Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 701 7TH FLOOR LE MERIDIEN COMMERCIAL TOWER RAISINA ROAD NEW DELHI SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | Admitted-Finance |
| 3 | Admitted-Finance MARINE CORPORATION OF INDIA PROP ANAND SHIP CARE INSTITUTE PVT LTD 25 9 14 MARINE TOWERS RAJAVARI VEEDHI VISAKHAPATNAM | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Offer Technically Rejected |
| 5 | Rejected-Technical | Rejected-Technical Offer Technically Rejected |
Tender Value
Refer Docs
Closing Date
28 Jun 2024, 2:00 pmClosed
DEPUTY GENERAL MANGER, SRM
Ship Repair Materials Department Cochin Shipyard Limited Kochi-682015 Kerala, India
TURNKEY JOBS OF DECK MACHINERIES FOR NAVY VESSELS
2024_CSL_198735_1
CSL/SRM3/ADV073-074
Open Tender
Marine Services
Turn-key
180 days
Cochin
Please refer the tender documents
2 documents required · 2 mandatory
₹0
Exempted
29 Jul 2024
19 Jun 2024
29 Jun 2024
19 Jun 2024
28 Jun 2024
19 Jun 2024
19 Jun 2024 - 27 Jun 2024
Amount
Scope 1 - Turnkey Job of Deck Machineries - (RM.0788)
FWD HYDRAULIC CAPSTAN FOXLE UNDERTAKE MAJOR OVERHAUL OF FWD CAPSTAN AS FOLLOWS
(I) REPLACE FRICTION BAND AND BRAKE. (01 NO) (II) REFIT AUTO BRAKE PISTON. (01 NO) (III) REFIT BRAKE HAND WHEEL ASSEMBLY. (01 NO) (IV) REPLACE THE PRESSURE GAUGE (04 NO) (V) RENEW THE HYDRAULIC PUMP SEAL. (01 SET) (VI) CARRY OUT OVERHAUL OF HYDRAULIC CAPSTAN DRUM AND DRIVE MOTOR. REPLACE BEARING, SEALS, CONSUMABLES, ALL WORN OUT PARTS. RENEW HYDRAULIC OIL. (01 JOB) (VII) REPLACE OF RELIEF VALVE. (02 NO) (VIII) CARRY OUT OVERHAUL OF HAND PUMP ASSEMBLY. (01 JOB) (IX) REPLACE SOLENOID VALVES (04 NO) (X) RENEW CABLE HOLDER DUE TO WEAR AND CORROSION. (01 JOB) (XI) REFURBISH GEAR ASSEMBLY VIEW ABNORMAL NOISE OBSERVED (01 JOB) (XII) REPLACE RESERVOIR TANK AND OFFER PT (01 NO) (XIII) RENEW FOUNDATION (01 NO) (XIV) REPLACE DIRECTION CONTROL VALVES (TWO AND FOUR WAY) (20 NO) (XV) UNDERTAKE COMPLETE REFURBISHMENT OF FWD CAPSTAN CONTROLLER AS MATERIAL CONDITION IS DETERIORATED DUE TO EXPOSURE TO OPEN SEA. RENEW ALL COMPONENTS AND INTERNAL WIRING. (01 JOB) (XVI) CARRY OUT STW AND OFFER TRIALS TO HITU/SS (Service Cost)
UNDERTAKE MAJOR OVERHAUL OF FWD CAPSTAN AS FOLLOWS: - (I) REPLACE FRICTION BAND AND BRAKE. (01 NO) (II) REFIT AUTO BRAKE PISTON. (01 NO) (III) REFIT BRAKE HAND WHEEL ASSEMBLY. (01 NO) (IV) REPLACE THE PRESSURE GAUGE (04 NO) (V) RENEW THE HYDRAULIC PUMP SEAL. (01 SET) (VI) CARRY OUT OVERHAUL OF HYDRAULIC CAPSTAN DRUM AND DRIVE MOTOR. REPLACE BEARING, SEALS, CONSUMABLES, ALL WORN OUT PARTS. RENEW HYDRAULIC OIL. (01 JOB) (VII) REPLACE OF RELIEF VALVE. (02 NO) (VIII) CARRY OUT OVERHAUL OF HAND PUMP ASSEMBLY. (01 JOB) (IX) REPLACE SOLENOID VALVES (04 NO) (X) RENEW CABLE HOLDER DUE TO WEAR AND CORROSION. (01 JOB) (XI) REFURBISH GEAR ASSEMBLY VIEW ABNORMAL NOISE OBSERVED (01 JOB) (XII) REPLACE RESERVOIR TANK AND OFFER PT (01 NO) (XIII) RENEW FOUNDATION (01 NO) (XIV) REPLACE DIRECTION CONTROL VALVES (TWO AND FOUR WAY) (20 NO) (XV) UNDERTAKE COMPLETE REFURBISHMENT OF FWD CAPSTAN CONTROLLER AS MATERIAL CONDITION IS DETERIORATED DUE TO EXPOSURE TO OPEN SEA. RENEW ALL COMPONENTS AND INTERNAL WIRING. (01 JOB) (XVI) CARRY OUT STW AND OFFER TRIALS TO HITU/SS (Material Cost)
ANCHOR CHAIN CABLE AND LOCKERS - BOSUN STORE
(A)-SURVEY OF ANCHOR CHAIN CABLES POST HYDRO JET BLAST CLEANING IS REQUIRED TO BE UNDERTAKEN IAW NO 02/21 (B)-AREA ALONGSIDE SHIP REQUIRED FOR CONDUCTING SURVEY POST HYDROBLASTING, BLACK SMITH AND LIFTING ASSISTANCE FOR FITMENT OF ACCESSORIES/ ASSOCIATED FITTINGS (SHACKLES, PINS ETC) AND PAINTING OF CHAIN CABLE. (C)-BER CHAIN CABLES AND ACCESSORIES TO BE HANDED OVER TO SS FOR SURVEY AND DEMAND. LAY OUT ALL CABLES. SURVEY CABLES AND SHACKLES (AN EXPERIENCED DOCKYARD BLACKSMITH IS TO ASSIST AT THIS SURVEY). BREAK, CLEAN AND GREASE ALL JOINING SHACKLES. STRIP AND GREASE SLIP IN CABLE LOCKERS. RE-ARRANGE CABLE LENGTH TO ENSURE EQUALITY OF WEAR. REMARK CABLE LENGTHS. MOVE AND LUBRICATE ANCHOR FLUKES. EXAMINE ASSOCIATED HULL FITTINGS. CLEAN AND COAT WITH BOILED LINSEED OIL. NOTE: THE MACHINED SURFACES OF THE JOINTS OF LUGLESS SHACKLES ARE TO BE EXAMINED FOR CORROSION AND ALL SUCH SHACKLES TO BE STRIPPED, GREASED AND RE-ASSEMBLED BY SHIP STAFF. GREASE TO BE USED: LG-280. PATT.NO. 0474/910-0502. (Service Cost)
(A)-SURVEY OF ANCHOR CHAIN CABLES POST HYDRO JET BLAST CLEANING IS REQUIRED TO BE UNDERTAKEN IAW NO 02/21 (B)-AREA ALONGSIDE SHIP REQUIRED FOR CONDUCTING SURVEY POST HYDROBLASTING, BLACK SMITH AND LIFTING ASSISTANCE FOR FITMENT OF ACCESSORIES/ ASSOCIATED FITTINGS (SHACKLES, PINS ETC) AND PAINTING OF CHAIN CABLE. (C)-BER CHAIN CABLES AND ACCESSORIES TO BE HANDED OVER TO SS FOR SURVEY AND DEMAND. LAY OUT ALL CABLES. SURVEY CABLES AND SHACKLES (AN EXPERIENCED DOCKYARD BLACKSMITH IS TO ASSIST AT THIS SURVEY). BREAK, CLEAN AND GREASE ALL JOINING SHACKLES. STRIP AND GREASE SLIP IN CABLE LOCKERS. RE-ARRANGE CABLE LENGTH TO ENSURE EQUALITY OF WEAR. REMARK CABLE LENGTHS. MOVE AND LUBRICATE ANCHOR FLUKES. EXAMINE ASSOCIATED HULL FITTINGS. CLEAN AND COAT WITH BOILED LINSEED OIL. NOTE: THE MACHINED SURFACES OF THE JOINTS OF LUGLESS SHACKLES ARE TO BE EXAMINED FOR CORROSION AND ALL SUCH SHACKLES TO BE STRIPPED, GREASED AND RE-ASSEMBLED BY SHIP STAFF. GREASE TO BE USED: LG-280. PATT.NO. 0474/910-0502. (Material Cost)
SURVEY S.W HAWSERS AND ASSOCIATED FITTINGS. TEST S.W HAWESERS. (Service Cost)
SURVEY S.W HAWSERS AND ASSOCIATED FITTINGS. TEST S.W HAWESERS. (Material Cost)
LIFE RAFT - VARIOUS PLACES
LAND ALL LIFERAFTS AND SURVIVAL PACKS COMPLETE WITH GRP CONTAINERS AND REPLACEMENT (NOT TO EXCEED 13 MONTHS). (20 MEN LIFERAFTS, TOTAL ALLOCATION 06 LIFERAFTS) (Service Cost)
LAND ALL LIFERAFTS AND SURVIVAL PACKS COMPLETE WITH GRP CONTAINERS AND REPLACEMENT (NOT TO EXCEED 13 MONTHS). (20 MEN LIFERAFTS, TOTAL ALLOCATION 06 LIFERAFTS) (Material Cost)
TEST HYDROSTATIC RELEASE UNITS. (Service Cost)
TEST HYDROSTATIC RELEASE UNITS. (Material Cost)
THREE ROLLER FAIRLEAD
REPLACEMENT/ FITMENT OF THREE ROLLER FAIRLEAD AS PART OF CHANGE MANAGEMENT POLICY I.A.W IHQ MoD(N)/ POLICY /H-135. (Service Cost)
REPLACEMENT/ FITMENT OF THREE ROLLER FAIRLEAD AS PART OF CHANGE MANAGEMENT POLICY I.A.W IHQ MoD(N)/ POLICY /H-135. (Material Cost)
MOORING /WARPING CAPSTAN
OVERHAULING AND DEFECT RECTIFICATION OF MOORING /WARPING CAPSTAN AT AFT (ELECTROMECHANICAL CAPSTAN) (Service Cost)
OVERHAULING AND DEFECT RECTIFICATION OF MOORING /WARPING CAPSTAN AT AFT (ELECTROMECHANICAL CAPSTAN) (Material Cost)
SINGLE ARM MANUALLY OPERATED DAVIT
SURVEY AND REPAIR OF SINGLE ARM MANUALLY OPERATED , DECK FITTED DAVIT. (SIMPLE DAVIT, NOT MECHANISED, ONLY A BEND PIPE OF DIA- 65MM WITH A HOOK, LOAD TEST 500KG STATIC) (Service Cost)
SURVEY AND REPAIR OF SINGLE ARM MANUALLY OPERATED , DECK FITTED DAVIT. (SIMPLE DAVIT, NOT MECHANISED, ONLY A BEND PIPE OF DIA- 65MM WITH A HOOK, LOAD TEST 500KG STATIC) (Material Cost)
AFT CAPSTAN - QTR. DECK
UNDERTAKE COMPLETE REFURBISHMENT OF AFT CAPSTAN STARTER. RENEW ALL COMPONENTS AND INTERNAL WIRING. (Service Cost)
UNDERTAKE COMPLETE REFURBISHMENT OF AFT CAPSTAN STARTER. RENEW ALL COMPONENTS AND INTERNAL WIRING. (Material Cost)
Scope 2 - Turnkey Job of Deck Machineries - (RM.0789)
FWD HYDRAULIC CAPSTAN FOXLE UNDERTAKE MAJOR OVERHAUL OF FWD CAPSTAN AS FOLLOWS: -
(I) REPLACE FRICTION BAND AND BRAKE. (01 NO) (II) REFIT AUTO BRAKE PISTON. (01 NO) (III) REFIT BRAKE HAND WHEEL ASSEMBLY. (01 NO) (IV) REPLACE THE PRESSURE GAUGE (04 NO) (V) RENEW THE HYDRAULIC PUMP SEAL. (01 SET) (VI) CARRY OUT OVERHAUL OF HYDRAULIC CAPSTAN DRUM AND DRIVE MOTOR. REPLACE BEARING, SEALS, CONSUMABLES, ALL WORN OUT PARTS. RENEW HYDRAULIC OIL. (01 JOB) (VII) REPLACE OF RELIEF VALVE. (02 NO) (VIII) CARRY OUT OVERHAUL OF HAND PUMP ASSEMBLY. (01 JOB) (IX) REPLACE SOLENOID VALVES (04 NO) (X) RENEW CABLE HOLDER DUE TO WEAR AND CORROSION. (01 JOB) (XI) REFURBISH GEAR ASSEMBLY VIEW ABNORMAL NOISE OBSERVED (01 JOB) (XII) REPLACE RESERVOIR TANK AND OFFER PT (01 NO) (XIII) RENEW FOUNDATION (01 NO) (XIV) REPLACE DIRECTION CONTROL VALVES (TWO AND FOUR WAY) (20 NO) (XV) UNDERTAKE COMPLETE REFURBISHMENT OF FWD CAPSTAN CONTROLLER AS MATERIAL CONDITION IS DETERIORATED DUE TO EXPOSURE TO OPEN SEA. RENEW ALL COMPONENTS AND INTERNAL WIRING. (01 JOB) (XVI) CARRY OUT STW AND OFFER TRIALS TO HITU/SS (Service Cost)
(I) REPLACE FRICTION BAND AND BRAKE. (01 NO) (II) REFIT AUTO BRAKE PISTON. (01 NO) (III) REFIT BRAKE HAND WHEEL ASSEMBLY. (01 NO) (IV) REPLACE THE PRESSURE GAUGE (04 NO) (V) RENEW THE HYDRAULIC PUMP SEAL. (01 SET) (VI) CARRY OUT OVERHAUL OF HYDRAULIC CAPSTAN DRUM AND DRIVE MOTOR. REPLACE BEARING, SEALS, CONSUMABLES, ALL WORN OUT PARTS. RENEW HYDRAULIC OIL. (01 JOB) (VII) REPLACE OF RELIEF VALVE. (02 NO) (VIII) CARRY OUT OVERHAUL OF HAND PUMP ASSEMBLY. (01 JOB) (IX) REPLACE SOLENOID VALVES (04 NO) (X) RENEW CABLE HOLDER DUE TO WEAR AND CORROSION. (01 JOB) (XI) REFURBISH GEAR ASSEMBLY VIEW ABNORMAL NOISE OBSERVED (01 JOB) (XII) REPLACE RESERVOIR TANK AND OFFER PT (01 NO) (XIII) RENEW FOUNDATION (01 NO) (XIV) REPLACE DIRECTION CONTROL VALVES (TWO AND FOUR WAY) (20 NO) (XV) UNDERTAKE COMPLETE REFURBISHMENT OF FWD CAPSTAN CONTROLLER AS MATERIAL CONDITION IS DETERIORATED DUE TO EXPOSURE TO OPEN SEA. RENEW ALL COMPONENTS AND INTERNAL WIRING. (01 JOB) (XVI) CARRY OUT STW AND OFFER TRIALS TO HITU/SS (Material Cost)
ANCHOR CHAIN CABLE AND LOCKERS - BOSUN STORE
(A)-SURVEY OF ANCHOR CHAIN CABLES POST HYDRO JET BLAST CLEANING IS REQUIRED TO BE UNDERTAKEN IAW NO 02/21 (B)-AREA ALONGSIDE SHIP REQUIRED FOR CONDUCTING SURVEY POST HYDROBLASTING, BLACK SMITH AND LIFTING ASSISTANCE FOR FITMENT OF ACCESSORIES/ ASSOCIATED FITTINGS (SHACKLES, PINS ETC) AND PAINTING OF CHAIN CABLE. (C)-BER CHAIN CABLES AND ACCESSORIES TO BE HANDED OVER TO SS FOR SURVEY AND DEMAND. LAY OUT ALL CABLES. SURVEY CABLES AND SHACKLES (AN EXPERIENCED DOCKYARD BLACKSMITH IS TO ASSIST AT THIS SURVEY). BREAK, CLEAN AND GREASE ALL JOINING SHACKLES. STRIP AND GREASE SLIP IN CABLE LOCKERS. RE-ARRANGE CABLE LENGTH TO ENSURE EQUALITY OF WEAR. REMARK CABLE LENGTHS. MOVE AND LUBRICATE ANCHOR FLUKES. EXAMINE ASSOCIATED HULL FITTINGS. CLEAN AND COAT WITH BOILED LINSEED OIL. NOTE: THE MACHINED SURFACES OF THE JOINTS OF LUGLESS SHACKLES ARE TO BE EXAMINED FOR CORROSION AND ALL SUCH SHACKLES TO BE STRIPPED, GREASED AND RE-ASSEMBLED BY SHIP STAFF. GREASE TO BE USED: LG-280. PATT.NO. 0474/910-0502. (Service Cost)
(A)-SURVEY OF ANCHOR CHAIN CABLES POST HYDRO JET BLAST CLEANING IS REQUIRED TO BE UNDERTAKEN IAW NO 02/21 (B)-AREA ALONGSIDE SHIP REQUIRED FOR CONDUCTING SURVEY POST HYDROBLASTING, BLACK SMITH AND LIFTING ASSISTANCE FOR FITMENT OF ACCESSORIES/ ASSOCIATED FITTINGS (SHACKLES, PINS ETC) AND PAINTING OF CHAIN CABLE. (C)-BER CHAIN CABLES AND ACCESSORIES TO BE HANDED OVER TO SS FOR SURVEY AND DEMAND. LAY OUT ALL CABLES. SURVEY CABLES AND SHACKLES (AN EXPERIENCED DOCKYARD BLACKSMITH IS TO ASSIST AT THIS SURVEY). BREAK, CLEAN AND GREASE ALL JOINING SHACKLES. STRIP AND GREASE SLIP IN CABLE LOCKERS. RE-ARRANGE CABLE LENGTH TO ENSURE EQUALITY OF WEAR. REMARK CABLE LENGTHS. MOVE AND LUBRICATE ANCHOR FLUKES. EXAMINE ASSOCIATED HULL FITTINGS. CLEAN AND COAT WITH BOILED LINSEED OIL. NOTE: THE MACHINED SURFACES OF THE JOINTS OF LUGLESS SHACKLES ARE TO BE EXAMINED FOR CORROSION AND ALL SUCH SHACKLES TO BE STRIPPED, GREASED AND RE-ASSEMBLED BY SHIP STAFF. GREASE TO BE USED: LG-280. PATT.NO. 0474/910-0502. (Material Cost)
SURVEY S.W HAWSERS AND ASSOCIATED FITTINGS. TEST S.W HAWESERS. (Service Cost)
SURVEY S.W HAWSERS AND ASSOCIATED FITTINGS. TEST S.W HAWESERS. (Material Cost)
LIFE RAFT - VARIOUS PLACES
LAND ALL LIFERAFTS AND SURVIVAL PACKS COMPLETE WITH GRP CONTAINERS AND REPLACEMENT (NOT TO EXCEED 13 MONTHS). (20 MEN LIFERAFTS, TOTAL ALLOCATION 06) (Service Cost)
LAND ALL LIFERAFTS AND SURVIVAL PACKS COMPLETE WITH GRP CONTAINERS AND REPLACEMENT (NOT TO EXCEED 13 MONTHS). (20 MEN LIFERAFTS, TOTAL ALLOCATION 06) (Material Cost)
TEST HYDROSTATIC RELEASE UNITS. (Service Cost)
TEST HYDROSTATIC RELEASE UNITS. (Material Cost)
THREE ROLLER FAIRLEAD
REPLACEMENT/ FITMENT OF THREE ROLLER FAIRLEAD AS PART OF CHANGE MANAGEMENT POLICY I.A.W IHQ MoD(N)/ POLICY /H-135. (Service Cost)
REPLACEMENT/ FITMENT OF THREE ROLLER FAIRLEAD AS PART OF CHANGE MANAGEMENT POLICY I.A.W IHQ MoD(N)/ POLICY /H-135. MATERIAL (Material Cost)
MOORING /WARPING CAPSTAN
OVERHAULING AND DEFECT RECTIFICATION OF MOORING /WARPING CAPSTAN AT AFT (ELECTROMECHANICAL CAPSTAN) (Service Cost)
OVERHAULING AND DEFECT RECTIFICATION OF MOORING /WARPING CAPSTAN AT AFT (ELECTROMECHANICAL CAPSTAN) (Material Cost)
SINGLE ARM MANUALLY OPERATED DAVIT
SURVEY AND REPAIR OF SINGLE ARM MANUALLY OPERATED , DECK FITTED DAVIT (SIMPLE DAVIT, NOT MECHANISED, ONLY A BEND PIPE OF DIA- 65MM WITH A HOOK, LOAD TEST 500KG STATIC). (Service Cost)
SURVEY AND REPAIR OF SINGLE ARM MANUALLY OPERATED , DECK FITTED DAVIT (SIMPLE DAVIT, NOT MECHANISED, ONLY A BEND PIPE OF DIA- 65MM WITH A HOOK, LOAD TEST 500KG STATIC). (Material Cost)
AFT CAPSTAN - QTR. DECK
AFT CAPSTAN QTR. DECK UNDERTAKE COMPLETE REFURBISHMENT OF AFT CAPSTAN STARTER. RENEW ALL COMPONENTS AND INTERNAL WIRING. (Service Cost)
AFT CAPSTAN QTR. DECK UNDERTAKE COMPLETE REFURBISHMENT OF AFT CAPSTAN STARTER. RENEW ALL COMPONENTS AND INTERNAL WIRING. (Material Cost)
Marine Corporation of India, Prop Anand Ship Care Institute Pvt Ltd
GEARS & WHEELS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .