| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.7 L+₹9,979.45 (0.64%)Rejected-AOC E 12 12 EKTP PHASE IV KOLKATA 700107 | KOLKATA | KOLKATA | WEST BENGAL | 700107 | L2 | Rejected-AOC L2 | |
| 3 | L3₹16.6 L+₹1.0 L (6.67%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹19.3 L+₹3.7 L (23.9%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical separate sheet enclosed |
Tender Value
₹17.3 L
EMD Value
₹17,300
Closing Date
21 Dec 2021, 3:00 pmClosed
Chief Engineer O and M II
Office of the Chief Engineer TR(OandM) West Bengal State Electricity Transmission Company Limited, 10th Floor, Block_D,Vidyut Bhavan, Block_DJ,Sector_II, Bidhannagar, Kolkata 700 091
Repairing and maintenance of existing Boundary Wall at Uluberia 132 KV Substation premises, WBSETCL, Dist-Howrah.
2021_SETCL_353406_1
CE(OM)II/ULU/21-22/11,26.11.21
Open Tender
Miscellaneous Services
Percentage
90 days
WBSETCL, Vidyut Bhavan, Salt Lake, Kolkata
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,360
WBSETCL
₹17,300
WBSETCL,Vidyut Bhavan, Salt Lake, Kolkata
20 Oct 2022
29 Nov 2021
23 Dec 2021
29 Nov 2021
21 Dec 2021
10 Dec 2021
29 Nov 2021 - 6 Dec 2021
8 Dec 2021
132 KV SUB-STATION
A.S.R CONSTRUCTION
M. R. ENTERPRISE
BIDHAN MAJUMDAR
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .