| 1 | L1₹3.3 CrAccepted-AOC 245 2 RAJPUR ROAD OPPOSITE HOTEL MADHUBAN DEHRADUN | ₹3.3 Cr | L1 | Accepted-AOC QUALIFIED |
| 2 | L2₹3.3 Cr+₹16,574.20 (0.05%)Rejected-Finance | ₹3.3 Cr+₹16,574.20 (0.05%) | L2 | Rejected-Finance NOT QUALIFIED |
| 3 | L3₹3.3 Cr+₹18,051.70 (0.05%)Rejected-Finance A 3 332 SECTOR 08 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | ₹3.3 Cr+₹18,051.70 (0.05%) | L3 | Rejected-Finance NOT QUALIFIED |
Tender Value
Refer Docs
EMD Value
₹6.7 L
Closing Date
7 Jan 2025, 12:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER, EDC KARANPRAYAG
Construction of new 11 KV line from Rudra Point to Shri Kedarnath with 1X3 MVA CSS Under EDD, Rudraprayag on Semi-Turnkey Basis
2024_UPCL4_78942_1
25/EDC(K)/2024-25
Open Tender
Construction Works
Item Rate
180 days
RU
AS PER NIT
3 documents required · 3 mandatory
₹17,700
EE EDD GOPESHWAR
₹6.7 L
27 May 2025
20 Dec 2024
8 Jan 2025
20 Dec 2024
7 Jan 2025
21 Dec 2024
SUPPLY OF MATERIAL PORTION
1000 KVA TRANSFORMER
Nut & Bolts
STAY CLAMP FOR SP-23 WITH NUT & BOLT
EARTH WIRE CLAMP FOR SP-23 WITH N/B
PP & CLAMP WITH N&B ST POLE SP-23
BRACING CLAMP TOP FOR SP-23 WITH N/B
BRACING CLAMP BOTTOM FOR SP-23 WITH N/B
LABOUR PORTION
SPECIAL EARTHING
CHEMICAL EARTHING
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF 11 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-23 POLE
ERECTION OF SP-23 DOUBLE POLE
ERECTION OF SP-23 FOUR POLE
GROUTING OF POLE
INSTALLATION OF HT PRMC
PAINTING OF SP-21/23 POLE
EXCAVATION OF EARTH FOR DTR PLINTH
CEMENT CONCRETING WORK DTR PLINTH
RR MASSONARY WORK FOR DTR PLINTH
FIXING OF TPMO
LAYING OF DOG CONDUCTOR IN HT LINE
GUARDING OF LT/11 KV LINE
CONST.,INST.OF DANGER BOARD/ NUMBER PLATE
CARTAGE SP-21/23 POLE, 150-200KM
CARTAGE OF PETTY MATERIAL,150-200KM
CARTAGE,630/1000 KVA DTR,150-200KM
CARTAGE 33/11 CT/PT/ISOLATOR, 150-200KM
FIXING OF END TERM. J/KIT 3X120 SQMM O/D
Laying of 11KV Cable in Trench all work
LAYING OF O/H 11KV CABLE 3Cx120 SQMM
PROVIDING AND FIXING OF FENCING FOR CSS
HEADLOAD CARTAGE OF PETTY MATERIAL 16KM
HEADLOAD CARTAGE SP- 23 POLE 16 KM
ERECTION, TESTING & COMM. OF 1000KVA CSS
SUPPLY, ERECTION LIGHTNING PROT. SYSTEM
MS BAR 8,10,12MM & BENDING WIRE FOR CSS
AMC OF CSS FOR FIVE YEARS
DISMANTELING ETC & ASSEMBLING ETC OF CSS
Composite Engineers (BID ID -355179)
Creative Entrepreneurs LLP (BID ID -354873)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .