Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 104 EAST MADHA CHURCH STREET ROYAOURAM CHENNAI TAMIL NADU 600024 | CHENNAI | TAMIL NADU | 600024 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
1 Apr 2026, 11:00 amClosed
SM(SRC-OS)
HSL
OVERHAULING OF AIR COMPRESSORS UNDER OEM SUPERVISION.ON INS PROJECT
2026_HSL_99232_1
SR COMPLEX/PRODUCTION/OUT SOURCEREQUISITION/2025/913
Open Tender
Miscellaneous Services
Service
30 days
VISAKHAPATNAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹30,000
Yes
27 Mar 2026
18 Mar 2026
1 Apr 2026
18 Mar 2026
1 Apr 2026
18 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0HP AIR COMPRESSOR Make - BURCKHARDT,Model - S5W212L,MT - 35172 Skilled manpower to be deployed to carry out the following HP AIR Compressor overhauling works,and satisfactory trials to be shown to the ship/naval trial agencies | |||||
| 1A) HPAC MER-35183,HP AIR COMPRESSOR Make - BURCKHARDT,Model - S5W212L,MT - 35172 | |||||
| 1.1 | Check set points of all safety trips:
(a) High lub.oil temperature switch (Set Point - 80 C), Qty - 01
(b) High water temperature switch (Set Point - 54 C), Qty -01
(c) High discharge air temperature switch (Set Point - 20.5 C), Qty - 01
(d) Low lub oil pressure switch (Set Point - 2.5 bar), Qty - 01
(e) High discharge air switch (Set Point - 215 bar ), Qty -01
(f ) Low water pressure switch (Set Point - 1.4 bar), Qty -01 | 6 | NOS | - | - |
| 1.2 | Check mechanical seal of water pump. Check the thickness of carbon ring, replace if worn more than 3 mm. (Part No of mechanical seal of water pump - 129 002 300 654) | 1 | Nos | - | - |
| 1.3 | Replace crankshaft oil seals if found damaged. ( Crank Oil Seal - 129 086 505 101) | 1 | Nos | - | - |
| 1.4 | Before assembly of cylinder head check oil throw from the cylinders. On completion assemble with new cylinder head gaskets | 1 | Nos | - | - |
| 1.5 | Clean lub oil cooler. Pressure test on completion. Inspect and replace elastomers during assembling. (Working Pressure : 3 to 6 bar) | 1 | Nos | - | - |
| 1.6 | Replace all piston rings and oil scrapper rings.
(a) Ist Stage (129 000 801 603) ,Qty - 10
(b) IInd Stage (129 000 801 903) , Qty - 5
(c) IIIrd Stage (129 000 803 003) , Qty - 8
(d) IVth Stage (129 000 804 103) , Qty - 10
(e) Vth Stage (129 000 805 005), Qty - 12 | 45 | Nos | - | - |
| 1.7 | Check cylinder liners and cylinder bore for wear. Replace defective liners | 6 | Nos | - | - |
| 1.8 | Check weardown of Main Bearings and Con Rod Bearings.
Note: Replace if weardown is beyond permissible limit.
(a) Main bearing (129 002 300 116) , Qty - 04
(b) Big end bearing (129 002 300 303) , Qty - 03
(c) Needle Roller Bearing (129 002 300 306) , Qty - 03
(d) Big end bearing dowell (129 002 300 305), Qty - 06 | 16 | Nos | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_108810.xls
BOQ • 0.30 MB
TBID_913.pdf
Tender Documents • 0.41 MB
ANNEXURE.pdf
Tender Documents • 0.44 MB
DUE_DATE_EXTENSION.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .