Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹1.1 Cr+₹6.4 L (6.20%)Rejected-Finance NEAR DON BOSCO SCHOOL MORE NA ATALIKA APARTMENT SEVOKE ROAD SILIGURI PIN 734001 WB | SILIGURI | DARJEELING | WEST BENGAL | 734001 | ₹1.1 Cr+₹6.4 L (6.20%) | L2 | Rejected-Finance OTHER THAN LOWEST BIDDER |
| 3 | L3₹1.1 Cr+₹7.7 L (7.49%)Rejected-Finance | ₹1.1 Cr+₹7.7 L (7.49%) | L3 | Rejected-Finance OTHER THAN LOWEST BIDDER |
Tender Value
₹1.1 Cr
EMD Value
₹1.8 L
Closing Date
2 Apr 2021, 6:00 pmClosed
CWE BINNAGURI
HQ CWE BINNAGURI
OUTSOURCING SERVICES FOR MAINT AND OPERATION OF VARIOUS WATER SUPPLY INSTALLATIONS AT BINNAGURI MIL STN UNDER GE (S) BINNAGURI
2021_MES_420286_3
8010/BIN/(S)/83 OF 2020-21
Open Tender
Manpower Supply
Item Rate
330 days
BINNAGURI MIL STN
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹1,000
GE SOUTH BINNAGURI
₹1.8 L
Yes
23 Apr 2021
18 Mar 2021
3 Apr 2021
18 Mar 2021
2 Apr 2021
19 Mar 2021
Amount
NOTE FOR SCHEDULE 'A' (BOQ) Maintenance and operation of submersible pumping set at Pump House No 01 of capactity upto 45 HP by operating the installed machinery and equipment i.e . Altoch GP chlorine dosing plant, LT pannel, Voltage stabilizers,DG Sets, ATS starters and its connected accessories in a shift of 08 hours round the clock for the type/capacity of pumping sets in each shift including operation of control valves and rectifying minor defects (like gland leaking,loose nut & bolt,inspection of panel, etc )for smooth and trouble free operation(Consider 03 shift in a day by deploing pump operator) , Shift No-1 (0600 Hrs to 1400 Hrs FGM/Semi Skilled), Shift No-2 (1400 Hrs to 2200 Hrs FGM/Semi Skilled), Shift No-3 (2200 Hrs to 0600 Hrs Un Skilled ) all as specified and as directed by Engineer-in-Charge. Man power to be provided :2 semi skilled and 01 unskilled per day NOTE-: (a).Cleaning of entire area pump house and cutting of grass from the Roots & keeping permises in hygine condition . (b). Duty Roster shall be prepared in advance for each month duly signed by the duty contractor & Engineer in Charge & display in each pump house showing the person on duty in each shift including the reliever for off duty as per Labour Act. (c). Operation & maint of chlorine dosing pump to ensure super chlorination of water.Residual chlorine is to be checked & recorded in register before supply of water. (d).Operation of DG Set in case of failure of Elect supply . (e). Operation & maint of all plants such as iron removal , chlorine dozer etc including back washing to get clean water. (f).Log sheets to be maintain of all equipiments pump house wise in standrad proforma to make record in consultation with Engineer-in-Charge. (330 Daysx3 Shift) = 990 NOTE :- 1) RATES QUOTED SHOULD BE INCLUSIVE OF ALL TAXES, CESS, LEVIES INCLUDING GST AS APPLICABLE.IF RATES QUOTED BY BIDDER UNDER ANY ITEM / SUBITEM IS FOUND LESS THAN THE PREVALENT STATUATORY RATES SUCH BIDS SHALL BE DECLARED NON BONAFIDE. 2) ANY VARIATION IN TAX ( INCL VARIATION IN GST RATE )SHALL BE ADJUSTED AND REIMBURSED TO/RECOVERED FROM THE CONTRACTOR. 3) PAYMENT SHALL BE MADE ONLY AFTER SUBMISSION OF VALID AND AUTHENTIC DOCUMENT IN SUPPORT OF HAVING PAID THE REQUISITE AMOUNT ( OF WAGES, EPF, BONUS& ESIC) TO ALL WORKMEN/CONCERNED DEPARTMENT. 4) MONTHLY WAGES SHALL BE PAID BY THE CONTRACTOR TO WORKMEN ONLY ONLINE . PROOF OF STATUATORY DEDUCTION IN FAVOUR OF WORKERS SHALL BE SUBMITTED BY THE CONTRACTOR TO GE. CONTRACTOR HAS TO SUBMIT VALID LABOUR LICENSE FROM LABOUR COMMISSIONER WITHIN 15 DAYS OF COMMENCEMENT OF WORK. 5) .IF RATES QUOTED BY THE CONTRACTOR WORKS OUT TO MORE THAM TWO DIGITS AFTER DECIMAL THEN SAME WILL BE ROUNDED OFF IN ACCORDANCE TO IS 02 OF 1960 (REVISED 2016) OF BIS
All as per Ser item No 1.00 here-in-above but PH No 05 of capacity up to 45 HP
All as per Ser item No 1.00 here-in-above but PH No 21 & PH No-22(Map) of capacity up to 45 HP
All as per Ser item No 1.00 here-in-above but MAP PH-II pump House SZ (PH-23) & PH No-04 of capacity up to 45 HP
All as per Ser item No 1.00 here-in-above but PH No 07 of capacity up to 45 HP
All as per Ser item No 1.00 here-in-above but PH No 08 & PH No-25 (Old MAP) of capacity up to 45 HP
All as per Ser item No 1.00 here-in-above but PH No 19 & PH No-12 of capacity up to 45 HP
All as per Ser item No 1.00 here-in-above but PH No 09 & 24 of capacity up to 45 HP
All as per Ser item No 1.00 here-in-above but PH No 10 & PH No-18 of capacity up to 45 HP
All as per Ser item No 1.00 here-in-above but PH No 13 & PH No-26(MAP) of capacity up to 45 HP
All as per Ser item No 1.00 here-in-above but PH No-15 of capacity up to 45 HP
All as per Ser item No 1.00 here-in-above but PH No-16 of capacity up to 45 HP
All as per Ser item No 1.00 here-in-above but PH No-20 of capacity up to 45 HP
Maintenance and operation of Fire fighting pump House & equipiment ,Pump House AP Telepara of capactity upto 45 HP by operating the installed machinery and equipment i.e . Altoch GP chlorine dosing plant, LT pannel, Voltage stabilizers,DG Sets, ATS starters and its connected accessories in a shift of 08 hours round the clock for the type/capacity of pumping sets in each shift including operation of control valves and rectifying minor defects (like gland leaking,loose nut & bolt,inspection of panel, etc ) for smooth and trouble free operation (Consider 03 shift in a day by deploing pump operator) , Shift No-1 (0600 Hrs to 1400 Hrs FGM/Semi Skilled & Un Skilled Helper ), Shift No-2 (1400 Hrs to 2200 Hrs FGM/Semi Skilled & Un Skilled Helper ), Shift No-3 (2200 Hrs to 0600 Hrs FGM/Semi Skilled & Un Skilled Helper ) all as specified and as directed by Engineer-in-Charge. Man power to be provided :03 semi skilled and 03 unskilled per day NOTE-: (a).Cleaning of entire area pump house and cutting of grass from the Roots & keeping permises in hygine condition . (b). Duty Roster shall be prepared in advance for each month duly signed by the duty contractor & Engineer in Charge & display in each pump house showing the person on duty in each shift including the reliever for off duty as per Labour Act. (c). Operation & maint of chlorine dosing pump to ensure super chlorination of water.Residual chlorine is to be checked & recorded in register before supply of water. (d).Operation of DG Set in case of failure of Elect supply . (e). Operation & maint of all plants such as iron removal , chlorine dozer etc including back washing to get clean water. (f).Log sheets to be maintain of all equipiments pump house wise in standrad proforma to make record in consultation with Engineer-in-Charge. NOTE :- 1) RATES QUOTED SHOULD BE INCLUSIVE OF ALL TAXES, CESS, LEVIES INCLUDING GST AS APPLICABLE.IF RATES QUOTED BY BIDDER UNDER ANY ITEM / SUBITEM IS FOUND LESS THAN THE PREVALENT STATUATORY RATES SUCH BIDS SHALL BE DECLARED NON BONAFIDE. 2) ANY VARIATION IN TAX ( INCL VARIATION IN GST RATE )SHALL BE ADJUSTED AND REIMBURSED TO/RECOVERED FROM THE CONTRACTOR. 3) PAYMENT SHALL BE MADE ONLY AFTER SUBMISSION OF VALID AND AUTHENTIC DOCUMENT IN SUPPORT OF HAVING PAID THE REQUISITE AMOUNT ( OF WAGES, EPF, BONUS& ESIC) TO ALL WORKMEN/CONCERNED DEPARTMENT. 4) MONTHLY WAGES SHALL BE PAID BY THE CONTRACTOR TO WORKMEN ONLY ONLINE . PROOF OF STATUATORY DEDUCTION IN FAVOUR OF WORKERS SHALL BE SUBMITTED BY THE CONTRACTOR TO GE. CONTRACTOR HAS TO SUBMIT VALID LABOUR LICENSE FROM LABOUR COMMISSIONER WITHIN 15 DAYS OF COMMENCEMENT OF WORK. 5) .IF RATES QUOTED BY THE CONTRACTOR WORKS OUT TO MORE THAM TWO DIGITS AFTER DECIMAL THEN SAME WILL BE ROUNDED OFF IN ACCORDANCE TO IS 02 OF 1960 (REVISED 2016) OF BIS
M/S AHUJA TRADING
M/s Debendra Prasad Gupta
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .