| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.8 L+₹1.1 L (28.1%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹4.8 L+₹1.1 L (28.2%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹4.9 L+₹1.2 L (30.8%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹8.3 L+₹4.5 L (120.4%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
6 Feb 2020, 2:00 pmClosed
VARGHESE P O
DMM P AND P FACT LTD
Fabrication and Erection of discharge duct of Fume Fan B and Dryer Fan B with SS material in NP plant FACT CD, during ATA 2020.
2020_FACT_538056_1
04096/2019-2020/E20947
Limited
Miscellaneous Services
Item Rate
120 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDMCDM105A)
3 documents required · 3 mandatory
₹0
₹12,000
Yes
20 Feb 2020
22 Jan 2020
7 Feb 2020
22 Jan 2020
6 Feb 2020
22 Jan 2020
Fabrication and Erection of discharge duct of Fume Fan B and Dryer Fan B with SS material in NP plant FACT CD, during ATA 2020.
Pre fabrication of discharge ducts of Fume fan B and Dryer Fan B with SS material before ATA 2020. Work Involves: The required SS materials for the fabrication of new discharge duct of Fume fan B and Dryer Fan B shall be transported from CD stores to work site. The measurements for the fabrication of discharge ducts shall be taken from site / existing one. The new discharge duct of Fume fan B [Duct from fan discharge expansion bellow to the connecting flange to stack B] & Dryer Fan B shall be fabricated with all its inlet / outlet / required connecting flanges etc., as per the same dimensions, sizes and shapes of existing one, for proper / convenient erection. [The plate thickness of duct shall be 06 mm to 10 mm.]. Fixed / loose flange arrangements shall be fabricated with SS plates for all flanged connections. Required SS pad plates / SS supports / SS stiffeners shall be provided / welded to all connecting flanges, manholes, etc. The SS plate cutting shall be done with plasma / cutting wheel only. (Arc cutting will not be permitted ). Full weld all joints with proper fillet as per Arc welding procedure. Inside / outside edges of the cut plate shall be ground properly with suitable bevel / single Vee, where the welding is to be done. The welding of joints shall be done with full-penetration fillet weld and the root-pass shall be DP tested. (Total weight of the Ducts= 06 MT [Approx.]).
Replacement of rubber lined discharge duct of Fume fan B and Dryer Fan B with SS material, during the ATA 2020 period. Work involves: The required scaffolding, tools, tackles etc. shall be arranged at site, for the replacement of discharge duct of Fume fan B & Dryer Fan B during ATA 2020. Rubber lining shall be removed from the area (removal of rubber lining is in the scope of contactor), where the cutting is to be done. The old rubber lined duct shall be removed and transported to scrap yard after cutting the same into number of pieces for easy handling. Temporary supports shall be provided, if required. The newly pre fabricated discharge duct of Fume fan B & Dryer Fan B shall be transported to site and erect the same in position with proper / strong base support. The alignment, level, verticality etc. shall be corrected perfectly. All the flange joints shall be tightened properly and service the duct without any leak.(Total weight of the Ducts= 09 MT [Approx.]).
Fabrication / welding of MS structural support / stiffeners. work Involves: The materials, tools and tackles for the fabrication / welding of stiffeners of MS angles / channels structural supports etc. shall be transported to site. The required stiffeners of MS angles / channels shall be welded on the out side surface area / body of the fabricated SS duct. If required, the structural supports for ducts shall be strengthened / repaired.
PAREETH V V
M A ALI
NG PANICKER ENGINEERING CONTRACTOR
HASSAN MM
VIKRAMAN NAIR S
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_563562.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .