Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 71 CUNNINGHAM ROAD VASANTH NAGAR BANGALORE BANGALORE KARNATAKA 560052 | BENGALURU URBAN | KARNATAKA | 560052 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
14 Jan 2021, 11:00 amClosed
A K Singh
National Highways and Infrastructure Development Corporation Ltd. Third Floor, PTI Building, 4 Sansad Marg. New Delhi
Consultancy Services for Preparation of Inception Report and Detailed Project Report (DPR) for Development of Multi Modal Logistics Park at Silchar in the State of Assam under Bharatmala Pariyojana
2020_NHIDC_605655_1
NHIDCL/MMLP/ Silchar/Assam/2020
Open Tender
Consultancy
Item Rate
180 days
Assam
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
MD NHIDCL
Exempted
NHIDCL HQ New Delhi
18 Feb 2021
24 Dec 2020
15 Jan 2021
24 Dec 2020
14 Jan 2021
8 Jan 2021
24 Dec 2020 - 4 Jan 2021
4 Jan 2021
Amount
Remuneration for Local Staff (inclusive of per Diem allowance)
Team Leader
Logistics Park Planner
Warehousing Expert
Freight Transport Planner
Financial cum Market Analyst
Environment cum Social Expert
Rail Engineer
Road Engineer
Hydrographic Expert
Sub-Professional Staff
Assistant Logistics Park Planner
Assistant Warehousing Expert
Assistant Freight Transport Planner
Assistant Financial cum Market Analyst
Assistant Environment cum Social Expert
Assistant Rail Engineer
Assistant Road Engineer
Assistant Hydrographic Expert
Cost towards preparation of Inception Report for MMLP at Silchar, complete in all aspects.
Cost towards DPR preparation of External Road Trunk Connectivity Infrastructure for the MMLP, Complete in all aspects (Preparation of DPR for external road/s connectivity complete in all respect including incidental to the work).
Cost towards DPR preparation of External Rail Trunk Connectivity Infrastructure for the MMLP, Complete in all aspects (Preparation of DPR for external rail connectivity complete in all respect including incidental to the work).
Cost towards DPR preparation of Inland Water Transport (IWT) Terminal complete in all respect including incidental to the work.
Other Overheads (Fixed Cost)
Overheads such as Transportation cost, office rent, office supplies, communications, furniture, equipment, and other overheads incidental to the work.
Reports, Document Printing, 3D Model and Graphic video
Inception Report including proposed connectivity for external trunk infrastructure in a set containing 5 (Five) Hard Copies + 1 (One Soft Copy)
Trunk infrastructure gap assessment with draft market overview report for finalisation and approval of suitable site for MMLP in a set containing 5 (Five) Hard Copies + 1 (One Soft Copy)
Finalization of Master plan and Basic Architecture design (2D and 3D) and plans after due consultation with client and relevant stakeholders and Final Feasibility Report of MMLP and External Road and Rail Trunk Connectivity Infrastructure in a set containing 5 (five) Hard Copies + 1 (One) Soft Copy.
(i) Draft Detailed Project Report for MMLP including EIA report, EMP and Social Impact Assessment (SIA) report detailed Economic Analysis, Financial Feasibility and Project Structuring aspects etc. (ii) Draft Detailed Project Report for External Rail and Road Connectivity Infrastructure. All submissions at (i) & (ii) above shall be in a set containing 5 (Five) Hard Copies + 1 (One) soft copy.
(i) Obtaining EIA clearance, Stage 1 Forest Clearance and obtaining other final statutory clearances; (ii) 3G notification related to land acquisition as per LA Act. (iii) Obtaining final estimates for Utility shifting and requisite utilities required for Multi-Modal Logistics Park from the concerned agencies and submission to client. All submissions at (i) & (iii) above shall be in a set containing 5 (Five) Hard Copies + 1 (One) soft copy.
3D model
Simulation Graphic Video with voice over
Survey and Investigation related to land parcel of MMLP
Topograhical Survey (Fixed Rate): Topograhic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. Inclusive of cost of materials, labourer.
Topograhical Survey (Fixed Rate): Detailed topograhic survey using mobile/ aerial LiDAR or equivalent technology.
GPR for mapping utilities
Other Engineering Investigation (Fixed cost)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .