Loading…
Loading…
Tender Value
₹16.0 L
EMD Value
₹17,000
Closing Date
15 May 2026, 5:00 pmClosed
Executive Engineer, PRI Division, Vijayawada
Vijayawada
Completion of incomplete GP office building at Venganayakunipalem, Penuganchiprolu (M) Est.Rs.20.00 lakhs
929036
NIT No.11/T.O./2026-27, dt:25.04.2026 of Executive Engineer, PRI Division, Vijayawada (1st call)
OPEN - NCB
Buildings
NTR
7 documents required · 7 mandatory
₹567
₹17,000
30 Apr 2026
30 Apr 2026
30 Apr 2026
Work 3 Completion of incomplete GP office building at Venganayakunipalem, Penuganchiprolu (M) Est.Rs.20.00 lakhs Plain Cement Concrete corresponding to grade as per IS 456 equivalent to (1:6:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal fro m approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete including Overhead charges & Contractor's Profit @13.615% but Excluding Seigniorage charges & GST (APSS No. 402) for G.F
Work 3 Painting to New Wood work with two coats of Ready mixed Synthetic Enamel paint first quality all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, Sales & other taxes , all operational, incidental and labour charges etc.complete for finished item of work (3 Coats) including Overhead charges & Contractor's Profit @ 13.615% but excluding GST.
Work 3 Flooring with Nano polished Vitrified floor tiles of size 600x600 mm (8-10mm), set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, for finished item of work, including Overhead charges & Contractor's Profit @13.615% but Excluding Seigniorage charges & GST
Work 3 Providing skirting to internal walls to 15 cm height/risers of steps with Nano polished Vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like stone, cement, sand and water etc., complete including Overhead charges & Contractor's Profit @13.615% but Excluding Seigniorage charges & GST .
Work 3 Providing amd applying Synthetic Plaster Putty or equivalent putty such as Birla WallCare putty or texture paint or equivalent such as NCL/Saicoat texture paint of average 1 to 2mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials,applying emery paper,Sand the surface, clean & wipe off loose dust, applying putty/texture paint filler by putty knife/ muslin pad, air dry for 2-3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational,incidental,labour charges etc. complete for finished item of work for External walls -excluding cost of access scaffolding including Overhead charges & Contractor's Profit @ 13.615% but excluding GST.
Work 3 Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors including Overhead charges & Contractor's Profit @13.615% but Excluding & GST (APSS No. 911) For interior walls
Work 3 Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors including Overhead charges & Contractor's Profit @13.615% etc.complete but Excluding GST For exterior walls
Work 3 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost and conveyance charges of all materials excluding seigniorage charges and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab including Overhead charges & Contractor's Profit @13.615% etc.complete but Excluding Seigniorage charges & GST
Work 3 Providing and fixing factory made uPVC white colour sliding glazed windowupto 1.50 m in height dimension comprising of uPVC multi-chamberedframe with in-built roller track and sash extruded profiles duly reinforcedwith 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (whitepowder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at allcorners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod ofrequired size and of approved quality, all complete as per approved drawing& direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealent . Note: For uPVC frame and sash extruded profiles minus 5% tolerancein dimension i.e. in depth & width of profile shall be acceptable.Variation in profile dimension in higher side shall be accepted. But no extra payment on this account shall be made. Two track two panels sliding window made of (small series) frame 52 x 44 mm &sash 32 x 60 mm both having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriate dimension. (Area of window upto 1.75 sqm).Including Overhead charges & Contractor's Profit @13.615% etc.complete Excluding GST.
Work 3 Supply and fixing of Flush Door shutter of size 1.20 x 2.10 mts with block board type with teak veneer on one face and commercial ply on another face 30mm thick (confirming to IS:2202 of Shabdwara ) ,with frame made of well seasoned Sal Wood scantlings of size 100x75mm including cost and coveyance of all materials and labour charges including all furniture and fittings like Z hold fasts, hinges, tower bolts and aldrops etc., complete including Overhead charges & Contractor's Profit @13.615% but Excluding GST.
Work 3 Supply and fixing of Flush Door shutter of size 1.05 x 2.10 mts with block board type with teak veneer on one face and commercial ply on another face 30mm thick (confirming to IS:2202 of Shabdwara ) ,with frame made of well seasoned Sal Wood scantlings of size 100x75mm including cost and coveyance of all materials and labour charges , cost and conveyance of all furniture and fittings like Z hold fasts, hinges, tower bolts and aldrops etc., complete including Overhead charges & Contractor's Profit @13.615% but Excluding GST.
Work 3 Ornamental plastering with CM (1:5) 8mm thick including cost and conveyance of all materials all labour charges etc., complete including Overhead charges & Contractor's Profit @13.615% Excluding Seigniorage charges & GST.
Work 3 Plastering with CM (1:5) 12mm thick including cost and conveyance of all materials and all labour charges etc., complete for superstructure including Overhead charges & Contractor's Profit @13.615% Excluding Seigniorage charges & GST
Work 3 Cost and supply of MS Grills including cost and conveyance to work spot and Fabrication charges of steel like cutting rods, welding grills ,placing in position etc. complete including Overhead charges and Contractor's profit @13.615% but excluding GST.
Work 3 Construction of Toilet Block Earth Work Excavation for foundations and depositing on bank with an initial lead of 10m including all operational , incidental, labour Charges such as shoring, Sheething, planking, strutting, etc. complete for finished item of work including Overhead charges and Contractor's Profit @13.615% but excluding Seigneorage charges and GST.
Work 3 Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete including Overhead charges & Contractor's Profit @13.615% but Excluding Seigniorage charges & GST
Work 3 Supply and placing of the VRCC M.25 Design Mix Concrete corresponding to IS456 using Weigh Batcher/Mixer with 20-10mm size graded machine crushed hard granite metal(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate (Sand) ,coarse aggregate,water etc. to site and including all operatrional ,incidental and labour charges such as weigh batching, machine mixing,laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping,centering,shutttering ,laying concrete, vibrating,curing including overhead charges and Contractor's Profit @13.615% but excluding Seigneorage charges and GST.-For Footings.
Work 3 Supply and placing of the VRCC M.25 Design Mix Concrete corresponding to IS456 using Weigh Batcher/Mixer with 20-10mm size graded machine crushed hard granite metal(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate (Sand) ,coarse aggregate,water etc. to site and including all operatrional ,incidental and labour charges such as weigh batching, machine mixing,laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping,centering,shutttering ,laying concrete, vibrating,curing including overheadcharges and Contractor's Profit @13.615% but excluding Seigneorage charges and GST.-For Pedastals.
Work 3 Supply and placing of the VRCC M.25 Design Mix Concrete corresponding to IS456 using Weigh Batcher/Mixer with 20-10mm size graded machine crushed hard granite metal(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate (Sand) ,coarse aggregate,water etc. to site and including all operatrional ,incidental and labour charges such as weigh batching, machine mixing,laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping,centering,shutttering ,laying concrete, vibrating,curing including overheadcharges and Contractor's Profit @13.615% but excluding Seigneorage charges and GST.-For Plinth Beams.
Work 3 Supply and placing of the VRCC M.25 Design Mix Concrete corresponding to IS456 using Weigh Batcher/Mixer with 20-10mm size graded machine crushed hard granite metal(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate (Sand) ,coarse aggregate,water etc. to site and including all operatrional ,incidental and labour charges such as weigh batching, machine mixing,laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping,centering,shutttering ,laying concrete, vibrating,curing including overhead charges and Contractor's Profit @13.615% but excluding Seigneorage charges and GST.-For Columns.
Work 3 Supply and placing of the VRCC M.25 Design Mix Concrete corresponding to IS456 using Weigh Batcher/Mixer with 20-10mm size graded machine crushed hard granite metal(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate (Sand) ,coarse aggregate,water etc. to site and including all operatrional ,incidental and labour charges such as weigh batching, machine mixing,laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping,centering,shutttering ,laying concrete, vibrating,curing including overhead charges and Contractor's Profit @13.615% but excluding Seigneorage charges and GST.-For Roof Beams.
Work 3 Supply and placing of the VRCC M.25 Design Mix Concrete corresponding to IS456 using Weigh Batcher/Mixer with 20-10mm size graded machine crushed hard granite metal(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate (Sand) ,coarse aggregate,water etc. to site and including all operatrional ,incidental and labour charges such as weigh batching, machine mixing,laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping,centering,shutttering ,laying concrete, vibrating,curing including overhead charges and Contracto'rs Profit @13.615% but excluding Seigneorage charges and GST.-For 100mm Th.Roof Slab
Work 3 Supply and placing of the VRCC M.25 Design Mix Concrete corresponding to IS456 using Weigh Batcher/Mixer with 20-10mm size graded machine crushed hard granite metal(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate (Sand) ,coarse aggregate,water etc. to site and including all operatrional ,incidental and labour charges such as weigh batching, machine mixing,laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping,centering,shutttering ,laying concrete, vibrating,curing including overheads and Contractors Profit @13.615% but excluding Seigneorage charges and GST.-For Lintels.
Work 3 Supply and placing of the VRCC M.25 Design Mix Concrete corresponding to IS456 using Weigh Batcher/Mixer with 20-10mm size graded machine crushed hard granite metal(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate (Sand) ,coarse aggregate,water etc. to site and including all operatrional ,incidental and labour charges such as weigh batching, machine mixing,laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping,centering,shutttering ,laying concrete, vibrating,curing including overhead charges and Contractor's Profit @13.615% but excluding Seigneorage charges and GST.-For Sunshades.
Work 3 Masonry Work in C.M.(1;6) prop with Flyash cemrnt solid blocks of size 290x225x140mm for manufacturing of flyash solid blocks using flyash of 80 Kgs, cement of 15 Kgs and stone dust including cost and conveyance of all materials, labour charges,scaffolding and curing etc. complete with a compressive strenth not less than 50 Kg/Sqm including Overhead charges and Contractor's Profit @13.615% but excluding seigneorage charges and GST.for walls for basement
Work 3 Filling with sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges,hire charges of T&P etc complete for finished item of work including Overheads and Contractors Profit @13.615% but excluding Seigneorage charges and GST.
Work 3 Filling with useful available excavated earth (excluding rock) with alead of 50m in trenches ,sides of foundation with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges,hire charges of T&P etc complete for finished item of work including Overheads and Contractors Profit @13.615% but excluding Seigneorage charges and GST.
Work 3 Plain Cement Concrete corresponding to grade as per IS 456 equivalent to (1:6:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal fro m approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete including Overheads & Contractors Profit @13.615% but Excluding Seigniorage charges & GST (APSS No. 402) for G.F
Work 3 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost and conveyance charges of all materials excluding seigniorage charges and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab including Overhead Charges & Contractor's Profit @13.615% etc.complete but Excluding Seigniorage charges & GST.
Work 3 Masonry Work in C.M.(1;8) prop with Flyash cement solid blocks of size 290x225x140mm for manufacturing of flyash solid blocks using flyash of 80 Kgs, cement of 15 Kgs and stone dust including cost and conveyance of all materials, labour charges,scaffolding and curing etc. complete with a compressive strenth not less than 50 Kg/Sqm including Overhead Charges and Contractor's Profit @13.615% but excluding seigneorage charges and GST.for walls for Superstructure.
Work 3 Plastering with CM (1:5) 12mm thick including cost and conveyance of all materials and all labour charges etc., complete for superstructure including Overhead charges & Contractor's Profit @13.615% but excluding Seigniorage charges & GST
Work 3 Ornamental plastering with CM (1:5) 8mm thick including cost and conveyance of all materials all labour charges etc., complete including Overhead charges & Contractor's Profit @13.615% but excluding Seigniorage charges & GST
Work 3 Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors including Overhead charges & Contractors Profit @13.615% but excluding Seigniorage charges & GST (APSS No. 911) For interior walls
Work 3 Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors including Overhead charges & Contractor's Profit @13.615% but excluding Seigniorage charges & GST For exterior walls
Work 3 Flooring with Ceramic tiles , set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, for finished item of work, including Overhead charges & Contractor's Profit @13.615% but excluding Seigniorage charges & GST
Work 3 Providing Dadooing to internal walls to 15 cm height/risers of steps with 7.30mm thick Ceramic tiles length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like stone, cement, sand and water etc., complete including Overhead charges & Contractor's Profit @13.615% but excluding Seigniorage charges & GST .
Work 3 Supplying and Fixing Orissa Pan White glazed W.C.1st quality ISI marked confirming to IS2556-Part-3-1981 with' P' or' ' S 'trap 630mmx450mm including Overhead charges and Contractor's Profit @13.615% but excluding GST.
Work 3 Supplying and Fixing 12.7mm N.P. bib tap Indian make heavy duty Long body including Overhead charges and Contractor's Profit @13.615% but excluding GST.
Work 3 Supplying and Fixing Premium make CPVC Pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( Cpper Tube Sizes 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from identical CPVC Compounds having the same physical properties for Hot and Cold water (IS-15778:2007) including Overhead charges and Contractor's Profit @13.615% but excluding GST' - For 22.20mm OD pipe -SDR 13.5
Work 3 Supplying and Fixing Premium make CPVC Pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( Cpper Tube Sizes 1/2" ton 2" SDR11 and SDR13.5 pipes are made from identical CPVC Compounds having the same physical properties for Hot and Cold water (IS-15778:2007 including Overhead charges and Contractor's Profit @13.615% but excluding GST' - For 28.60mm OD pipe -SDR 13.5
Work 3 Providing and placing on Terrace (at all floor levels ) Polythylene water storage tank with double layer approved brand and manufacture with cover and suitable looking arrangements and making necessary wholes for inlet and outlet pipes and labour chargs etc. complete including Overhead charges and Contractor's Profit @13.615% but excluding GST.
Work 3 Cost and supply of MS Grills including cost and conveyance to work spot and Fabrication charges of steel like cutting rods, welding grills ,placing in position etc. complete including Overhead charges and Contractor's profit @13.615% but excluding GST.
Work 3 Providing and fixing 28-30mm thick Solid Wood Polymer Composite (WPC) single extruded door shutter with 3mm top and bottom rigid layer with an overall density of 750 Kg/Cum. It will be required for fixing the door with the frame including Overhead charges and Contractor's Profit @13.615% but excluding GST.
Work 3 Door Frame Section of 45x75mm . The two Verical members are to be joined together with the horizontal member using 8x50 mm long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/ assembled door frame is fixed to the wall using hold fast or bolt Fasteners.A minimum of 4 Nos of Screws to be provided for each verical member & minimum 2 Nos. for horizontal member including Overhead charges and Contractor's Profit @13.615% but excluding GST.
Work 3 Cost and supply of HYSD bars including cost and conveyance to work spot and Fabrication charges of steel like cutting rods, welding grills ,placing in position etc. complete including Overhead charges and Contractors profit @13.615% but excluding GST.
Work 3 Construction of Compound wall Earth Work Excavation for foundations and depositing on bank with an initial lead of 10m including all operational , incidental, labour Charges such as shoring, Sheething, planking, strutting, etc. complete for finished item of work including Overhead charges and Contractor's Profit @13.615% but excluding Seigneorage charges and GST.
Work 3 Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal fro m approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete including Overhead charges & Contractor's Profit @13.615% but excluding Seigniorage charges & GST (APSS No. 402)-Levelling Course.
Work 3 Supply and placing of the VRCC M.25 Design Mix Concrete corresponding to IS456 using Weigh Batcher/Mixer with 20-10mm size graded machine crushed hard granite metal(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate (Sand) ,coarse aggregate,water etc. to site and including all operatrional ,incidental and labour charges such as weigh batching, machine mixing,laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping,centering,shutttering ,laying concrete, vibrating,curing including overhead charges and Contractor's Profit @13.615% but excluding Seigneorage charges and GST.-For Footings.
Work 3 Supply and placing of the VRCC M.25 Design Mix Concrete corresponding to IS456 using Weigh Batcher/Mixer with 20-10mm size graded machine crushed hard granite metal(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate (Sand) ,coarse aggregate,water etc. to site and including all operatrional ,incidental and labour charges such as weigh batching, machine mixing,laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping,centering,shutttering ,laying concrete, vibrating,curing including overhead charges and Contractor's Profit @13.615% but excluding Seigneorage charges and GST.-For Pedastals.
Work 3 Supply and placing of the VRCC M.25 Design Mix Concrete corresponding to IS456 using Weigh Batcher/Mixer with 20-10mm size graded machine crushed hard granite metal(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate (Sand) ,coarse aggregate,water etc. to site and including all operatrional ,incidental and labour charges such as weigh batching, machine mixing,laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping,centering,shutttering ,laying concrete, vibrating,curing including overhead charges and Contractor's Profit @13.615% but excluding Seigneorage charges and GST.-For Plinth Beams.
Work 3 Supply and placing of the VRCC M.25 Design Mix Concrete corresponding to IS456 using Weigh Batcher/Mixer with 20-10mm size graded machine crushed hard granite metal(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate (Sand) ,coarse aggregate,water etc. to site and including all operatrional ,incidental and labour charges such as weigh batching, machine mixing,laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping,centering,shutttering ,laying concrete, vibrating,curing including overhead charges and Contractor's Profit @13.615% but excluding Seigneorage charges and GST.-For Columns.
Work 3 Filling with useful available excavated earth (excluding rock) with alead of 50m in trenches ,sides of foundation with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges,hire charges of T&P etc complete for finished item of work including Overhead charges and Contractors Profit @13.615% but excluding Seigneorage charges and GST.
Work 3 Plain Cement Concrete corresponding to grade as per IS 456 equivalent to (1:6:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal fro m approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete including Overheads & Contractors Profit @13.615% but Excluding Seigniorage charges & GST (APSS No. 402) for G.F
Work 3 Masonry Work in C.M.(1;8) prop with Flyash cemrnt solid blocks of size 290x225x140mm for manufacturing of flyash solid blocks using flyash of 80 Kgs, cement of 15 Kgs and stone dust including cost and conveyance of all materials, labour charges,scaffolding and curing etc. complete with a compressive strenth not less than 50 Kg/Sqm including Overhead Charges and Contractor's Profit @13.615% but excluding seigneorage charges and GST.for walls for Super structure.
Work 3 Plastering with CM (1:5) 12mm thick including cost and conveyance of all materials and all labour charges etc., complete for superstructure including Overhead charges & Contractor's Profit @13.615% excluding Seigniorage charges & GST
Work 3 Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors including Overhead charges & Contractor's Profit @13.615% but excluding Seigniorage charges & GST- For exterior walls
Work 3 Cost and supply of MS Grills including cost and conveyance to work spot and Fabrication charges of steel like cutting rods, welding grills ,placing in position etc. complete including Overhead charges and Contractor's profit @13.615% but excluding GST.
Work 3 Cost and supply of HYSD bars including cost and conveyance to work spot and Fabrication charges of steel like cutting rods, welding grills ,placing in position etc. complete including Overhead charges and Contractor's profit @13.615% but excluding GST.
Work 3 Electrification Supply and Fixing of 25mm dia 1.80mm thick PVC pipe (ISI MARK) concealed in Wall with all required accessories including masonary work and labour charges etc., complete. Make : Sudhakar/ Maco Plast / Modi ., complete for finished item of work Including Overheads & Contractors Profit @13.615% etc.complete but excluding GST
Work 3 Supplying & run of 2 of 2.5 Sqmm 36/0.3mmFR PVC insulated flexible copper cable in Existing pipe for mains including cost of all materials, all taxes, conveyance to site and all labour charges for all operations etc., complete as directed by Engineer in Charge complete for finished item of work Including Overheads & Contractors Profit @13.615% etc.complete but excluding GST
Work 3 Supplying & run of 2 of 4 Sqmm 56/0.3mmFR PVC insulated flexible copper cable in Existing pipe for mains including cost of all materials, all taxes, conveyance to site and all labour charges for all operations etc., complete as directed by Engineer in Charge complete for finished item of work Including Overheads & Contractors Profit @13.615% etc.complete but excluding GST
Work 3 Supply and run of 1 of 14/0.3mm (1.0 Sqmm) FR / FRLS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable in existing pipe for earth continuity including cost of all materials, all taxes, conveyance to site and all labour charges for all operations etc., complete as directed by Engineer in Charge. complete for finished item of work Including Overheads & Contractors Profit @13.615% etc.complete but excluding GST
Work 3 Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., comp Make : Finolex / RR Kabel / KEI complete for finished item of work Including Overheads & Contractors Profit @13.615% etc.complete but excluding GST
Work 3 Supply and fixing of 16A 3pin and 6A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in 1) on modular cover frame including earth connection and all labour charges etc., complete on wall. complete for finished item of work Including Overheads & Contractors Profit @13.615% etc.complete but excluding GST
Work 3 Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch Board with earth continuity including wire lleads , earth connections along with all labour charges etc. complete including Over head Charges and Contractors Profit @ 13.615% but excluding GST.
Work 3 Supply of Mini Modular Stepped type Electronic Regulator with Cover Frame for Ceiling fans 900/1200/1400mm sweep complete erected on existing board including cost of all materials, all taxes, conveyance to site and all labour charges for all operations etc., complete as directed by Engineer in Charge. complete for finished item of work Including Overheads & Contractors Profit @13.615% etc.complete but excluding GST
Work 3 Supply & Fixing of 1200mm (48") sweep 230V, A.C 50 Hz. ceiling fan with 3 blades and double ball bearings with all standard accessories including cost of all materials, all taxes, conveyance to site and all labour charges for all operations etc., complete as directed by Engineer in Charge complete for finished item of work Including Overheads & Contractors Profit @13.615% etc.complete but excluding GST
Work 3 Supply and fixing of 20W, 2400 lumens, T8 not less than 1100 mm length LED retrofit tube light with aluminum anodized body, input voltage AC 220 - 260 Volts, having luminous efficacy >=100 lumens/ watt, with PF>0.9, surge protection: 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K-5700K, minimum CRI>70, etc., as per IS 10322 (Part 5/ Sec 1), 2012, complete with earth connection and not less than two years warranty. Makes: As per list of recommended brands as category I.ELEC-3.8.16 complete for finished item of work Including Overheads & Contractors Profit @13.615% etc.complete but excluding GST
Work 3 Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges complete for finished item of work Including Overheads & Contractors Profit @13.615% etc.complete but excluding GST
Work 3 Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including cost of all materials, all taxes, conveyance to site and all labour charges for all operations etc., complete as directed by Engineer in Charge. complete for finished item of work Including Overheads & Contractors Profit @13.615% etc.complete but excluding GST
Work 3 Supply and Run of 2 of 2.5 Sq.mm WPSC (Whether Proof Single Core) Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains. complete for finished item of work Including Overheads & Contractors Profit @13.615% etc.complete but excluding GST
Work 3 Supply and Erecting, ISI mark submersible 1.0 H.P. ,Single Phase 18 stages pumpset suitable for 106/156 mm dia borewell with high quality water resistant and dynamically balanced bronze impeller with stainless steel shaft sleeves, Pump coupling and pivot of Single Phase 250V,50HZ, A.C. power supply copper winding with water proof insulation and high precision strength not to be effected by chemical in water and suitable bronze bearings with nut and bolts etc, with necessary H- type clamp of Suitable size and strength including Overhead Charges and Contractors Profit @13.615% but excluding GST.
Work 3 Supply and fixing SPN Distribution board with IP-43 protection suitable for single phase Earth Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out going including internal connections and labour charges for surface / flush mounting etc., complete. complete for finished item of work Including Overheads & Contractors Profit @13.615% etc.complete but excluding GST
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Bld. Doc.doc
TENDER_DOCUMENT • 0.64 MB
BOQ.xlsx
TENDER_DOCUMENT • 0.14 MB
DECLARATION.docx
TENDER_DOCUMENT • 0.02 MB
Venganayakunipalem Schedule.xls
TENDER_DOCUMENT • 0.12 MB
Download all tender documents and submit your bid