Tender Value
Refer Docs
EMD Value
₹7.9 L
Closing Date
5 Dec 2019, 10:00 amClosed
ASD
NAVAL DOCKYARD VISAKHAPATNAM
NR OF SB-V
2019_NAVY_297331_1
COM/0336/SB V/NR O/L-20A
Open Tender
Marine Services
Turn-key
150 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹7.9 L
Yes
NAVAL DOCKYARD VISAKHAPATNAM
24 Jan 2020
13 Nov 2019
6 Dec 2019
13 Nov 2019
5 Dec 2019
25 Nov 2019
13 Nov 2019 - 5 Dec 2019
20 Nov 2019
WORK PAKAGE FOR NR SB-V HULL DEFECT LIST 001 Docking Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e ND(V) Slipway/Drydock). Note 2:- Last docked in Version I on 22 Aug B1542017
002 Cleaning of Under Water Hull and Boot Top Area HP jet cleaning of entire under water area and boot top area (with a pressure not exceeding 3000 PSI) remove the marine growth/barnacles and prepare for survey. Note:- (i) U/W area: 425 Sqm including boot top
003 Cleaning of Internal Compartments - Sullage tanks(06 Nos) Manually clean fuel tanks free of accumulated fuel and residual muck and present for survey.
004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey. (a) Cable locker
004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey. (b) Forepeak tank
004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey:- (c) Cofferdam 1
004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey:- (d) Cofferdam 2
004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey:- (e) Cofferdam 3
004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated water and residual muck and present for survey:- (f) Cofferdam 4
004 Cleaning of Internal Compartments Manually clean following internal compartments free of accumulated oily water and grime/muck and present for survey:- (g) PUMP Room (Bilges: 120 Sqm, Bulkheads:140 Sqm)
004 Cleaning of Internal Compartments - ASP Manually clean following internal compartments free of accumulated oily water and grime/muck and present for survey:- (h) Steering gear room (Bilges: 24 Sqm, Bulkheads:76 Sqm)
05 Cleaning of Void spaces (06 Nos) Manually clean 06 Nos void spaces of all residues and present for survey. Note: Cleaning to be done with detergent water, oil absorbing/removing solution or powder, rags, cotton jute etc. Quote to include cost of cleaning material also.
006 Hull Survey - Visual survey External and Internal Structures Carry out visual and hammer survey in accordance with NO 01/15 of under water hull , boot top area, above water hull, super structure, weather decks and all internal compartments(i.e. FW tanks, ballast tanks, fore peak tank, engine room, steering compartment, FO tanks, cofferdams, all stiffeners and deck fittings etc.) All manholes to be inspected for water tightness, chalk impression test to be carried out. Note:- (i) LS for survey (ii)Firm to submit 07 copies of hull survey report .
007 Hull Survey - UTG Survey External and Internal Structures Carry out UTG survey in accordance with NO 01/15 of under water hull , boot top area, above water hull, super structure, weather decks and all internal compartments(i.e. FW tanks, ballast tanks, fore peak tank, engine room, steering compartment, FO tanks, cofferdams, all stiffeners and deck fittings etc.) All manholes to be inspected for water tightness, chalk impression test to be carried out. Note:- (i) LS for survey (ii) Firm to submit 07 copies of hull survey report . (iii) Quote for UTG survey points
008 Steel renewal Quote for steel renewal at various locations as per survey report Note :- Quoted repair cost shall include cost of both sides blasted and primed IS 2062 Grade `B’ quality steel. Degutting/ regutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal was undertaken etc.
009 Build ups (a) Carry out build ups as indicated by the Hull survey team/ Surveyor Size 25 x 25 mm
009 Build ups (b) Carry out build ups as indicated by the Hull survey team/ Surveyor Size 50 x 50 mm
010 Fairing of deformed structure Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor
011 Re-welding Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.
012 Draft marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric.
013 Sacrificial anodes (a) Renew Sacrificial anodes those consumed more than 50% Type: MK-I Note:- Anodes will be supplied by Navy/COY.
013 Sacrificial anodes (b) Renew Sacrificial anodes those consumed more than 50% Type: MK-VI Note:- Anodes will be supplied by Navy/COY.
014 Surface Preparation Under Water area Surface preparation to SA 2.5 std using grit blasting on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application. (areas include 'C' channel for rubber fenders)
015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - Penguard primer -50 microns
015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
015 Painting Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns
015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns
015 Painting Under Water Area - JOTUN Scheme. Paint under water area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns
016 Surface Preparation Boot Top area Surface preaparation to SA 2.5 standards using grit blasting on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application. (areas include 'C' channel for rubber fenders)
017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT
017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns DFT
017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns DFT
017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns DFT
017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns DFT
017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns DFT
017 Painting Boot Top Area - JOTUN Scheme. Paint boot top area with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra (Black) - 150 microns DFT
018 Surface prepartion Above Water Area and Bulwark including guardrails Carry out mechanical cleaning to ST3 standard for paint application as per survey report by Paint OEM rep
019 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (a) 1st Coat: Penguard primer - 50 microns DFT
019 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Jotamastic 80 (Grey/ Red Brown) - 125 microns DFT
019 Painting- Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Jotamastic 80 (Grey/ Red Brown) - 125 microns DFT
019 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
020 Surface prepartion Super Structure and Deck Fittings Carry out mechanical cleaning to ST3 standard as per survey report of Paint OEM for paint application.
021 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT
021 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Jotamastic 80( Red ) - 125 microns DFT
021 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (c)3rd Coat: Jotamastic 80(Grey) - 125 microns DFT
021 Painting Super Structure and Deck Fittings - JOTUN Scheme. Paint superstructure area with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (d) 4th Coat: Hard Top XP GREY 7040- 60 microns DFT
022 Surface prepartion Weather Decks Carry out hydro-jet blasting of entire weather deck, bridge deck and flag deck to SA 2.5 standards.
023 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT
023 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 - 150 microns DFT
023 Painting Paint weather decks - JOTUN Scheme. Paint weather decks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota armour -800 microns DFT
024 Surface prepartion Internal Compartments - Fore Peak Tank, Cable locker and Cofferdam Carry out mechanical cleaning to ST 3 standard as per survey report of Paint OEM for fore peak tank , cable locker and cofferdam (04).
025 Painting Fore peak tanks, ballast tanks and cable locker - JOTUN Scheme. Paint fore peak tanks,ballast tanks and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a)1st Coat: primer - Penguard primer -50 microns DFT
025 Painting Fore peak tanks, ballast tanks and cable locker - JOTUN Scheme. Paint fore peak tanks,ballast tanks and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Anticorrosive - Balloxy HB light (Bieze) - 150 microns
025 Painting Fore peak tanks, ballast tanks and cable locker - JOTUN Scheme. Paint fore peak tanks,ballast tanks and cable locker with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Anticorrosive - Balloxy HB light (Grey) - 150 microns
026 Surface prepartion Internal Compartments - Pump Room and ASP Compartment including bilges Carry out mechanical cleaning to ST 3 standard as survey report of Paint OEM for paint application. (i) Pump room ( Bilges-120 sqm, bulkheads-140) (ii) ASP ( Bilges-24 sqm, bulkheads-76)
027 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT
027 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive - Jotacote Universal (Aluminium) - 150 microns
027 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive - Jotacote Universal (Grey) - 150 microns
027 Painting Machinery Bilges - JOTUN Scheme. Paint bilges of Pump room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Penguard Top Coat - 50 microns.
028 Painting Bulkheads of Pump room and ASP - Jotun Scheme. Paint bulkheads and deckheads of PUMP room and ASP compartments with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer -50 microns DFT
028 Painting Bulkheads of Pump room and ASP - Jotun Scheme. Paint bulkheads and deckheads of PUMP room and ASP compartments with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Interior fire retardent paint-100 microns
028 Painting Bulkheads of Pump room and ASP - Jotun Scheme. Paint bulkheads and deckheads of PUMP room and ASP compartments with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Interior fire retardent paint-100 micron
029 Cleaing of RU Tanks Cleaning of Fuel Oil RU TanksManually scrap and clean to bare metal and apply two coats of OM 750 oil in following tanks: Fuel Oil RU Tanks (02nos) Note:- Quoted cost shall be inclusive of cost of oil also.
030 Surafce prepartion Bulkheads, decks and dadoes of Internal compartments Carry out mechanical cleaning of all stores ( naval stores,battery stores, CO2 room, paint stores,pump store,deck store and eletrical control room) to ST 3 standard as survey report of Paint OEM for paint application.
031 Painting Internal compartments decks and dadoes- Jotun Scheme. Carry out painting of internal compartments decks and dadoes at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (a) 1st Coat: primer - penguard 1x50 microns
031 Painting Internal compartments decks and dadoes- Jotun Scheme. Carry out painting of internal compartments decks and dadoes at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (b) 2nd coat : Jotamastic 80 grey -1 x 150 microns
031 Painting Internal compartments decks and dadoes- Jotun Scheme. Carry out painting of internal compartments decks and dadoes at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (c) 3rd coat ; Burnswick green finishing paint-100 microns
032 Painting Internal compartments bulkheads - Jotun Scheme. Carry out painting of internal compartments Bulkheads and deck heads area at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. (a) 1st Coat: primer - penguard 1x50 microns
032 Painting Internal compartments bulkheads - Jotun Scheme. Carry out painting of internal compartments Bulkheads and deck heads area at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b)1st Coat: Interior fire retardent paint-100 microns
032 Painting Internal compartments bulkheads - Jotun Scheme. Carry out painting of internal compartments Bulkheads and deck heads area at following locations:- Naval store, battery store, CO2 room, paint store, pump store, deck store and eletrical control room. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 2nd Coat: Interior fire retardent paint-100 microns
033 Surface preaprtion Void spaces Carry out surface preaprtion to ST 3 standards of VOID Spaces as survey report of Paint OEM for paint application.
034 Painting Void spaces - Jotun Scheme. Carry out painting of 06 void spaces with following paint scheme (a) 1st coat- penguard primer- 50 microns
034 Painting Void spaces - Jotun Scheme. Carry out painting of 06 void spaces with following paint scheme (b) 2nd coat coat-Jotacoat universal (Al)- 150 MICRONS
034 Painting Void spaces - Jotun Scheme. Carry out painting of 06 void spaces with following paint scheme (c) 2nd coat coat-Jotacoat universal (GREY)- 150 MICRONS
034 Painting Void spaces - Jotun Scheme. Carry out painting of 06 void spaces with following paint scheme (d) 3rd coat t-Penguard top coat- 50 MICRONS
035 Surface preaprtion Sullage Tanks Carry out surface preaprtion to ST 3 standards of all sullage tanks/fuel tanks as survey report of Paint OEM for paint application.
036 Painting Sullage Tanks - Jotun paint scheme Paint all sullage tanks with following paint scheme:- (a) Tankguard HB light grey - 150 microns
036 Painting Sullage Tanks - Jotun paint scheme Paint all sullage tanks with following paint scheme:- (b) Tankguard HB greyish green - 150 microns
037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors, chain cables and accessories, laying out for cleaning, painting and refitment. (a) Anchors - 03
037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. (b) Chain cable(Dia 17.5mm) (i) Full Shackles- 08 (ii) Half Shackles- 04
037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. (c) Swivel piece
037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. (d) Lug less joining shackles
037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. (e) D - Shackles
037 Anchor and Anchor chain cable. Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV/MFAB Dept. Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. (f) Chain Stopper/compressor
038 Anchor windlass Completely strip & overhaul anchor windlass, renew brake linings, refit and prove for satisfactory operation. Quoted price to include cost of liners and spares also.
039 Bollards (a) Twin bollard and foundation corroded and thinned. To be repaired/ renewed as per hull survey report. Doubler plate Area-420MMx420MM, Dia of pipe-219.1MM, Height-1460MM,Foundation Area-400MMx400MMx90MM, Thickness of plate-10MM Towing gear Securing Rod Dia-50MM.
039 Bollards (b) Towing bollard and foundatiosn corroded and thinned. To be repaired/ renewed as per hull survey report. Doubler plate Area-420MMx420MM, Dia of pipe-219.1MM, Height-1460MM,Foundation Area-400MMx400MMx90MM, Thickness of plate-10MM Towing gear Securing Rod Dia-50MM.
040 Guardrails (a)Fixed verticals guardrail stanchions on weather deck deformed/bent from deck. To be repaired/renewed. (Mat-MS angle bar)
040 Guardrails (b) Fixed Horizontal guardrails on weather deck deformed/bent To be repaired/renewed. (Mat-MS)
041 Metallilc chain guardrails Metallic chain guardrails of stanchions corroded to chipped and cleaned. Renewal cost should include cost of material also.
042 Sanitry sysytem Soil pipes to be removed, chemically cleaned, pressure tested and fitted back in situ. Mat: MS , Dia: 04inch. (Pressure: 3Kg/Cm2)
043 Ventilation (a) Mushroom type natural exhaust ventilator to be removed, cleaned/ overhauled and fitted back. Renew if required. Details- Mush room head dia-500 mm, Height-1550 mm
043 Ventilation (b) Mushroom type forced supply ventilator to be removed, cleaned/ overhauled and fitted back. Renew if required. Details- Mush room head dia-370 mm, Height-1550 mm,
044 Drainage system Drain pipe leading from mast deck to 01 deck and No. 1 deck to engine room corroded, thinned and holed, to be renewed. Mat: GI, 03 inch dia.
045 Sanitry system Sanitry fittingss in crew bathrooms and WC. (a) SS Wash basin to be renewed. Note:- Quoted repair cost shall include cost all items/spares. (a) Wash basin
045 Sanitry system Sanitry fittingss in crew bathrooms and WC. Sanitry fittings in crew bathrooms and wc to be renewed. (b) Provision SS tap: 1/2 inch
045 Sanitry system Sanitry fittingss in crew bathrooms and WC. (c) SS SUPPLY pipeline broken/damaged to be renewed/repaired. Mat : Cu-Ni, dia: ½ inch
045 Sanitry system Sanitry fittingss in crew bathrooms and WC. (d) Drain pipeline broken/damaged to be renewed/repaired. Mat-MS, dia- 2 inch
045 Sanitry system Sanitry fittingss in crew bathrooms and WC. (e) Flush valves to be renewed. Mat - Brass, Dia - 2"
046 Fresh water system Crew bathrooms and WC. .Note:- Quoted repair cost shall include cost all items/spares. (a) SS stop cock 1’’ to be renewed
046 Fresh water system Crew bathrooms and WC. (b) Shower head to be fitted in bathrooms Note:- Quoted repair cost shall include cost all items/spares.
047 Tyre fenders Tyre fender damaged on P&S side , to be renwed with used aircraft tyre fenders moulded with 8 mm white natural rubber. Mat- Rubber, colour-white . No painting or coating of any other form will be permitted. Vendors to adhere to SoW (a) OD 750mm; ID 450 mm , width - 250 mm
047 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side. (b) Chain Securing brackets/deck eyes.
047 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side (c) provission of Securing chain. 16 MM DIA for tyre fenders
047 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side (d) Bush for passing chain on tyres.
047 Tyre fenders Provision of securing arrangment in all Tyre fenders for fitment on ship side (e)Provision of D SHACKLES for tyre fenders
048 D shape Fenders (a) 'D' shaped rubber fenders damaged/perished to be renewed. Color - GREY/WHITE Length - 1000 mm length Location - 44 on shipside and 05 on transom Material - EPDM rubber as per NES170
048 D shape Fenders Securing brackets (b) Fender securing flat bar brackets to be repaired/renewed as necessasry.(Mat- MS). Size : 1100MM x 110MM x 08MM
048 D shape Fenders Securing brackets (c) Fender securing 'C' clamp brackets to be repaired/renewed as necessasry.(Mat- MS). Size : 200MM x 110MM x 08MM
049 Pneumatic Fender. (a) Provision of Pneumatic Fender on (P & S) side at FWD and AFT Specification of fenders:- Size - 660x1160 mm , Mat-Neoprene Blended Rubber having 65 % min Neoprene Content , Colour-White, Tensile strength- 180 Kgf/CM2, Elongation at break- 400 % min, Hardness- 700 max, Tear Strength- Min 40 Kgf/CM2, Compression set- 30 % Max, Abrasion resistance- 0.5 CC Max.
050 Pneumatic Fender Securing Arrangement (a) Fabrication of MS eye with 08 MM Thickness on shipside.
050 Pneumatic Fender Securing Arrangement (b) Provision of D Shackles, Dia 16 MM
050 Pneumatic Fender Securing Arrangement (c) Provision of Securing Chain 16 MM Dia length RMT 4 Mtr Each
051 Sky light SS butterfly nuts and tumbler bolt of engine room sky light &exhaust flaps broken. To be renewed. Dia of bolt : 10 mm & 6 inch length (Mat-MS).
052 Rubber beading Rubber beading of following doors,hatch and skylight perished/cracked to be renewed and chalk test to be proved. (EPDM Rubber with shore hardness 50 + 5o A) (a) WT door
052 Rubber beading Rubber beading of following doors,hatch and skylight perished/cracked to be renewed and chalk test to be proved. (EPDM Rubber with shore hardness 50 + 5o A) (b) WT Hatch
053 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (a) Forepeak Tanks
053 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (b) Fuel/ sullage Tank
053 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (c) Void space
053 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (d) cable locker
053 APT Air Pressure Test of the following tanks to be undertaken and rectify the defects if any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (e) cofferdams
054 Bilge paltform (a) Renew bilge platform plate. Material- aluminium chequerd plate, thickness- 05 mm
054 Bilge platform (b) Supporting brackets to be renewed where ever required(Mat - Ms). Securing nut&bolts to be of Mat-SS.
055 Cleats MS cleats perished/thinned to be renewed (Size-28 mm). Quote shall includes nuts bolts and associated accessories
056 Ventilation System (a) Breather pipes of various tanks on upper deck corroded and thinned including wire mesh, to be repaired/renewed. (Mat. GI pipe) Pipe dia 2 1/2 inch
056 Ventilation System (b) Deck distance piece and flanges corroded to be renewed including rubber joints. Dia 150mm
056 Ventilation System (c) Ventilation trunking wire mesh to be renewed at damaged areas. Size: 400mmX600mm
057 Deck underlay Dry compatments Deck underlay (Macrotech) to be repaired/ renewed at uprooted/ damaged/ steel renewed, accommodation areas, Wheel house and Alleways. (a) Surface preparation and application of EROP. And Mass 98.
057 Deck underlay Dry compatments Deck underlay (Macrotech) to be repaired/ renewed at uprooted/ damaged/ steel renewed, accommodation areas, Wheel house and Alleways.. (b) Surface preparation to be carried out by buffing on Mass 98 and application of Mass 96.
057 Deck underlay Dry compatments Deck underlay (Macrotech) to be repaired/ renewed at uprooted/ damaged/ steel renewed, accommodation areas, Wheel house and Alleways.. (c) Surface preparation and application of sealer coat on entire area
058 Deck underlay wet compartments Deck underlay (Macrotech) to be repaired/ renewed in bathrooms at uprooted/ damaged/ steel renewed. (a) Surface preparation and application of EROP. And Mass 98.
058 Deck underlay wet compartments Deck underlay (Macrotech) to be repaired/ renewed in bathrooms at uprooted/ damaged/ steel renewed. (b) Surface preparation to be carried out by buffing on Mass 98 and application of Mass 96.
058 Deck underlay wet compartments Deck underlay (Macrotech) to be repaired/ renewed in bathrooms at uprooted/ damaged/ steel renewed. (c) Surface preparation and application of sealer coat on entire area
059 Deck underlay dadoe area Deck underlay (Macrotech) to be repaired/ renewed in bathrooms. (a) Surface preparation and application of EROP. And Mass 98.
059 Deck underlay dadoe area Deck underlay (Macrotech) to be repaired/ renewed in bathrooms. (b) Surface preparation to be carried out by buffing on Mass 98 and application of Mass 96.
059 Deck underlay dadoe area Deck underlay (Macrotech) to be repaired/ renewed in bathrooms. (c) Surface preparation and application of sealer coat on entire area
060 WT Hatches WT hatch clips to be removed, cleaned, greased and refitted WT Hatch (0.6M x 0.6M)
061 WT Doors WT door clips to be removed, cleaned, greased and refitted WT Doors
062 NWT NWT Wooden door of wheel house perished, to be repaired/renewed including cylindrical door lock.
063 Manhole Rubber Joints perished, to be renewed (a) Joints
063 Manhole (b) Studs of manholes perished, to be renewed (Only defective studs to be renewed as per survey report )MS Studs with nut, size 20 mm
063 Manhole (c) Manhole covers corroded/ thinned. To be renewed. Mat - IS 2062 Grade 'B' steel. Size - 2' X 1.5'
064 Locking arrangment (a) Mortise locks in accomodation areas defective to be renewed.
064 Locking arrangment (b) MS Hasp staple/ locking arrangemet on MS Door and hatches corroded/ broken/ damaged to be renewed as per sample fitted.
065 Name Board Following name board perished/damaged, to be renewed/repaired. (a) repair/renewal of vessel name board including electroplating to be carried out on ship side -02
065 Name Board Following name board perished/damaged, to be renewed/repaired. (b) Vessel illuminated board with Perspex sheet - 01
065 Name Board Following name board perished/damaged, to be renewed/repaired. (c) Painting of vessel name on bulwark/Ship side in both Hindi and English with fluorescent paint -02
066 Furniture (a) CRCA kit lockers perished , to be renewed (90x80x45 cm )
066 Furniture (b) CRCA standing lockers perished, to be renewed (183x40x45 cm)
066 Furniture (c) Chairs in crew accomadation persihed/damaged , to be renewed
066 Furniture (d) Wooden table damaged/pershed to be renewed
066 Furniture (e) Wood paneling in crew rest room and wheel house damged/perished, to be renewed
ENGINEERING DEFECT LIST Sullage Pump Engine,MAKE:-M/S GREAVES,MODEL:-3TWA,TYPE:-(AIR COOLED,4-STROKE,VERTICAL INLINE,DIESEL FUELLED),SL NO:-(PORT 1108031010027,STBD-1108031010026)RATING:-25HP,RPM:-1500
1001 Sullage Pump Engine (a) Renewal of flexible hoses ( EN 853 2SN wire braid, dia 15 mm, with ST 1/4 inch, UNF MALE X Banjo
1001 Sullage Pump Engine (b) Air intake filter to be renewed ( Part No. 271-3700-14)
1001 Sullage Pump Engine (c) Renewal of engine oil,Oil will be supplied by NAVY
1001 Sullage Pump Engine (d) Renewal of corrosion plug as per sample (dia - 10 mm, length- 40 mm)
1001 Sullage Pump Engine (e) Renew Fuel oil filters elements .(part no. 9451 037 401& 9451 037 420)
1001 Sullage Pump Engine (f) Renewal of oil filter ( Part No.500-2175-19)
1001 Sullage Pump Engine (g) Engine to be started for trial for 30 minutes.
Sullage Pump MAKE:-M/S TUSHACO PUMP,TYPE:-Progressive,Cavity Screw,MODEL:-T1S 1450.1,SL NO:-(PORT 105182/5212,STBD 105182/5211),Capacity:-60TPH,Total Head-15MWC,Speed-300rpm
1002 Sullage Pump (a) Overhauling of pumps to be done. includes removal,renewal weardown parts and fit back.
1002 Sullage Pump (b) Performance trial for 30 minutes post overhauling.
Stripping Pump Engine,Make:-M/S Greaves,Type:-Air cooled,4-Stroke,Electric Start Diesel Engine,Speed:-3000rpm,Rating:-7.4bhp,SL No:-(Port-A0L0403225,Stbd-A0L0403224)
1003 Stripping Pump Engine (a) Lub oil sump to be drained, cleaned.(sump capacity 5 liters)
1003 Stripping Pump Engine (b) Renew air filter element
1003 Stripping Pump Engine (c) Renew Fuel oil filters element .
1003 Stripping Pump Engine (d) Engine to be started for trial for 30 minutes.
Stripping Pump Make:-M/S B E Pump,Model:-SH80-140N1-DGS2-316,Type:-Horizontal,Self-Priming,Centrifugal,Capacity:-60TPH,Total head:-15MWC,SL NO:-Port-358898,Stbd-358899.
1004 Stripping Pump (a) Overhauling of pumps includes removal,renewal weardown parts(Shaft,mechanical seals,impeller,gaskets) and fitted back.
1004 Stripping Pump (b) Performance trial for 30 minutes post overhauling.
Genset Make:-Kirloskar,Type:-HA394,Sl No:-03.2017/1021253,Rating:-23.55kw,32Hp
1005 Diesel Generator (a) Renewal of flexible hoses ( EN 853 2SN wire braid, dia 15 mm, with ST 1/4 inch, UNF MALE X Banjo)
1005 Diesel Generator (b) Air intake filter to be renewed.
1005 Diesel Generator (c) Renewal of engine oil Qty-10ltr,Oil will be supplied by NAVY
1005 Diesel Generator (e) Renewal of fuel filters(pre filter &Micro filter element) (Part No. 34.032.02.0 & 34.032.03.0)
1005 Diesel Generator (f) Renewal of oil filter( Part No. 03.040.19.0)
1005 Diesel Generator (g)Engine to be started for trial for 30 minutes.
Valve to be Overhauled Make-Vijoli,Type-Screw Down,Overhauling includes renewal of wear down parts (spindle,disc), Mat- GM
1006 Valves (a) Dia 150 mm
1006 Valves (b) Dia 50 mm
1006 Valves (c) Dia 15 mm
1006 Valves (d) Dia 80 mm
Rubber Expansion Bellow (with flange ) to be Renewed. Working Pr- 5 bar, Fluid- sullage oil
1007 Bellows (a) Dia 150 mm
1007 Bellows (b) Dia 80 mm
Three way Plug Cock to be Overhauled, Mat - SS
1008 Cocks (a) Dia 150 mm
1008 Cocks (b) Dia 80 mm
Semi Rotary Hand Pump to be Overhauled Make-VENUS,Model-N97
1009 Hand Pumps (a) Pump to be overhauled includes renewal of wear down parts.
1009 Hand Pumps (b) Wooden handled to be renewed.
1010 Overhauling of System V/V Valves (a)SDNR globe v/v . Dia - 150 mm
1010 Overhauling of System V/V Valves (b)SDNR globe suction v/v of sullage tank. Dia- 80 mm
1011 Relief Valve 80mm Dia Relief Valve to be removed,overhauled,calibrate(pr-04bar) and fitted back.
Glycerine filled Bourden Pr Gauges to be Renewed,Make-AN Instruments
1012 Pr. Gauges (a) Range:- -01 to 01 kg (suction pr gauge)
1012 Pr. Gauges (b) Range:- 0 to 04 kg (discharge gauge)
CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required)
1013 CO2 Fire Fighting System (a) CO2 cylinders to be removed, chemically cleaned, pressure tested and recharged with 45kg CO2
1013 CO2 Fire Fighting System (b) Non return valves on cylinder heads to be overhauled.
1013 CO2 Fire Fighting System (c) CO2 discharge nozzles to be opened, checked for chockages, cleaned and fitted back
1013 CO2 Fire Fighting System (d) Overhaul of relief valve assembly
1013 CO2 Fire Fighting System (e) Overhaul of pressure operated switch
1013 CO2 Fire Fighting System (f) Complete Co2 system piping to be blown through using HP air to prove system free of blockages
1013 CO2 Fire Fighting System (g) CO2 cylinders (45 kg capacty) and system pipes to be painted as per coding post work completion.
1013 CO2 Fire Fighting System (h) All system pipes (dia-20 mm) to be painted as per coding post work completion.
1013 CO2 Fire Fighting System (j) Renewal of flexible hoses as per sample (pr 275bar)
1013 CO2 Fire Fighting System (k) Actuator to be overhauled operated by N2
1013 CO2 Fire Fighting System (l) Solenoid to be checked for operation and renewed if declared BER.
1013 CO2 Fire Fighting System (m) Both Nitrogen cylinders to be removed, chemically cleaned, pressure tested and recharged with 10 ltr N2 each
1013 CO2 Fire Fighting System (n) Pr gauges to be renewed,Make-WIKARange-400 kg/cm2
1013 CO2 Fire Fighting System (p) Pr gauges to be renewed,Make-WIKARange-200 kg/cm2
1013 CO2 Fire Fighting System (q) Undertake Testing of the CO2 system as follows:
1013 CO2 Fire Fighting System (i) Lamp checks of various ' Indication' in the Control Panel. Replace if defective
1013 CO2 Fire Fighting System (ii) Open Pilot control Box to check indication on the panel
1013 CO2 Fire Fighting System (iii) Check Klaxon Horn and strobe comes on.
1013 CO2 Fire Fighting System (iv) Check Hooter and Fire detector replace if defective.
1013 CO2 Fire Fighting System (q) Pull pressure switch knob of pr swicth for premature discharge to check indication on the panel. Pull the pr switch knob for CO2 discharge indication. Check indication panel. The premature discharge indication shall go off. Reset both the knob after this operation. The indications shoukd go off. Note: The entire CO2 system to be proved for functional checks without Co2
1014 Misc Renewal of flexible hoses on discharge side of hand pump. Dia-65 mm , length 05 mtr each
1015, Misc Sounding caps of tanks damaged to be opened, manufactured as per sample
1016 Misc Cleaning / Renewal of sight glass of RU tank. Overhaul Spring loaded check valve of both tanks. Joints to be renewed and fitted back.
1017 Misc Quick Shut Off valves of the fuel tanks to be overhauled. Arrangement of the system involved to be overhauled for operating from remote position.(deck)
1018 Misc Hydrant v/v and fire hydrants to be overhauled and made operational Dia- 50 mm
ELECTRICAL DEFECT LIST Eqpt/System: 3ph 3wire sine wave Invertor;AC input 415V,3ph;DC input 360V;AC out put -415V,3Ph,sine wave
2001 Inverter carry out overhauling/checking/fault rectification of invertor and made it operational.presently Mother board is not working.
2002 Batteries Renew the Sealed Maintance free Lead acid batteries2000AH,12V. Make: Exide
2003, Eqpt/System:MSB MSB (a) MSB to be overhauled (includes defective switches to be renwed, perished control wiring to be renewed with crimping of proper lugs, marking sleeves to be put on control wiring and loose wirng to be tied with cable ties) (presently there is no deffective parts,all components are working.). Carryout routines mentioned below and prove them for satisfactory performance. (calibration certificates/test reports from NABL recognised Labs are to be submitted.)
2003 , Eqpt/System:MSB MSB (b) De-energise switchboard. Remove all busbars, insulators, CTs, PTs, junction boxes, switch contact surfaces, fuse bases/carriers and other components. Clean and decarbonise the busbar using soft brush/calico cloth dipped in alcohol. Thoroughly clean and ascertain the soundness of these components. Repair/replaced them as required.
2003 Eqpt/System:MSB MSB ( c ) Inspect cables and bus bar . Replace all Defective cables, wirings, lugs and termination. Tighten electrical connections and fasteners(Cable -100 mtr,1 sqm for 02 sections )
2003, Eqpt/System:MSB MSB (d) Apply LOCTITE ( or equivalent compound) to all loose screw/nuts of breaker asemblies.
2003 Eqpt/System:MSB MSB ( e ) Examine actuating mechanism and condition of contacts. Carry out repairs/ cleaning / lubrication of all mechanical parts and contacts and check for satisfactory operations
2003 Eqpt/System:MSB MSB (f) Rubber mat : Insulating Rubber Mat deteriorated. To be Renewed with oil resistance & very high voltage resistance Electrical rubber mat in front of MSB.(Thickness- 3mm) Make vardhaman model class c
2004 Battery Charging System Provide Battery chargering system 12V,DC from shore supply system for DG starting battery-1no at 1 deck, & sullage pump engines starting batteries 12V,180AH-4 nos at pump room
2005 Nav lights Renew the port navigational light fitting TWO stair type (230V,AC & 24V DC)
2006 Dynamos Over hauling 12V,DC Dynamos Make:TVS
2007 Starters Over hauling of self starters 12V,3HP DC Make:TVS
2008 DG Starting System Carry out overhauling/checking/fault rectification of engine control & starting wiring system and made it operational.Renew the any deffective parts (presently all working)
2009 Misc Renew the3core 25 sq.mm multy stand copper marine shore supply cable.
2010 Eqpt/System: shore supply pannel Shore supply panel Carry out overhaul of shore supply pannel.required to renew the window glass (8"X8")
2011 Eqpt/System: Motors Motors Carry out overhaul of 2 in nos blower motors 415V.3Ph,3HP-1no,230V,1Ph,.25HP-1no
2012 Eqpt/System: Ship Name Board Misc (a)Renew the acrylic 4mm sheet for name board Size:4'X2.5'
2012 Eqpt/System: Ship Name Board Misc (b)Renew the LED tube lights 20W,2',230V AC
2013 Eqpt/System: Wall mounted Fans Misc Renew the wall mounted fans 300mm sweep,230V Make:Bajaj/philps
2014 Eqpt/System:Flood lights Misc Renew the LED flood lamp 230V,200W
DRY DOCK AND ALLIED SERVICES WORK PACKAGES (A) Docking and undocking charges (Both Versions)
(B) Dock blocks preparation & laying out as per docking plan
Dock hire charges for an estimated duration of 60 Days as per OCR
Wet basin/alongside hire charges for the remaining duration (i.e. total refit duration of – 60 days docking period)
Provision of sufficient lighting for duty staff
Quote for maintenance of two in no. fire lines for the refit duration .
Provision of two transports (cars) for entire refit duration (one for refit Co-ordinating staff and one for ND(V) monitoring Team) for 12 hrs or 100KM/day whichever is less
Provision of Stationory/Office items for ND(V)/Refit monitoring team for entire refit duration period.Cater budget of Rs 2000/- per month.Requirement will be intimated RMT/NDV on as requirement basis.Payment at actuals. Note:- firms to quote.
Mail man services (02 Nos) for entire refit duration (one for user department and one for planning / Co-ordinating department ) to be provided for 10 Hrs per day
QC inspection for the entire scope of work by third party IRS/LRS/ABS/QC/TPI for the refit duration as per the QIS.
WINTECH ENGINEERING WORKS
HIGH SEAS SHIPPING ASSOCIATES
Sadhav Offshore Engineering Company
ASMACS
YEOMAN MARINE SERVICES PVT. LTD.
M/s Krasny Defence Technologies Pvt Ltd
CARE MARINE AND ALLIED SERVICES
SAGAR SHIP REPAIRERS AND MARINE SERVICES
MARINE CARE N ASSOCIATES
Bidder Name
Sadhav Offshore Engineering Company
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .