Tender Value
₹3.3 Cr
EMD Value
₹3.3 L
Closing Date
4 Nov 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CCE, ABP, SALAPADA
O/o the CCE, ABP, SALAPADA
Construction of Inspection Bungalow G1 at Barrage Colony Salapada under Anandapur Barrage Project in the district of Kendujhar
2026_CCEAB_143580_1
CCEABP-08 OF 2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
CCE, ABP, SALAPADA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹3.3 L
Yes
15 Oct 2026
15 Oct 2026
5 Nov 2026
15 Oct 2026
4 Nov 2026
15 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing roads and land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. including cost of labour, cess, conveyance, loading, unloading, T&P, & all taxes etc, all complete as per the direction of Engineer-in-Charge.Ground floor | 1,475.41 | Sqm | 8.6 | ₹12,688.53 |
| 2 | Dismantling brick or stone masonry in lime or cement mortar above 3mtr height including stacking the useful materials for reuse and removing the debris within 50m lead usefulness of the dismantled materials will be dicided after dismantaling including cost of labour, cess, conveyance, loading, unloading, T&P, & all taxes etc, all complete as per the direction of Engineer-in-Charge.Ground floor | 134.03 | Cum | 1,646.6 | ₹2,20,693.8 |
| 3 | Dismantling G.C.I. /A.C sheet roofing dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres Usefulness of dismentaled materials will be decided after dismantaling including cost of labour, cess, conveyance, loading, unloading, T&P, & all taxes etc, all complete as per the direction of Engineer-in-Charge. Ground floor | 372 | Sqm | 102.6 | ₹38,167.2 |
| 4 | Dismantling 2.5cm thick artificial stone flooring (1:2:4) with washed grave disposal will be made at suitable location l including punning including cost of labour, cess, conveyance, loading, unloading, T&P, & all taxes etc, all complete as per the direction of Engineer-in-Charge.Ground floor | 296.94 | sqm | 117.9 | ₹35,009.23 |
| 5 | Dismantling and removing doors, windows and ventilators disposal will be made at suitable location including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m lead including cost of labour, conveyance, loading, unloading, T&P, etc, all complete as per the direction of Engineer-in-Charge. Ground floor | 6.3 | sqm | 465.1 | ₹2,930.13 |
| 6 | Earthwork excavation in hard or grevelly soil in foundation for Ground floor, boundary wall & security room with all lead and lift including rough dressing and breaking clods and laying in layers and depositing the excavated materials away from work site including cost, carriage & taxes of all materials, labours, cess and T&P etc. required with all leads, lifts & delifts to complete in all respect as per drawings, specification and direction of Engineer-in-Charge. | 408.91 | Cum | 210.5 | ₹86,075.56 |
| 7 | Filling the Foundation and Plinth, Sides of Foundation, etc. with excavated materials (excluding rock), in layers not exceeding 0.225 m in depth including cost of watering, ramming, dressing and levelling the top to proper level & gradient including cost of all materials, carriage, royalty, EMF, DMF, additional charges and other statutary charges as applicable, labours, cess, with all leads, lifts & delifts, loading, unloading and T&P & all taxes etc to complete in all respect as per drawings, specification and direction of Engineer-in-Charge. | 334.52 | Cum | 117 | ₹39,139.19 |
| 8Supplying, diluting and preparing chemical emulsion like Imidacloprid 30.5 % SC or other chemicals approved by Central Insecticides Board or as directed by the manufacturer and spraying the mixture uniformly by sprayer as Pre-Constructional Anti-termite Treatment confirming to IS 6313 (Part-II) and creating a chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of walls and floors along with external perimeter of the building, expansion joints, surrounding the pipes and conduits etc. at the rate of 7.5 liters per sqm on vertical surface and 5.0 liters per sqm on horizontal surfaces, 50% of the emulsion to be filled in the holes made in trenches at 150mm center to center (or as directed by the manufacturer) including cost of all materials, carriage, labours, cess, with all leads, lifts & delifts, loading, unloading and T&P & all taxes etc to complete in all respect as per drawings, specification and direction of Engineer-in-Charge. ( The payment shall be made on the basis of actual plinth area of the building at ground floor and vertical faces will not be measured for payment). Note- The contractor shall have to furnish Ten (10) years guarantees to maintain the anti-termite treated area / structure free from termite. In addition to the 10 years guarantee furnished as above, the contractor shall have to furnish ten years (after certificate of final completion) Bank Guarantee Bond issued by any Nationalized Bank executed in favour of the client as directed in the prescribed proforma available in the tender document for an amount of 10% (ten percent) of cost of this item of work. | |||||
| 8.1 | Grond floor | 1,216.95 | Sqm | 104.5 | ₹1,27,171.28 |
| 9 | Supplying and Filling with Sand in Foundation and Plinth in layers not exceeding 20 cm in depth, well watered and compact , top surface dressed and levelled to proper level and gradientincluding cost of all materials, carriage, royalty,EMF, DMF, additional charges and other statutary charges as applicable, labours, cess, with all leads, lifts & delifts, loading, unloading and T&P & all taxes etc to complete in all respect as per drawings, specification and direction of Engineer-in-Charge. | 150.99 | Cum | 513.4 | ₹77,518.27 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_614099.xls
BOQ • 1.17 MB
DTCN.pdf
Tender Documents • 1.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .