Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹57.5 LAccepted-AOC | 1 | Accepted-AOC approved |
Tender Value
₹62.4 L
EMD Value
₹1.2 L
Closing Date
15 Mar 2023, 5:00 pmClosed
EE Ujs office Pauri
EE office negi bhawan kandoli road pauri
KAFOLGAON water supply scheme PAURI block Under Pauri Division
2023_UKJS_55518_26
3165/JJM/etender20-02-23
Open Tender
Civil Works - Water Works
Item Wise
180 days
Devdhar Ekeshwar Blcok
As per ten doc
2 documents required · 2 mandatory
₹4,720
Yes
EE UJs pauri
₹1.2 L
03.03.2023
3 Oct 2023
6 Mar 2023
16 Mar 2023
6 Mar 2023
15 Mar 2023
6 Mar 2023
8 Mar 2023
Rates for Supplying ,carting , laying and jointing of G.I pipe (M) , Source work ,Reservoir& Providing Functional House Hold Tap Connection (FHTC) for appropriate & qualitative drinking water for each house hold and all other appurtenant works etc complete KAFOGAON SOLOR PUMPING water Supply scheme Under PAURI blocks in District Pauri. All rates shall be included all types of taxes and G.S.T. It is necessary the contractor will start the work from source to Distribution System. If any dispute in the source than other work will not done by the contractor
Porviding of alla materiala carting from site store to site of wark, laying & Jointing of G.I Screwed pipes (incluiding supply of all jointing material liks specials white led hemp, and oil etc) in trenched with its cutting threading and testing of pipe line etc complete G.I Heavu quality a) 50 mm dia
50 mm dia
25 mm dia
20 mm dia
15 mm dia
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 90% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock Soil mixed with boulder and bajri
Soft rock
Supply and fixing of the following fittings including cartage of materials,labours ,T.&P. etc. complete Gate valves (Class-I)as per I S 788/1997 32mm dia
40 mm dia
Supply of all materials,labours ,T.&P. etc.and construct Gate valve chamber as per type design complete
Construction of R.C.C. Intake chamber having (1.0mx1.0mx1.5m) size at tapping point of Paniyar spring for collection of water including supply of all materials,labour, T&P etc. complete.
Construction of R.C.C. Toe wall nearby soure for protection of source work including supply of all materials,labour, T&P etc. complete.
Construction of R.C.C. Roughfning Filter cum screening chamber wall nearby source for protection of source work including supply of all materials,labour, T&P etc. complete.
Supply cartege lowering the in to the trenches laying true to aligment and gradient joingind an fixing with pipe line including cutting and threading making up lengths as required for proper completion of work with the fllowing fitting including cartage material labours T&P etc complete 15 mm (TP 10 kg/sqcm)
GM Gate Valve IS 778 Class-I 50 mm dia
Sour/Sluice valves (PN1.6) as per IS 778/200 50 mm dia
Non return valves (PN1.6) as per IS 778/200 50 mm dia
Supply of all material labour T&P etc and construct Non return/scour/sluice /air valve chamber as per type degin complete
Supply of all materials, labour, T&P etc and construction of R.C.C. CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2 . 15.00 kl
Construction of Pump house at M.P.S. over steening of sump in 3.00 meter dia and 2.50 meter height, as per drawing including cost of all material labour, cartage and T&P etc all complete.
Supply, installation, fixing and 12month operation/maintenance of Solar Pump of 5-00 HP, 140.00Mtr. Head and 50.00 lpm discharge, with all accessories i.e., solar pannel, batteries,fencing work etc. complete.(As per market rate available including GST@ 5% on E&M works and 18% on civil works.)
RR stone masonary with 1:6 cement and sand mortar nearby sources and along the pipe line for proper completion of work.
RR stone masonary laid in dry for proper completion of work along the pipe line.
Material testing
Godwan haring
Advertisement board (SIZE 0.90 x 0.60 Mtr.)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .