grease for its suitability as per RDSO specification (i.e. testing the grease for its coefficient of friction which should be less than 0.25p) shall be done by tenderer at a frequency of 1 month or more. (Note:- (1) if the coefficient of friction in above test is found above 0.25(Mho) then no payment for that month will be done by Railway.)
" Supply of grease for 05 years as per specification of lubricant vide RDSO technical 2 specification No. IRS-T48 along with advanced correction slip No.1 for track based lubricator (June- 2013). (Note:- if the coefficient of friction in test is found above 0.25µ then no payment for supply of grease for that month will be done" by Railway .)"
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Corri1GCC_Services_070318.pdf
ATTACHMENT
GCCforservices-Amendment2.pdf
ATTACHMENT
REVISEDGCCFORSERVICES-2018.pdf
ATTACHMENT
26finalSpecialconditionsfortrackbasedlubricatorPhase-
ATTACHMENT
2022-07-05RBA33_2022GSTinWorkContracts.pdf
ATTACHMENT
AnnexureC.pdf
ATTACHMENT
AnnexureE.pdf
ATTACHMENT
AnnexureA.pdf
ATTACHMENT
AnnexureF.pdf
ATTACHMENT
ImplementationofContractore-MeasurementBook.pdf
ATTACHMENT
AnnexureD_1.pdf
ATTACHMENT
AnnexureB.pdf
ATTACHMENT
e-BGPolicyinEPCGCCPMSPSSAGCPGMSDated16.06.2026.pdf
ATTACHMENT
1-7-26finalSpecialconditionsfortrackbasedlubricatorPhase-II4.pdf
ATTACHMENT
RailwayBoardletter_compressed.pdf
ATTACHMENT
2026-03-18-TechnicalSpecificationofTBL-SpecNo_IRST-48_compressed.pdf
ATTACHMENT
BidForm-FirstSheet.pdf
ATTACHMENT
BidForm-SecondSheet1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].