Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC 17 6 FLAT NO 06 SAROJ MANSION BUILDING 6TH STREET NANDANAM EXTENSION NANDANAM CHENNAI TAMIL NADU 600035 | CHENNAI | TAMIL NADU | 600035 | ₹2.1 Cr Quoted ₹1.8 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹1.8 Cr+₹1.1 L (0.61%)Rejected-Finance 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | ₹1.8 Cr+₹1.1 L (0.61%) | L2 | Rejected-Finance L2 bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically disqualified |
Tender Value
Refer Docs
EMD Value
₹4.0 L
Closing Date
9 Dec 2020, 5:00 pmClosed
The GM,STPS
Admin Bldg , STPS , Santaldih , Purulia 723146
ARC for attending Boiler Tube Leakage and other allied works at STPS.
2020_WBPDC_305441_1
WBPDCL/STPS/NIT/E2221/20-21
Open Tender
Support/Maintenance Service
Item Rate
730 days
STPS, Santaldih
As stated in NIT
2 documents required · 2 mandatory
₹0
₹4.0 L
Yes
STPS , Santaldih
19 May 2021
18 Nov 2020
12 Dec 2020
18 Nov 2020
9 Dec 2020
25 Nov 2020
24 Nov 2020
Amount
Monthly Assured amount for lumpsum scope
Radiography of Welding Joint as per
Dismantling & Lifting of LTSH Module
Dismantling & Lifting of Economiser
Stress Relieving as per Schedule
Fins Fitting & Running Welding at new
Rectification of Buck Stay at different
Welding of Economiser Tube (38.1X4 mm)
Welding of LTSH Tube (47.63X5 mm)
Welding of Water Wall Tube(63.5X5.6 and
Welding of Platen/FSH tube
Welding of Reheater Tube (63.5/57/54X4
Repairing of Header by Build up
High Pressure Welding of more than 63.5
Fabrication of Different size bend
Boiler 2nd pass Water cleaning
Pent House cleaning
Replacement of HP valve size above 25 mm
Replacement of HP valve size above 50 mm
Replacement of HP valve size above 100
Ex-BHEl Expert for safety valve
Seat cutting expert along with seat
De-insulation & Re-insulation of boiler
De-insulation and reinsulation of steam
De-insulation and reinsulation of steam
De-insulation & Re-insulation of valve
De-insulation & Re-insulation of valve
Removal and Re-application of refractory
Ash cleaning work from boiler buckstay/
Ash Cleaning works from PA Duct/FD Duct/
High pr. Welding above 25 NB and upto 65
High pr. Welding above 65 NB and upto 80
High pr. Welding above 80 NB and upto
High pr. Welding above 100 NB and upto
High pr. Welding above 150 NB and upto
High pr. Welding above 200 NB and upto
High Pr. Valve replacement, upto 50 NB
High Pr. Valve replacement, 250 NB
Welding of turbine lub oil line upto
Welding of turbine lub oil line from 50
Radiography of joint as per schedule
Stress relieving as per schedule
De-insulation and reinsulation of steam
De-insulation and reinsulation of steam
De-insulation & Re-insulation of valve
De-insulation & Re-insulation of valve
Boiler metal temp TC & mounting replace
Thermowell replace in high pr lines
Replace of High Pr. v/vabove 25 to 50 NB
Radiography of joint as per schedule
Stress Relieving as per Schedule
TECHNO ENGINEERING
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .