| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAdmitted-Finance | ₹6.7 L | L1 | Admitted-Finance |
| 2 | L2₹7.4 LAdmitted-Finance | ₹7.4 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical NAZRUL SARANI ASHRAM PARA SILIGURI 734001 | SILIGURI | JALPAIGURI | WEST BENGAL | 734001 | - | - | Rejected-Technical TECHNICAL BID REJECTED |
| Sl No | Description | Qty | Unit | A.R. & Co L1 | M/S DEBASISH GHOSH L2 |
|---|---|---|---|---|---|
| 1.00Description | |||||
| 1.01 | Watch and ward duty including weeding, clearing shrubs, forking, mulching and watering of trees and shrubs, topiary and planted
borders, maintenance of mexican carpet lawn and paspalum blade grass (3450 sqm approx in total) by uprooting the unwanted growth,
regular trimming, application of necessary pesticide as necessary, maintenance of vertical garden by changing of pots/ plants including
proper shaping, pruning complete in all respect as per instruction of Engineer-in-charge. This includes supply of labour, tools (as required
for gardening purpose) & plant by engaging Mali- unskilled (5 heads per day for 26 days a month for 12 months). The workers must bring in their gardening equipments such as hedge cutter, pruning shears, PVC watering pipe etc required as per scope of work and site conditions | 1,248 | DAY | 5,07,661.44 ₹5,99,040.5 | 4,80,480 ₹5,66,966.4 Lowest |
| 1.02 | Preparation of beds for hedging and shrubbery by excavating 60cm deep and trenching the excavated base to a further depth of 30cm,
refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 ( 8 parts of stacked volume of earth after
reduction by 20%, one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary watering and finally fine dressing, levelling etc., including stacking and
disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50m lift upto 1.5m
complete. This includes supply of labour, tools & plants including
materials. | 500 | SQM. | 38,135 ₹44,999.3 Lowest | 85,000 ₹1,00,300 |
| 1.03 | Supply of fuel (petrol) for Honda lawn mower for trimming of lawn etc | 100 | LTR. | 12,500 ₹12,500 Lowest | 12,500 ₹12,500 Lowest |
| 1.04 | PLANTING OF TREES ( AVENUE PLANTS) IN 0.60M DIA HOLE, 1M DEEP DUG IN THE GROUND, MIXING THE SOIL WITH DECAYED
FARM YARD/SLUDGE MANURE. THIS INCLUDES SUPPLY OF LABOUR, TOOLS & PLANTS INCLUDING MATERIALS BUT EXCLUDING COST OF TREE. Plants including materials but xcluding cost of tree | 50 | Nos. | 2,542.5 ₹3,000.15 Lowest | 8,750 ₹10,325 |
| 1.05 | SUPPLYING AND STACKING OF GOOD EARTH (ADEQUATE FOR HORTICULTURE WORK) AT SITE INCLUDING ROYALTY (EARTH
MEASURED IN STACK WILL BE REDUCED BY 20% FOR PAYMENT) Earth measured in stack will be reduced by 20% for payment | 25 | CUM. | 1,695 ₹2,000.1 Lowest | 10,000 ₹11,800 |
| 1.06 | SUPPLYING AND STACKING SLUDGE (ADEQUATE FOR HORTICULTURE WORK) AT SITE IN DRY CAKE FORM FROM APPROVED DISPOSAL WORK SITE INCLUDING ROYALTY, ALL LEAD AND LIFT ETC. (SLUDGE MEASURED IN STACK WILL BE REDUCED BY 8%). Sludge measured in stack will be reduced by 8% | 25 | CUM. | 8,475 ₹10,000.5 Lowest | 16,250 ₹19,175 |
| 1.07 | SPREADING OF SLUDGE, DUMP MANURE,/FARM YARD MANURE/ANIMEL DUNG MANURE AND GOOD EARTH IN REQUIRED THICKNESS. THIS INCLUDES SUPPLY OF LABOUR, TOOLS & PLANTS EXCLUDING MATERIALS. Includes supply of labour, tools & plants excluding materials. | 3,450 | SQM. | - | 13,800 ₹16,284 Lowest |
Tender Value
₹7.6 L
EMD Value
₹7,500
Closing Date
28 May 2026, 3:00 pmClosed
GM(COM)
WEBEL BHAVAN
NIT
2026_WEBEL_1024432_1
WEBEL/ EOT/W/25-26/000109 (RE TENDER 2ND CALL)
Open Tender
Miscellaneous Services
Item Wise
30 days
WEST BENGAL
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹7,500
Yes
14 Aug 2026
18 May 2026
1 Jun 2026
18 May 2026
28 May 2026
18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description | |||||
| 1.01 | Watch and ward duty including weeding, clearing shrubs, forking, mulching and watering of trees and shrubs, topiary and planted
borders, maintenance of mexican carpet lawn and paspalum blade grass (3450 sqm approx in total) by uprooting the unwanted growth,
regular trimming, application of necessary pesticide as necessary, maintenance of vertical garden by changing of pots/ plants including
proper shaping, pruning complete in all respect as per instruction of Engineer-in-charge. This includes supply of labour, tools (as required
for gardening purpose) & plant by engaging Mali- unskilled (5 heads per day for 26 days a month for 12 months). The workers must bring in their gardening equipments such as hedge cutter, pruning shears, PVC watering pipe etc required as per scope of work and site conditions | 1,248 | DAY | - | - |
| 1.02 | Preparation of beds for hedging and shrubbery by excavating 60cm deep and trenching the excavated base to a further depth of 30cm,
refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 ( 8 parts of stacked volume of earth after
reduction by 20%, one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary watering and finally fine dressing, levelling etc., including stacking and
disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50m lift upto 1.5m
complete. This includes supply of labour, tools & plants including
materials. | 500 | SQM. | - | - |
| 1.03 | Supply of fuel (petrol) for Honda lawn mower for trimming of lawn etc | 100 | LTR. | - | - |
| 1.04 | PLANTING OF TREES ( AVENUE PLANTS) IN 0.60M DIA HOLE, 1M DEEP DUG IN THE GROUND, MIXING THE SOIL WITH DECAYED
FARM YARD/SLUDGE MANURE. THIS INCLUDES SUPPLY OF LABOUR, TOOLS & PLANTS INCLUDING MATERIALS BUT EXCLUDING COST OF TREE. Plants including materials but xcluding cost of tree | 50 | Nos. | - | - |
| 1.05 | SUPPLYING AND STACKING OF GOOD EARTH (ADEQUATE FOR HORTICULTURE WORK) AT SITE INCLUDING ROYALTY (EARTH
MEASURED IN STACK WILL BE REDUCED BY 20% FOR PAYMENT) Earth measured in stack will be reduced by 20% for payment | 25 | CUM. | - | - |
| 1.06 | SUPPLYING AND STACKING SLUDGE (ADEQUATE FOR HORTICULTURE WORK) AT SITE IN DRY CAKE FORM FROM APPROVED DISPOSAL WORK SITE INCLUDING ROYALTY, ALL LEAD AND LIFT ETC. (SLUDGE MEASURED IN STACK WILL BE REDUCED BY 8%). Sludge measured in stack will be reduced by 8% | 25 | CUM. | - | - |
| 1.07 | SPREADING OF SLUDGE, DUMP MANURE,/FARM YARD MANURE/ANIMEL DUNG MANURE AND GOOD EARTH IN REQUIRED THICKNESS. THIS INCLUDES SUPPLY OF LABOUR, TOOLS & PLANTS EXCLUDING MATERIALS. Includes supply of labour, tools & plants excluding materials. | 3,450 | SQM. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.52 MB
BOQ_2517688.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].