Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.7 LAccepted-AOC DHAR MADHYA PRADESH 454775 | DHAR | MADHYA PRADESH | 454775 | 1 | Accepted-AOC lowest bidder | |
| 2 | 2₹5.1 Cr+₹4.6 Cr (891.6%)Rejected-Finance A 8 MOHAN COOPERATIVE INDUSTRIAL ESTATE MATHURA ROAD NEW DELHI 110044 | NEW DELHI | SOUTH EAST DELHI | DELHI | 110044 | 2 | Rejected-Finance Not the lowest bidder | |
| 3 | 3₹28.6 Cr+₹28.0 Cr (5415.7%)Rejected-Finance 3 6 271 2ND FLOOR SUDHEET TAPANI TOWERS HIMAYATH NAGAR HYDERABAD 500029 40 HYDERABAD TELANGANA 500029 | HYDERABAD | TELANGANA | 500029 | 3 | Rejected-Finance Not the lowest bidder |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
17 Feb 2020, 11:00 amClosed
Member Secretary
Member Secretary, Kerala State Pollution Control Board, Head Office, Thiruvananthapuram
Continuous Real Time Noise Level Monitoring Station and Online Digital Display Board two stations each at Ernakulam and Thiruvananthapuram
2020_KSPCB_337255_1
PCB/HO/AEE3/CANM/04/19
Global Tenders
Facility Management Services
Item Wise
90 days
Ernakulam
As per annexure 1
8 documents required · 8 mandatory
₹2,500
Yes
online
₹50,000
Yes
22 Oct 2021
20 Jan 2020
18 Feb 2020
20 Jan 2020
17 Feb 2020
20 Jan 2020
20 Jan 2020 - 27 Jan 2020
Cost for supply of real time noise measuring station and data logger
Cost for supply of 4m pole/mast suitable to fix noise monitoring and solar power panel systems with adequate civil foundation
Cost for Supply of digital display board or weather proof TV which can display only text video as per the specifications
Cost for installation and commissioning of real time noise level measuring station with digital display board on Civil structure (2sqm)
Solar Power Panel of adequate capacity to the system along with Battery
Cost for CAMC during warranty period of first year ( Including manpower)
Cost for CAMC during warranty period of second year ( Including manpower)
Cost for CAMC during warranty period of third year ( Including manpower)
Cost for CAMC during post warranty period for first year ( Including manpower)
Cost for CAMC during post warranty period for second year ( Including manpower)
AIMIL LIMITED
Structural Solutions Private Limited
US Dollar
European Euro
Japanese Yen
Portion of Quoted Rate in Currency
US Dollar
US Dollar
Japanese Yen
Japanese Yen
US Dollar
US Dollar
European Euro
US Dollar
US Dollar
European Euro
Japanese Yen
Portion of Quoted Rate in Currency
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .