Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance B T KAWADE ROAD MUNDHWA PUNE MAHARASHTRA 411036 | PUNE | MAHARASHTRA | 411036 | Admitted-Finance |
| 2 | Admitted-Finance D NO 40 9 94 SAI NAGAR VENNELA HOSPITAL ROAD SAI NAGAR AREA KRISHNA ANDHRA PRADESH 520008 | NTR | ANDHRA PRADESH | 520008 | Admitted-Finance |
| 3 | Rejected-Technical PLOT NO 23C 23D SY NO 240 INDUSTRIAL PARK VAKALAPUDI KAKINADA RURAL KAKINADA ANDHRA PRADESH 533005 | KAKINADA | ANDHRA PRADESH | 533005 | Rejected-Technical The submitted experience documents is not relevant to GT jobs. |
| 4 | Rejected-Technical MARINE CORPORATION OF INDIA PROP ANAND SHIP CARE INSTITUTE PVT LTD 25 9 14 MARINE TOWERS RAJAVARI VEEDHI VISAKHAPATNAM | Rejected-Technical The submitted experience documents is not relevant to GT jobs. |
Tender Value
Refer Docs
Closing Date
25 Jun 2024, 3:00 pmClosed
DEPUTY GENERAL MANGER, SRM
Ship Repair Materials Department Cochin Shipyard Limited Kochi-682015 Kerala, India
TURNKEY JOB OF GAS TURBINE-FER/AER (GT) FOR NAVY VESSELS
2024_CSL_196836_1
CSL/SRM3/ADV092-93
Open Tender
Marine Services
Turn-key
270 days
Cochin
Please refer tender documents
2 documents required · 2 mandatory
₹0
Exempted
26 Jul 2024
30 May 2024
26 Jun 2024
30 May 2024
25 Jun 2024
30 May 2024
30 May 2024 - 24 Jun 2024
Amount
Scope 1 - Turnkey Job of Gas Turbine-FER/AER (GT) - (RM.0788)
UNDERATKE OVERHAUL OF FUEL BOOST PUMPS (QTY 02) AS FOLLOWS: -
OVERHAUL PUMP UNIT. GAUGE AXIAL AND DIAMETRICAL CLEARANCES. RENEW CONSUMABLE, BEARING, SEALS AND WORN OUT PARTS - Service Cost
OVERHAUL PUMP UNIT. GAUGE AXIAL AND DIAMETRICAL CLEARANCES. RENEW CONSUMABLE, BEARING, SEALS AND WORN OUT PARTS - Material Cost
REPLACE BY-PASS AND PRESSURE REGULATING VALVES AND OFFER FUNCTIONL TRIALS.- Service Cost
REPLACE BY-PASS AND PRESSURE REGULATING VALVES AND OFFER FUNCTIONL TRIALS.- Material Cost
OVERHAUL AND REFIT SUCTION AND DISCHARGE VALVES. .- Service Cost
OVERHAUL AND REFIT SUCTION AND DISCHARGE VALVES. - Material Cost
RENEW FOUNATION ALONG WITH SV MOUNTS.- Service Cost
RENEW FOUNATION ALONG WITH SV MOUNTS-- Material Cost
CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS(SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION/SPM CHECKS ON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. - Service Cost
CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS(SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION/SPM CHECKS ON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC - Material Cost
UNDERTAKE OVERHAUL OF GT & RG LUB OIL SYSTEM AS FOLLOWS: -
DISMANTLE LUB OIL PUMP. EXAMINE ALL PARTS FOR WEAR. RENEW CONSUMABLE, SEAL, BEARING AND WORN OUT PARTS.- Service Cost
DISMANTLE LUB OIL PUMP. EXAMINE ALL PARTS FOR WEAR. RENEW CONSUMABLE, SEAL, BEARING AND WORN OUT PARTS. -Material Cost
EXAMINE PUMP ROTOR AND CHECK FOR FREEDOM OF MOVEMENT. - Service Cost
EXAMINE PUMP ROTOR AND CHECK FOR FREEDOM OF MOVEMENT. -Material Cost
REPLACE RELIEF VALVE. CARRY OUT FUNCTIONAL TEST AND RESET TO SPECIFIED LIFTING - CostPRESSURE.- Service Cost
REPLACE RELIEF VALVE. CARRY OUT FUNCTIONAL TEST AND RESET TO SPECIFIED LIFTING PRESSURE.--Material Cost
OFFER SYSTEM TRIALS AS PER IN STANDARDS INCLUDING SEA TRIALS AND PROVE SYSTEM - Service Cost
OFFER SYSTEM TRIALS AS PER IN STANDARDS INCLUDING SEA TRIALS AND PROVE SYSTEM -Material Cost
CARRY OUT THE MAJOR OVERHAUL OF THE GT/ RG COOLING SYSTEM (DD RELATED) AS FOLLOWS:-
CARRY OUT CHEMICAL CLEANING AND PRESSURE TESTING OF LUB OIL COOLERS. WARNING- 1. THE CHEMICAL AGENT TO BE USED IS AS FOLLOWS- LUB OIL SIDE-5 KGS CAUSTIC SODA GOST 2263-79 IN 100 LTRS OF HOT WATER AT 93 DEGREE C FOR ONE HOUR. SEA WATER SIDE-5PERCENTCOMMERCIAL HYDROCHLORIC ACID WITH SIX PARTS OF WATER AT 60 DEGREE C ADDED WITH- A OXALIC ACID SOLUTION GOST 22180-76 210 GMS PER 10 LTRS OF SOLUTION OR B CARPUTERS GLUE 5 PERCENT BY WEIGHT. FOR ALL GT RG COOLERS - Service Cost
CARRY OUT CHEMICAL CLEANING AND PRESSURE TESTING OF LUB OIL COOLERS. WARNING- 1. THE CHEMICAL AGENT TO BE USED IS AS FOLLOWS- LUB OIL SIDE-5 KGS CAUSTIC SODA GOST 2263-79 IN 100 LTRS OF HOT WATER AT 93 DEGREE C FOR ONE HOUR. SEA WATER SIDE-5PERCENTCOMMERCIAL HYDROCHLORIC ACID WITH SIX PARTS OF WATER AT 60 DEGREE C ADDED WITH- A OXALIC ACID SOLUTION GOST 22180-76 210 GMS PER 10 LTRS OF SOLUTION OR B CARPUTERS GLUE 5 PERCENT BY WEIGHT. FOR ALL GT RG COOLERS -Material Cost
RENEW FLOW DUCT OF WATER SCOOP AND RE-PAINT FOR ALL GT RG COOLERS.- Service Cost
RENEW FLOW DUCT OF WATER SCOOP AND RE-PAINT FOR ALL GT RG COOLERS.-Material Cost
ENSURE WATERSCOOP ELECTRICALLY INSULATED FROM SYSTEM PIPING. RENEW PARONITE GASKET, SPACER AND BUSHING TO ACHIEVE PROPER INSULATION. FOR ALL GT RG COOLERS - Service Cost
ENSURE WATERSCOOP ELECTRICALLY INSULATED FROM SYSTEM PIPING. RENEW PARONITE GASKET, SPACER AND BUSHING TO ACHIEVE PROPER INSULATION. FOR ALL GT RG COOLERS -Material Cost
RENEW SCOOP SECURING STUDS FOR ALL GT RG COOLERS (MAT - SS) - Service Cost
RENEW SCOOP SECURING STUDS FOR ALL GT RG COOLERS (MAT - SS) -Material Cost
UNDERTAKE PAINTING OF SYSTEM PIPES FOR ALL GT RG COOLERS - Service Cost
UNDERTAKE PAINTING OF SYSTEM PIPES FOR ALL GT RG COOLERS -Material Cost
OPEN CAVITY OF SCOOP HOUSING AND RENEW EPOXY COMPOUND FOR ALL SCOOPS - Service Cost
OPEN CAVITY OF SCOOP HOUSING AND RENEW EPOXY COMPOUND FOR ALL SCOOPS -Material Cost
OVERHAUL AND REFIT SYSTEM VALVES/COCKS. - Service Cost
OVERHAUL AND REFIT SYSTEM VALVES/COCKS. -Material Cost
OVERHAUL AND PRESSURE TEST SCOOP VALVES (150MM FLAP TYPE VALVE), ASSOCIATED HYDRUALIC RAM AND ALIGN MICROSWITCH, RENEW ALL CONSUMABLE 'O' RINGS AND SEALS - Service Cost
OVERHAUL AND PRESSURE TEST SCOOP VALVES (150MM FLAP TYPE VALVE), ASSOCIATED HYDRUALIC RAM AND ALIGN MICROSWITCH, RENEW ALL CONSUMABLE 'O' RINGS AND SEALS -Material Cost
CHEMICALLY CLEAN 04 'Y' PIECES , PRESSURE TEST AND REPAIR IF REQUIRED - Service Cost
CHEMICALLY CLEAN 04 'Y' PIECES , PRESSURE TEST AND REPAIR IF REQUIRED -Material Cost
RENEW SEA TUBE DISTANCE PIECES AND TO BE PRESSURE TESTED FOR ALL GT RG COOLERS - Service Cost
RENEW SEA TUBE DISTANCE PIECES AND TO BE PRESSURE TESTED FOR ALL GT RG COOLERS -Material Cost
CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS(SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION/SPM CHECKS ON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. - Service Cost
CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS(SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION/SPM CHECKS ON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. -Material Cost
UNDERTAKE FOLLOWING ON BOOST GT EXHAUST HYDRAULIC SYSTEM:
REPLACE HYDRAULIC PUMP UNIT WITH MOTOR. Only pump unit(gear type /positive displacement pump) to be replaced - Service Cost
REPLACE HYDRAULIC PUMP UNIT WITH MOTOR. Only pump unit(gear type /positive displacement pump) to be replaced -Material Cost
REPLACE (WITH NEW) ALL SV MOUNTINGS. - Service Cost
REPLACE (WITH NEW) ALL SV MOUNTINGS. -Material Cost
CARRY OUT PERFORMANCE TRIAL OF THE SYSTEM INCLUDING PARAMETER CHECKS(SUCTION/ DISCHARGE PRESSURE), VIBRATION TRIALS TO RELEVANT IN AGENCY (MTU/GTTT/SS) - Service Cost
CARRY OUT PERFORMANCE TRIAL OF THE SYSTEM INCLUDING PARAMETER CHECKS(SUCTION/ DISCHARGE PRESSURE), VIBRATION TRIALS TO RELEVANT IN AGENCY (MTU/GTTT/SS) -Material Cost
OIL LEAK OBSERVED FROM HYDRAULIC OIL TANK. UNDERTAKE RENEWAL FOLLOWED BY PRESSURE TESTING. MS tank, capacity 20 ltr - Service Cost
OIL LEAK OBSERVED FROM HYDRAULIC OIL TANK. UNDERTAKE RENEWAL FOLLOWED BY PRESSURE TESTING. MS tank, capacity 20 ltr -Material Cost
EXHAUST DOOR LOCKING HOOKS AND BRACKET CORRODED DUE TO SEA WATER. MANUFACTURE AND REPLACED AS PER SAMPLE/ GAUGING. MAT-SS - Service Cost
EXHAUST DOOR LOCKING HOOKS AND BRACKET CORRODED DUE TO SEA WATER. MANUFACTURE AND REPLACED AS PER SAMPLE/ GAUGING. MAT-SS -Material Cost
LEAKAGE OBSERVED FROM THE SIDES OF HYRAULIC RAMS. UNDERTAKE OVERHAUL OF RAMS. REPLACE CONSUMABLES, SEALS. - Service Cost
LEAKAGE OBSERVED FROM THE SIDES OF HYRAULIC RAMS. UNDERTAKE OVERHAUL OF RAMS. REPLACE CONSUMABLES, SEALS. -Material Cost
HYDRAULIC FILTERS CHOCKED. REPLACE AS PER SAMPLE - Service Cost
HYDRAULIC FILTERS CHOCKED. REPLACE AS PER SAMPLE -Material Cost
UNDERTAKE INSITU THREADING OF GREASE CUP POINTS IN VIEW OF THREADED OFF - Service Cost
UNDERTAKE INSITU THREADING OF GREASE CUP POINTS IN VIEW OF THREADED OFF -Material Cost
OVERHAUL AND TRIALS OF HAND PUMP - Service Cost
OVERHAUL AND TRIALS OF HAND PUMP -Material Cost
REPAIR OF BGT EXHAUST DOOR BEADING, SEA WATER INGRESS OBSERVED ACROSS THE BOOST DOOR BEADING - Service Cost
REPAIR OF BGT EXHAUST DOOR BEADING, SEA WATER INGRESS OBSERVED ACROSS THE BOOST DOOR BEADING -Material Cost
BOOST DOORS DEFOREMED. UNDERTAKE RENEWAL OF DOOR Approx 6ft dia, as per sample, mat- MS - Service Cost
BOOST DOORS DEFOREMED. UNDERTAKE RENEWAL OF DOOR Approx 6ft dia, as per sample, mat- MS -Material Cost
REMOVE AND REINSTALL COMPLETE GT AGGREGATE (04 GTs AND 04 RGs)
REMOVE AND REINSTALL COMPLETE GT AGGREGATE (04 GTs AND 04 RGs) FOR : - (III) OLD UNITS WILL BE REINSTALLED AS IT IS. (05 OUT OF 08 GTA UNITS WILL BE REPLACED WITH NEW UNITS, THE 05 OLD GTA UNITS BEING REPLACED ARE TO BE PACKAGED AND TRANSPORTED BACK TO MO(MBI) - Service Cost
REMOVE AND REINSTALL COMPLETE GT AGGREGATE (04 GTs AND 04 RGs) FOR : - (III) OLD UNITS WILL BE REINSTALLED AS IT IS. (05 OUT OF 08 GTA UNITS WILL BE REPLACED WITH NEW UNITS, THE 05 OLD GTA UNITS BEING REPLACED ARE TO BE PACKAGED AND TRANSPORTED BACK TO MO(MBI) -Material Cost
GT AIR INTAKE SYSTEM AER/FER
UNDERTAKE COMPLETE RENEWAL GT AIR INTAKE SYSTEM FOR CRUISE AND BOOST GTs INCLUDING BELL MOUTH, FILTER TRAYS, ULTRA SONIC FILTERS, COWLING PIECES ETC. VIEW Material Cost DETERIORATION OVER PROLONGED Service Cost LIFE (I.A.W. HQWNC POLICY DIRECTIVES) (MAT - AL) - Service Cost
UNDERTAKE COMPLETE RENEWAL GT AIR INTAKE SYSTEM FOR CRUISE AND BOOST GTs INCLUDING BELL MOUTH, FILTER TRAYS, ULTRA SONIC FILTERS, COWLING PIECES ETC. VIEW Material Cost DETERIORATION OVER PROLONGED Service Cost LIFE (I.A.W. HQWNC POLICY DIRECTIVES) (MAT - AL) -Material Cost
UNDERTAKE OVERHAUL/ ROUTINES OF MAIN RGs AS FOLLOWS:-
EXAMINE MANIPULATOR FILTER SEALING SPHERE FOR DENTS, CRACKS AND BURRS. RENEW SEALING SPHERE (PROCESS CHART ART. 3.16 REFERS). - Service Cost
EXAMINE MANIPULATOR FILTER SEALING SPHERE FOR DENTS, CRACKS AND BURRS. RENEW SEALING SPHERE (PROCESS CHART ART. 3.16 REFERS). -Material Cost
INSPECT LINE FILTERS. (PROCESS CHART 3.5 REFERS). - Service Cost
INSPECT LINE FILTERS. (PROCESS CHART 3.5 REFERS). -Material Cost
OVERHAL AND REFIT ALL AIR REDUCERS AND AIR VALVES OF PNEUMATIC SYSTEM FOR FRICTION COUPLINGS AND JAW COUPLINGS. - Service Cost
OVERHAL AND REFIT ALL AIR REDUCERS AND AIR VALVES OF PNEUMATIC SYSTEM FOR FRICTION COUPLINGS AND JAW COUPLINGS. - Material Cost
MGT FUEL OIL SYSTEM (GT CRUISE/ BOOST) AER/FER
OVERHAUL H.P AIR RESERVOIRS. EXAMINE AND CARRY OUT PROOF TEST (BR 3000 ART- 2341.8 REFERS) TO 1.5 TIMES THE WORKING PRESSURE. - Service Cost
OVERHAUL H.P AIR RESERVOIRS. EXAMINE AND CARRY OUT PROOF TEST (BR 3000 ART- 2341.8 REFERS) TO 1.5 TIMES THE WORKING PRESSURE. - Material Cost
OVERHAUL AND REFIT SYSTEM VALVES - Service Cost
OVERHAUL AND REFIT SYSTEM VALVES - Material Cost
TEST AND RESET ALL RELIEF VALVES AS NECESSARY (BR 3000 ART-2303.2 REFERS). - Service Cost
TEST AND RESET ALL RELIEF VALVES AS NECESSARY (BR 3000 ART-2303.2 REFERS). - Material Cost
OVERHAUL AND REFIT SYSTEM VALVES - Service Cost
OVERHAUL AND REFIT SYSTEM VALVES - Material Cost
OVERHAUL AND REFIT FUEL TANK VALVES. REPLACE 50% DEFECTIVE - Service Cost
OVERHAUL AND REFIT FUEL TANK VALVES. REPLACE 50% DEFECTIVE - Material Cost
MGT FUEL PRESSURE REGULATOR AER/FER
FUEL PRESSURE FLUCTUATING. UNDERTAKE OVERHAULING/Service CostABILITY CHECKS OF RDT VIEW MALFUNCTIONING. - Service Cost
FUEL PRESSURE FLUCTUATING. UNDERTAKE OVERHAULING/Service CostABILITY CHECKS OF RDT VIEW MALFUNCTIONING. - Material Cost
UNDERTAKE OVERHAUL/ ROUTINES OF MGT EXHAUST IN BOTH E/R AS FOLLOWS:-
CHECK AND ENSURE THAT BY PASS COVERS ARE FIRMLY FITTED AGAINST THEIR SEATS. RENEW RUBBER SEALS IF NECESSARY. NOTE:- FOR MAINTENANCE DURING NBC DEFENCE MODE AND UNDER PARTICULAR CONDITION, FOLLOW THE PROCEDURE AS PRESCRIBED IN INSTRUCTION BOOK ART 2.4 AND 2.9. - Service Cost
CHECK AND ENSURE THAT BY PASS COVERS ARE FIRMLY FITTED AGAINST THEIR SEATS. RENEW RUBBER SEALS IF NECESSARY. NOTE:- FOR MAINTENANCE DURING NBC DEFENCE MODE AND UNDER PARTICULAR CONDITION, FOLLOW THE PROCEDURE AS PRESCRIBED IN INSTRUCTION BOOK ART 2.4 AND 2.9. - Material Cost
REPLACE ALL EXHAUST COMPENSATORS AS PER SAMPLE WITH FIT BOLTS AND DISTANCE PIECE. (MAKE/ OEM - M/S METALIC BELLOWS, CHENNAI) - Service Cost
REPLACE ALL EXHAUST COMPENSATORS AS PER SAMPLE WITH FIT BOLTS AND DISTANCE PIECE. (MAKE/ OEM - M/S METALIC BELLOWS, CHENNAI) - Material Cost
RENEW THE BOOST GT EXHAUST DOOR FRAMES (MAT - MS) VIEW HEAV CORROSION ALONG WITH BOOST EXHAUST PLATFORM (MAT - MS) WITH WOODEN BASE AND HOOK TYPE LADDER (MAT MS). - Service Cost
RENEW THE BOOST GT EXHAUST DOOR FRAMES (MAT - MS) VIEW HEAV CORROSION ALONG WITH BOOST EXHAUST PLATFORM (MAT - MS) WITH WOODEN BASE AND HOOK TYPE LADDER (MAT MS). - Material Cost
CHECK MOUNTING CLEARANCE IN EXPANSION JOINTS BY FILLER GAUGE WHEN MOUNTING THE EXHAUST DUCT. NOTE:- WHEN MOUNTING THE PIPE LINES AND THE SYSTEM COMPONENTS, ENSURE THAT THE GASKETS DO NOT OBSTRUCT THE PASSAGE WAY. - Service Cost
CHECK MOUNTING CLEARANCE IN EXPANSION JOINTS BY FILLER GAUGE WHEN MOUNTING THE EXHAUST DUCT. NOTE:- WHEN MOUNTING THE PIPE LINES AND THE SYSTEM COMPONENTS, ENSURE THAT THE GASKETS DO NOT OBSTRUCT THE PASSAGE WAY. - Material Cost
CARRY OUT CLEANING OF INTERIOR SURFACE OF THE GAS DUCTS WITH WIRE BRUSHES, FLUSH WITH FUEL OIL AND DRY IT - Service Cost
CARRY OUT CLEANING OF INTERIOR SURFACE OF THE GAS DUCTS WITH WIRE BRUSHES, FLUSH WITH FUEL OIL AND DRY IT- Material Cost
UNDERTAKE INTERNAL SURVEY OF ALL EXHAUST PIECES AND RENEW DEFECTIVE ONE. (MAT - TITANIUM, AREA - 50 SQ MTR) - Service Cost
UNDERTAKE INTERNAL SURVEY OF ALL EXHAUST PIECES AND RENEW DEFECTIVE ONE. (MAT - TITANIUM, AREA - 50 SQ MTR) - Material Cost
REPLACE ALL SUPPORTING TIE RODS AS PER SAMPLE ALONG WITH BOTTLE SCREW AND C CLAMP. (QTY - 30 NO, MAT - MS, LENGTH - 2 MTR / ROD) - Service Cost
REPLACE ALL SUPPORTING TIE RODS AS PER SAMPLE ALONG WITH BOTTLE SCREW AND C CLAMP. (QTY - 30 NO, MAT - MS, LENGTH - 2 MTR / ROD) - Material Cost
REPLACE HOT LAGGING(GLASS WOOL) ALONG WITH CLADDING SHEETS (GI SHEET, 20 GUAGE) IN BOTH ENGINE ROOMS - Service Cost
REPLACE HOT LAGGING(GLASS WOOL) ALONG WITH CLADDING SHEETS (GI SHEET, 20 GUAGE) IN BOTH ENGINE ROOMS - Material Cost
MGT SAFETY & GOVERNING SYSTEM (1241RE) MCR
Service Cost and Material Cost - Removal, Repair/Refurbishment, calibration, re-installation of RG lub oil tank level relay with sensor (includes disconnection old connectors & fitment, connection of new connectors) - Service Cost
Service Cost and Material Cost - Removal, Repair/Refurbishment, calibration, re-installation of RG lub oil tank level relay with sensor (includes disconnection old connectors & fitment, connection of new connectors) - Material Cost
UNDERTAKE THE FOLLOWING FOR BGT EXHAUST SEA WATER SYSTEM:-
RENEW OUTLET PERFORATED MANIFOLD - Service Cost
RENEW OUTLET PERFORATED MANIFOLD - Material Cost
RENEW OIL MC-20 IN CLOSED INTERNAL CAVITY OF WATER SCOOP. - Service Cost
RENEW OIL MC-20 IN CLOSED INTERNAL CAVITY OF WATER SCOOP. - Material Cost
RENEW FLOW DUCT OF WATER SCOOP. - Service Cost
RENEW FLOW DUCT OF WATER SCOOP. - Material Cost
RENEW PAINT OF SYSTEM PIPES. - Service Cost
RENEW PAINT OF SYSTEM PIPES. - Material Cost
OVERHAUL AND REFIT ANGLE VALVE. Qty -02, Angle valve - 25mm dia - Service Cost
OVERHAUL AND REFIT ANGLE VALVE. Qty -02, Angle valve - 25mm dia - Material Cost
OFFER SYSTEM TRIALS AS PER IN NORMS - Service Cost
Annexure C (Details of DL 20246) De-gutting/NDT/Repair/Renewal/ Regutting of complete FER & AER exhaust system with lagging to create unshipping route:-
Service Cost - Exhaust trunking including funnel
Material Cost - Exhaust trunking including funnel
Service Cost - Soft Patches
Material Cost - Soft Patches
Service Cost - Exhaust system compensators
Material Cost - Exhaust system compensators
De-gutting/Repair/Re-gutting of following:-
Service Cost - Railing/Grating/Chequered Plates
Material Cost - Railing/Grating/Chequered Plates
Service Cost - Ventilation trunking
Material Cost - Ventilation trunking
Service Cost - Degutting/Overhaul/Re-gutting of ventilation blowers
Material Cost - Degutting/Overhaul/Re-gutting of ventilation blowers
De-gutting/Repairs/Chemical cleaning/Pressure Testing/Re-Gutting of associated system piping:-
Service Cost - Air system (Mat - SS, Dia - 12 to 20 mm)
Material Cost - Air system (Mat - SS, Dia - 12 to 20 mm)
Service Cost - Lub oil system (Mat - Al, Dia - 12 - 40 mm)
Material Cost - Lub oil system (Mat - Al, Dia - 12 - 40 mm)
Service Cost - Fuel system (Mat - Al, Dia - 38 to 80 mm)
Material Cost - Fuel system (Mat - Al, Dia - 38 to 80 mm)
Service Cost - Chemical washing system (Mat - SS, Dia - 12 to 30 mm)
Material Cost - Chemical washing system (Mat - SS, Dia - 12 to 30 mm)
Service Cost - GT Fire Fighting system (Mat -SS, Dia - 12 to 30 mm)
Material Cost - GT Fire Fighting system (Mat -SS, Dia - 12 to 30 mm)
Service Cost - Conduits for control cables (Mat - Al, Dia - 20 to 50 mm)
Material Cost - Conduits for control cables (Mat - Al, Dia - 20 to 50 mm)
Service Cost - Fuel System valves (Mat - Al)
Material Cost - Fuel System valves (Mat - Al)
Service Cost - GT casing drain (Mat - Al, Dia - 38 to 80 mm)
Material Cost - GT casing drain (Mat - Al, Dia - 38 to 80 mm)
Service Cost - Lub oil system valves (Mat - Al)
Material Cost - Lub oil system valves (Mat - Al)
Service Cost - De-aerator lines (Mat - Al, Dia - 32 & 80 mm)
Material Cost - De-aerator lines (Mat - Al, Dia - 32 & 80 mm)
De-gutting/Repairs/Chemical Cleaning/Pressure Testing/re-gutting of peripheral items of GT/RG like:-
Service Cost - Fuel Service Cost and Material Cost Tank (Tank no 7)
Material Cost - Fuel Service Cost and Material Cost Tank (Tank no 7)
Service Cost - FNT Filter and stands
Material Cost - FNT Filter and stands
Service Cost - GT Emergency fuel tank
Material Cost - GT Emergency fuel tank
Service Cost - GT/RG coolers
Material Cost - GT/RG coolers
Service Cost - CT 200 Filters
Material Cost - CT 200 Filters
Service Cost - Renewal of GT/RG Lub oil storage and circulating tanks
Material Cost - Renewal of GT/RG Lub oil storage and circulating tanks
De-gutting/Repairs/Chemical cleaning/Pressure Testing/Re-gutting of peripheral items of GT/RG like:-
Service Cost - GT Fire Fighting Bottles
Material Cost - GT Fire Fighting Bottles
Service Cost - PTOG Bottles
Material Cost - PTOG Bottles
Service Cost - FREON 114B2 Storage Bottles
Material Cost - FREON 114B2 Storage Bottles
Service Cost - Air Reducers (9-11, 20-25, 90-110 KG/CM2)
Material Cost - Air Reducers (9-11, 20-25, 90-110 KG/CM2)
Service Cost - De-gutting/Overhaul/Re-gutting of GT fuel Booster pump
Material Cost - De-gutting/Overhaul/Re-gutting of GT fuel Booster pump
De-gutting/Renewal/Repairs/Fabrication/Re-gutting of entire GT air intake system. These include:-
Service Cost - FER & AER air intake compartments on flag deck and weather deck
Material Cost - FER & AER air intake compartments on flag deck and weather deck
Service Cost - Air Intake trunkings in both engine rooms
Material Cost - Air Intake trunkings in both engine rooms
Service Cost - All GTs air intake cowlings
Material Cost - All GTs air intake cowlings
Service Cost - All GTs intake rubber diaphragms
Material Cost - All GTs intake rubber diaphragms
Service Cost - Perforated sheets
Material Cost - Perforated sheets
Service Cost - Nylon filter frames as per drawing/in-situ gauging
Material Cost - Nylon filter frames as per drawing/in-situ gauging
Service Cost - Coarse filter elements along with securing arrangement
Material Cost - Coarse filter elements along with securing arrangement
Service Cost - Baffle plates
Material Cost - Baffle plates
Service Cost - Baffle plate supporting structures
Material Cost - Baffle plate supporting structures
Service Cost - Supplementary trunking
Material Cost - Supplementary trunking
Service Cost - Cloth Bellow
Material Cost - Cloth Bellow
Service Cost - Shutters
Material Cost - Shutters
Service Cost - De-icing pipe
Material Cost - De-icing pipe
Service Cost - Acoustic filters with perforated sheet
Material Cost - Acoustic filters with perforated sheet
Service Cost - Air Differential pipes
Material Cost - Air Differential pipes
Service Cost -Bi-Metalic strip
Material Cost -Bi-Metalic strip
Service Cost - Gun mountings
Material Cost - Gun mountings
Service Cost - De-gutting/Repairs/Re-gutting of GT casing cooling trunkings
Material Cost - De-gutting/Repairs/Re-gutting of GT casing cooling trunkings
Unshipping of GTA Units:-
Service Cost - Remove first connection of all GTs and RGs and Secure them with protective polythene sheets or plastic caps as required and as necessary for preservation.
Material Cost - Remove first connection of all GTs and RGs and Secure them with protective polythene sheets or plastic caps as required and as necessary for preservation.
Service Cost - Break chock fastening and degut all foundation bolts of GTs and RGs. Heating of bolts using gas welding will be required
Material Cost - Break chock fastening and degut all foundation bolts of GTs and RGs. Heating of bolts using gas welding will be required
Service Cost -Dismantle cordon shaft between all GTs and RGs including removal of PT cover sleeve, oblong cover and other fittings as necessary
Material Cost -Dismantle cordon shaft between all GTs and RGs including removal of PT cover sleeve, oblong cover and other fittings as necessary
Service Cost - Dismantle link shaft between PCRG & SCRG including removal of PT cover sleeve, oblong cover and other fitting as necessary
Material Cost - Dismantle link shaft between PCRG & SCRG including removal of PT cover sleeve, oblong cover and other fitting as necessary
Service Cost - Dismantle resilient shaft between cruise and boost RGs including removal of PT cover sleeve, oblong cover and other fittings as necessary
Material Cost - Dismantle resilient shaft between cruise and boost RGs including removal of PT cover sleeve, oblong cover and other fittings as necessary
Service Cost - Remove exhaust piece of GT (Between PT & compensator) of all four GTs from engine rooms to outside by crane.
Material Cost - Remove exhaust piece of GT (Between PT & compensator) of all four GTs from engine rooms to outside by crane.
Service Cost - Transport all items to storage space hired by contractor.
Material Cost - Transport all items to storage space hired by contractor.
Service Cost - Prepare following GTs and RGs for lifting by attaching special lifting gear and fit chain pulley blocks in engine rooms as required and as necessary (i) PCGT (ii) SCGT (iii) PCRG (iv) SCRG (v) PBGT (vi) SBGT
Material Cost - Prepare following GTs and RGs for lifting by attaching special lifting gear and fit chain pulley blocks in engine rooms as required and as necessary (i) PCGT (ii) SCGT (iii) PCRG (iv) SCRG (v) PBGT (vi) SBGT
Service Cost - Remove following GTs and RGs using jetty crane one by one (i) PCGT (ii) SCGT (iii) PCRG (iv) SCRG (v) PBGT (vi) SBGT
Material Cost - Remove following GTs and RGs using jetty crane one by one (i) PCGT (ii) SCGT (iii) PCRG (iv) SCRG (v) PBGT (vi) SBGT
Service Cost - Undertake unbolting of shaft flange of both shafts with Boost RGs as required and as necessary. Boost RGs will be lifted post completion of shafting work.
Material Cost - Undertake unbolting of shaft flange of both shafts with Boost RGs as required and as necessary. Boost RGs will be lifted post completion of shafting work.
Service Cost - Prepare Boost RGs for lifting by attaching special lifting gear.
Material Cost - Prepare Boost RGs for lifting by attaching special lifting gear.
Service Cost - Remove Boost RGs using jetty crane and transport them to Stowage space
Material Cost - Remove Boost RGs using jetty crane and transport them to Stowage space
Foundation preparation of all GTA units as per specifications. Foundations to be offered to trial agency for checks as per specified document.
Service Cost - Prior to dry dock, recondition or renew technical support units of both the propeller shafts as required and as necessary
Material Cost - Prior to dry dock, recondition or renew technical support units of both the propeller shafts as required and as necessary
Service Cost - Prepare surface of all GTs and RGs foundations as required and as necessary. Work involves plugging of holes by welding and grinding/bedding of surface for required finish. Checks of foundations to be offered to trial agency.
Material Cost - Prepare surface of all GTs and RGs foundations as required and as necessary. Work involves plugging of holes by welding and grinding/bedding of surface for required finish. Checks of foundations to be offered to trial agency.
Lowering of GT/RG units:-
Service Cost - Take custody of all GTs and RGs, Prepare them with lifting gear and transport them to ship for lowering them inside engine rooms.
Material Cost - Take custody of all GTs and RGs, Prepare them with lifting gear and transport them to ship for lowering them inside engine rooms.
Service Cost - Prepare ship's engine rooms for lowering GTs and RGs by fitting chain pulleys blocks as required and as necessary.
Material Cost - Prepare ship's engine rooms for lowering GTs and RGs by fitting chain pulleys blocks as required and as necessary.
Service Cost - Lower GTs & RGs one by one using jetty crane. Jetty crane shall be provided by ND(MB)
Material Cost - Lower GTs & RGs one by one using jetty crane. Jetty crane shall be provided by ND(MB)
Alignment of boost RGs with propeller shaft:-
Service Cost - Carry out rough alignment between propeller shafts and Boost RGs using jack bolts. Process involves installation of temporary metal brackets with bolts for shifting RGs in lateral directions.
Material Cost - Carry out rough alignment between propeller shafts and Boost RGs using jack bolts. Process involves installation of temporary metal brackets with bolts for shifting RGs in lateral directions.
Service Cost -Manufacture coupling bolts between Boost RG and propeller shafts and couple them after rough alignment.
Material Cost -Manufacture coupling bolts between Boost RG and propeller shafts and couple them after rough alignment.
Alignment of all RGs with each other through link shaft:-
Service Cost - Manufacture jack bolts of required size for all GTs and RGs and place them on GTs and RGs for rough alignment
Material Cost - Manufacture jack bolts of required size for all GTs and RGs and place them on GTs and RGs for rough alignment
Service Cost - Take custody of all cordon shafts and resilient shafts and transport them to ship and install them one by one for rough alignment.
Material Cost - Take custody of all cordon shafts and resilient shafts and transport them to ship and install them one by one for rough alignment.
Service Cost - Carryout rough alignment between cruise and Boost RGs and cruise RGs including link shaft using jack bolts. Process involves installation of temporary metal bracket with bolts for shifting RGs in lateral direction
Material Cost - Carryout rough alignment between cruise and Boost RGs and cruise RGs including link shaft using jack bolts. Process involves installation of temporary metal bracket with bolts for shifting RGs in lateral direction
Alignment of individual GTs with respective RGs:-
Service Cost - Carry out rough alignment between cruise and boost GTs with their respective RGs. Process involves installation of temporary metal brackets with bolts for shifting RGs in lateral directions
Material Cost - Carry out rough alignment between cruise and boost GTs with their respective RGs. Process involves installation of temporary metal brackets with bolts for shifting RGs in lateral directions
Service Cost - Carry out final alignment between all GTs and RGs on jack bolts.
Material Cost - Carry out final alignment between all GTs and RGs on jack bolts.
Service Cost - Prepare and manufacture shims for all GTs and RGs as per required specifications and tolerances.
Material Cost - Prepare and manufacture shims for all GTs and RGs as per required specifications and tolerances.
Service Cost - Drill foundation holes for all GTs and RGs using portable drilling machines followed by reaming of holes to required dimensions
Material Cost - Drill foundation holes for all GTs and RGs using portable drilling machines followed by reaming of holes to required dimensions
Service Cost - Manufacture fit and free bolts as per required dimensions and install them along with shims
Material Cost - Manufacture fit and free bolts as per required dimensions and install them along with shims
Service Cost - Dismantle all cordon shafts and resilient shafts for installation of exhaust volutes
Material Cost - Dismantle all cordon shafts and resilient shafts for installation of exhaust volutes
Exhaust build up of both engine rooms with specified clearances :-
Service Cost - Lower exhaust volutes of all GTs one by one and keep them in position along with cordon shafts
Service Cost - Manufacture shims for all exhaust volutes and install the volutes using bolts manufactured as necessary. Temporary shims for boost exhaust duct assembling necessary to get required clearances as per given specifications in process chart (Supplement to GT Operating instructions)
Material Cost - Manufacture shims for all exhaust volutes and install the volutes using bolts manufactured as necessary. Temporary shims for boost exhaust duct assembling necessary to get required clearances as per given specifications in process chart (Supplement to GT Operating instructions)
Service Cost - Install all cordon shafts resilient shafts between GTs and RGs along with exhaust volutes and bulkhead glands (between cruise and boost RGs)
Service Cost - Undertake alignment check and ensure they are within limits. If alignment is not within limits, analyse and rectify defects till alignment values are within limits for all units including link shaft. Present the reading to acceptance agency.
Service Cost - Install cladding and venturi pieces on the compensators as required and as necessary
Service Cost - Transport and lower cruise exhaust ducts and install them one by one as required and as necessary. Final tightening of bolts between duct and soft patch of 01 deck should only be undertaken after the soft patch securing is completed.
Material Cost - Transport and lower cruise exhaust ducts and install them one by one as required and as necessary. Final tightening of bolts between duct and soft patch of 01 deck should only be undertaken after the soft patch securing is completed.
Harbour trial regime as per specified document. This will include:-
Service Cost - Harbour trials/trips
Service Cost - Basin trials
Sea trial regime as per specified document. This will include:-
Service Cost - Sea trials
Service Cost - Trips at sea
Service Cost - Control system checks at sea
Service Cost - Liquidation of observations post sea trials/FPT
Service Cost - Alignment checks post FPT
Scope 2 - Turnkey Job of Gas Turbine-FER/AER (GT) - (RM.0789)
FUEL BOOST PUMP (GT) AFT ENGINE ROOM/FWD ENGINE ROOM UNDERATKE OVERHAUL OF FUEL BOOST PUMPS (QTY 02) AS FOLLOWS: -
OVERHAUL PUMP UNIT. GAUGE AXIAL AND DIAMETRICAL CLEARANCES. RENEW CONSUMABLE, BEARING, SEALS AND WORN OUT PARTS - Service Cost
OVERHAUL PUMP UNIT. GAUGE AXIAL AND DIAMETRICAL CLEARANCES. RENEW CONSUMABLE, BEARING, SEALS AND WORN OUT PARTS - Material Cost
REPLACE BY-PASS AND PRESSURE REGULATING VALVES AND OFFER FUNCTIONL TRIALS. - Service Cost
REPLACE BY-PASS AND PRESSURE REGULATING VALVES AND OFFER FUNCTIONL TRIALS. - Material Cost
OVERHAUL AND REFIT SUCTION AND DISCHARGE VALVES. - Service Cost
OVERHAUL AND REFIT SUCTION AND DISCHARGE VALVES. - Material Cost
RENEW FOUNATION ALONG WITH SV MOUNTS - Service Cost
RENEW FOUNATION ALONG WITH SV MOUNTS - Material Cost
CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS(SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION/SPM CHECKS ON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. - Service Cost
CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS(SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION/SPM CHECKS ON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. - Material Cost
GT/RG LUB OIL SYSTEM FER UNDERTAKE OVERHAUL OF GT & RG LUB OIL SYSTEM AS FOLLOWS: -
DISMANTLE LUB OIL PUMP. EXAMINE ALL PARTS FOR WEAR. RENEW CONSUMABLE, SEAL, BEARING AND WORN OUT PARTS. - Service Cost
DISMANTLE LUB OIL PUMP. EXAMINE ALL PARTS FOR WEAR. RENEW CONSUMABLE, SEAL, BEARING AND WORN OUT PARTS. - Material Cost
REPLACE AND CALIBRATE PRESSURE GAUGES. - Service Cost
REPLACE AND CALIBRATE PRESSURE GAUGES. - Material Cost
EXAMINE PUMP ROTOR AND CHECK FOR FREEDOM OF MOVEMENT. - Service Cost
EXAMINE PUMP ROTOR AND CHECK FOR FREEDOM OF MOVEMENT. - Material Cost
REPLACE RELIEF VALVE. CARRY OUT FUNCTIONAL TEST AND RESET TO SPECIFIED LIFTING PRESSURE. - Service Cost
REPLACE RELIEF VALVE. CARRY OUT FUNCTIONAL TEST AND RESET TO SPECIFIED LIFTING PRESSURE. - Material Cost
OFFER SYSTEM TRIALS AS PER IN STANDARDS INCLUDING SEA TRIALS AND PROVE SYSTEM - Service Cost
OFFER SYSTEM TRIALS AS PER IN STANDARDS INCLUDING SEA TRIALS AND PROVE SYSTEM - Material Cost
GT/RG LUB OIL SEA WATER COOLING SYSTEM - FER & AER CARRY OUT THE MAJOR OVERHAUL OF THE GT/ RG COOLING SYSTEM (DD RELATED) AS FOLLOWS:-
CARRY OUT CHEMICAL CLEANING AND PRESSURE TESTING OF LUB OIL COOLERS. WARNING- 1. THE CHEMICAL AGENT TO BE USED IS AS FOLLOWS- LUB OIL SIDE-5 KGS CAUSTIC SODA GOST 2263-79 IN 100 LTRS OF HOT WATER AT 93 DEGREE C FOR ONE HOUR. SEA WATER SIDE-5PERCENTCOMMERCIAL HYDROCHLORIC ACID WITH SIX PARTS OF WATER AT 60 DEGREE C ADDED WITH- A OXALIC ACID SOLUTION GOST 22180-76 210 GMS PER 10 LTRS OF SOLUTION OR B CARPUTERS GLUE 5 PERCENT BY WEIGHT. FOR ALL GT RG COOLERS - Service Cost
CARRY OUT CHEMICAL CLEANING AND PRESSURE TESTING OF LUB OIL COOLERS. WARNING- 1. THE CHEMICAL AGENT TO BE USED IS AS FOLLOWS- LUB OIL SIDE-5 KGS CAUSTIC SODA GOST 2263-79 IN 100 LTRS OF HOT WATER AT 93 DEGREE C FOR ONE HOUR. SEA WATER SIDE-5PERCENTCOMMERCIAL HYDROCHLORIC ACID WITH SIX PARTS OF WATER AT 60 DEGREE C ADDED WITH- A OXALIC ACID SOLUTION GOST 22180-76 210 GMS PER 10 LTRS OF SOLUTION OR B CARPUTERS GLUE 5 PERCENT BY WEIGHT. FOR ALL GT RG COOLERS - Material Cost
RENEW FLOW DUCT OF WATER SCOOP AND RE-PAINT FOR ALL GT RG COOLERS. - Service Cost
RENEW FLOW DUCT OF WATER SCOOP AND RE-PAINT FOR ALL GT RG COOLERS. - Material Cost
ENSURE WATERSCOOP ELECTRICALLY INSULATED FROM SYSTEM PIPING. RENEW PARONITE GASKET, SPACER AND BUSHING TO ACHIEVE PROPER INSULATION. FOR ALL GT RG COOLERS - Service Cost
ENSURE WATERSCOOP ELECTRICALLY INSULATED FROM SYSTEM PIPING. RENEW PARONITE GASKET, SPACER AND BUSHING TO ACHIEVE PROPER INSULATION. FOR ALL GT RG COOLERS - Material Cost
RENEW SCOOP SECURING STUDS FOR ALL GT RG COOLERS (MAT - SS) - Service Cost
RENEW SCOOP SECURING STUDS FOR ALL GT RG COOLERS (MAT - SS) - Material Cost
UNDERTAKE PAINTING OF SYSTEM PIPES FOR ALL GT RG COOLERS - Service Cost
UNDERTAKE PAINTING OF SYSTEM PIPES FOR ALL GT RG COOLERS - Material Cost
OPEN CAVITY OF SCOOP HOUSING AND RENEW EPOXY COMPOUND FOR ALL SCOOPS - Service Cost
OPEN CAVITY OF SCOOP HOUSING AND RENEW EPOXY COMPOUND FOR ALL SCOOPS - Material Cost
OVERHAUL AND REFIT SYSTEM VALVES/COCKS. - Service Cost
OVERHAUL AND REFIT SYSTEM VALVES/COCKS. - Material Cost
OVERHAUL AND PRESSURE TEST SCOOP VALVES (150MM FLAP TYPE VALVE), ASSOCIATED HYDRUALIC RAM AND ALIGN MICROSWITCH, RENEW ALL CONSUMABLE 'O' RINGS AND SEALS - Service Cost
OVERHAUL AND PRESSURE TEST SCOOP VALVES (150MM FLAP TYPE VALVE), ASSOCIATED HYDRUALIC RAM AND ALIGN MICROSWITCH, RENEW ALL CONSUMABLE 'O' RINGS AND SEALS - Material Cost
CHEMICALLY CLEAN 04 'Y' PIECES , PRESSURE TEST AND REPAIR IF REQUIRED - Service Cost
CHEMICALLY CLEAN 04 'Y' PIECES , PRESSURE TEST AND REPAIR IF REQUIRED - Material Cost
RENEW SEA TUBE DISTANCE PIECES AND TO BE PRESSURE TESTED FOR ALL GT RG COOLERS - Service Cost
RENEW SEA TUBE DISTANCE PIECES AND TO BE PRESSURE TESTED FOR ALL GT RG COOLERS - Material Cost
CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS(SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION/SPM CHECKS ON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. - Service Cost
CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS(SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION/SPM CHECKS ON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. - Material Cost
BOOST GT EXHAUST HYDRAULIC SYSTEM - ASP UNDERTAKE FOLLOWING ON BOOST GT EXHAUST HYDRAULIC SYSTEM: -
REPLACE HYDRAULIC PUMP UNIT WITH MOTOR. Only pump unit(gear type /positive displacement pump) to be replaced - Service Cost
REPLACE HYDRAULIC PUMP UNIT WITH MOTOR. Only pump unit(gear type /positive displacement pump) to be replaced - Material Cost
RENEW ALL SV MOUNTINGS. - Service Cost
RENEW ALL SV MOUNTINGS. - Material Cost
CARRY OUT PERFORMANCE TRIAL OF THE SYSTEM INCLUDING PARAMETER CHECKS(SUCTION/ DISCHARGE PRESSURE), VIBRATION TRIALS TO RELEVANT IN AGENCY (MTU/GTTT/SS) - Service Cost
CARRY OUT PERFORMANCE TRIAL OF THE SYSTEM INCLUDING PARAMETER CHECKS(SUCTION/ DISCHARGE PRESSURE), VIBRATION TRIALS TO RELEVANT IN AGENCY (MTU/GTTT/SS) - Material Cost
UNDERTAKE REPAIRS OF CLOSING MECHANISM BOTH ELECTRICAL AND MECHANICAL SYSTEM. - Service Cost
UNDERTAKE REPAIRS OF CLOSING MECHANISM BOTH ELECTRICAL AND MECHANICAL SYSTEM. - Material Cost
OIL LEAK OBSERVED FROM HYDRAULIC OIL TANK. UNDERTAKE RENEWAL FOLLOWED BY PRESSURE TESTING. MS tank, capacity 20 ltr - Service Cost
OIL LEAK OBSERVED FROM HYDRAULIC OIL TANK. UNDERTAKE RENEWAL FOLLOWED BY PRESSURE TESTING. MS tank, capacity 20 ltr - Material Cost
EXHAUST DOOR LOCKING HOOKS AND BRACKET CORRODED DUE TO SEA WATER. MANUFACTURE AND REPLACED AS PER SAMPLE/ GAUGING. MAT-SS - Service Cost
EXHAUST DOOR LOCKING HOOKS AND BRACKET CORRODED DUE TO SEA WATER. MANUFACTURE AND REPLACED AS PER SAMPLE/ GAUGING. MAT-SS - Material Cost
LEAKAGE OBSERVED FROM THE SIDES OF HYRAULIC RAMS. UNDERTAKE OVERHAUL OF RAMS. REPLACE CONSUMABLES, SEALS. - Service Cost
LEAKAGE OBSERVED FROM THE SIDES OF HYRAULIC RAMS. UNDERTAKE OVERHAUL OF RAMS. REPLACE CONSUMABLES, SEALS. - Material Cost
HYDRAULIC FILTERS CHOCKED. REPLACE AS PER SAMPLE - Service Cost
HYDRAULIC FILTERS CHOCKED. REPLACE AS PER SAMPLE - Material Cost
UNDERTAKE INSITU THREADING OF GREASE CUP POINTS IN VIEW OF THREADED OFF - Service Cost
UNDERTAKE INSITU THREADING OF GREASE CUP POINTS IN VIEW OF THREADED OFF - Material Cost
OVERHAUL AND TRIALS OF HAND PUMP - Service Cost
OVERHAUL AND TRIALS OF HAND PUMP - Material Cost
RENEWAL OF BGT EXHAUST DOOR BEADING, SEA WATER INGRESS OBSERVED ACROSS THE BOOST DOOR BEADING - Service Cost
RENEWAL OF BGT EXHAUST DOOR BEADING, SEA WATER INGRESS OBSERVED ACROSS THE BOOST DOOR BEADING - Material Cost
BOOST DOORS DEFOREMED. UNDERTAKE RENEWAL OF DOOR Approx 6ft dia, as per sample, mat- MS - Service Cost
BOOST DOORS DEFOREMED. UNDERTAKE RENEWAL OF DOOR Approx 6ft dia, as per sample, mat- MS - Material Cost
MAIN GAS TURBINE AGGREGATE(M-15E GTA) INSTALLATION - FER/AER REMOVE AND REINSTALL COMPLETE GT AGGREGATE (04 GTs AND 04 RGs)
MAIN GAS TURBINE AGGREGATE(M-15E GTA) INSTALLATION FER/AER REMOVE AND REINSTALL COMPLETE GT AGGREGATE (04 GTs AND 04 RGs) FOR : - (III) OLD UNITS WILL BE REINSTALLED AS IT IS (04 OUT OF 08 GTA UNITS WILL BE REPLACED WITH NEW UNITS, THE 04 OLD GTA UNITS BEING REPLACED ARE TO BE PACKAGED AND TRANSPORTED BACK TO MO(MBI). AGGREGATE(M-15E GTA) INSTALLATION - Service Cost
MAIN GAS TURBINE AGGREGATE(M-15E GTA) INSTALLATION FER/AER REMOVE AND REINSTALL COMPLETE GT AGGREGATE (04 GTs AND 04 RGs) FOR : - (III) OLD UNITS WILL BE REINSTALLED AS IT IS (04 OUT OF 08 GTA UNITS WILL BE REPLACED WITH NEW UNITS, THE 04 OLD GTA UNITS BEING REPLACED ARE TO BE PACKAGED AND TRANSPORTED BACK TO MO(MBI). AGGREGATE(M-15E GTA) INSTALLATION - Material Cost
GT AIR INTAKE SYSTEM - AER/FER
UNDERTAKE COMPLETE RENEWAL GT AIR INTAKE SYSTEM FOR CRUISE AND BOOST GTs INCLUDING BELL MOUTH, FILTER TRAYS, ULTRA SONIC FILTERS, COWLING PIECES ETC. VIEW Material Cost DETERIORATION OVER PROLONGED Service Cost LIFE (MAT - AL) - Service Cost
UNDERTAKE COMPLETE RENEWAL GT AIR INTAKE SYSTEM FOR CRUISE AND BOOST GTs INCLUDING BELL MOUTH, FILTER TRAYS, ULTRA SONIC FILTERS, COWLING PIECES ETC. VIEW Material Cost DETERIORATION OVER PROLONGED Service Cost LIFE (MAT - AL) - Material Cost
MAIN RG CRUISE / BOOST (ZORYA - M15) - AER/ FER UNDERTAKE OVERHAUL/ ROUTINES OF MAIN RGs AS FOLLOWS:-
EXAMINE MANIPULATOR FILTER SEALING SPHERE FOR DENTS, CRACKS AND BURRS. RENEW SEALING SPHERE (PROCESS CHART ART. 3.16 REFERS). - Service Cost
EXAMINE MANIPULATOR FILTER SEALING SPHERE FOR DENTS, CRACKS AND BURRS. RENEW SEALING SPHERE (PROCESS CHART ART. 3.16 REFERS). - Material Cost
INSPECT LINE FILTERS. (PROCESS CHART 3.5 REFERS). - Service Cost
INSPECT LINE FILTERS. (PROCESS CHART 3.5 REFERS). - Material Cost
OVERHAL AND REFIT ALL AIR REDUCERS AND AIR VALVES OF PNEUMATIC SYSTEM FOR FRICTION COUPLINGS AND JAW COUPLINGS. - Service Cost
OVERHAL AND REFIT ALL AIR REDUCERS AND AIR VALVES OF PNEUMATIC SYSTEM FOR FRICTION COUPLINGS AND JAW COUPLINGS. - Material Cost
GT STARTING & TURNING SYSTEM (CRUISE/ BOOST-1241RE) AER/ FER
OVERHAUL H.P AIR RESERVOIRS. EXAMINE AND CARRY OUT PROOF TEST (BR 3000 ART- 2341.8 REFERS) TO 1.5 TIMES THE WORKING PRESSURE. - Service Cost
OVERHAUL H.P AIR RESERVOIRS. EXAMINE AND CARRY OUT PROOF TEST (BR 3000 ART- 2341.8 REFERS) TO 1.5 TIMES THE WORKING PRESSURE. - Material Cost
OVERHAUL AND REFIT SYSTEM VALVES. - Service Cost
OVERHAUL AND REFIT SYSTEM VALVES. - Material Cost
TEST AND RESET ALL RELIEF VALVES AS NECESSARY (BR 3000 ART-2303.2 REFERS). - Service Cost
TEST AND RESET ALL RELIEF VALVES AS NECESSARY (BR 3000 ART-2303.2 REFERS). - Material Cost
MGT FUEL OIL SYSTEM (GT CRUISE/ BOOST) - AER/FER
OVERHAUL AND REFIT SYSTEM VALVES - Service Cost
OVERHAUL AND REFIT SYSTEM VALVES - Material Cost
OVERHAUL AND REFIT FUEL TANK VALVES. REPLACE 50% DEFECTIVE - Service Cost
OVERHAUL AND REFIT FUEL TANK VALVES. REPLACE 50% DEFECTIVE - Material Cost
MGT FUEL PRESSURE REGULATOR - AER/FER
FUEL PRESSURE FLUCTUATING. UNDERTAKE OVERHAULING AND PROVE Service CostABILITY CHECKS OF RDT VIEW MALFUNCTIONING. - Service Cost
FUEL PRESSURE FLUCTUATING. UNDERTAKE OVERHAULING AND PROVE Service CostABILITY CHECKS OF RDT VIEW MALFUNCTIONING. - Material Cost
UNDERTAKE OVERHAUL/ ROUTINES OF MGT EXHAUST IN BOTH E/R AS FOLLOWS:-
CHECK AND ENSURE THAT BY PASS COVERS ARE FIRMLY FITTED AGAINST THEIR SEATS. RENEW RUBBER SEALS IF NECESSARY. NOTE:- FOR MAINTENANCE DURING NBC DEFENCE MODE AND UNDER PARTICULAR CONDITION, FOLLOW THE PROCEDURE AS PRESCRIBED IN INSTRUCTION BOOK ART 2.4 AND 2.9. - Service Cost
CHECK AND ENSURE THAT BY PASS COVERS ARE FIRMLY FITTED AGAINST THEIR SEATS. RENEW RUBBER SEALS IF NECESSARY. NOTE:- FOR MAINTENANCE DURING NBC DEFENCE MODE AND UNDER PARTICULAR CONDITION, FOLLOW THE PROCEDURE AS PRESCRIBED IN INSTRUCTION BOOK ART 2.4 AND 2.9. - Material Cost
MGT EXHAUST SYSTEM (1241 RE) - FER/ AER/ ASP UNDERTAKE OVERHAUL/ ROUTINES OF MGT EXHAUST IN BOTH E/R AS FOLLOWS:-
REPLACE ALL EXHAUST COMPENSATORS AS PER SAMPLE WITH FIT BOLTS AND DISTANCE PIECE. (MAKE/ OEM - M/S METALIC BELLOWS, CHENNAI) - Service Cost
REPLACE ALL EXHAUST COMPENSATORS AS PER SAMPLE WITH FIT BOLTS AND DISTANCE PIECE. (MAKE/ OEM - M/S METALIC BELLOWS, CHENNAI) - Material Cost
RENEW THE BOOST GT EXHAUST DOOR FRAMES (MAT - MS) VIEW HEAV CORROSION ALONG WITH BOOST EXHAUST PLATFORM (MAT - MS) WITH WOODEN BASE AND HOOK TYPE LADDER (MAT MS). - Service Cost
RENEW THE BOOST GT EXHAUST DOOR FRAMES (MAT - MS) VIEW HEAV CORROSION ALONG WITH BOOST EXHAUST PLATFORM (MAT - MS) WITH WOODEN BASE AND HOOK TYPE LADDER (MAT MS). - Material Cost
CHECK MOUNTING CLEARANCE IN EXPANSION JOINTS BY FILLER GAUGE WHEN MOUNTING THE EXHAUST DUCT. NOTE:- WHEN MOUNTING THE PIPE LINES AND THE SYSTEM COMPONENTS, ENSURE THAT THE GASKETS DO NOT OBSTRUCT THE PASSAGE WAY. - Service Cost
CHECK MOUNTING CLEARANCE IN EXPANSION JOINTS BY FILLER GAUGE WHEN MOUNTING THE EXHAUST DUCT. NOTE:- WHEN MOUNTING THE PIPE LINES AND THE SYSTEM COMPONENTS, ENSURE THAT THE GASKETS DO NOT OBSTRUCT THE PASSAGE WAY. - Material Cost
CARRY OUT CLEANING OF INTERIOR SURFACE OF THE GAS DUCTS WITH WIRE BRUSHES, FLUSH WITH FUEL OIL AND DRY IT - Service Cost
CARRY OUT CLEANING OF INTERIOR SURFACE OF THE GAS DUCTS WITH WIRE BRUSHES, FLUSH WITH FUEL OIL AND DRY IT - Material Cost
UNDERTAKE INTERNAL SURVEY OF ALL EXHAUST PIECES AND RENEW DEFECTIVE ONE. (MAT - TITANIUM, AREA - 50 SQ MTR) - Service Cost
UNDERTAKE INTERNAL SURVEY OF ALL EXHAUST PIECES AND RENEW DEFECTIVE ONE. (MAT - TITANIUM, AREA - 50 SQ MTR) - Material Cost
REPLACE ALL SUPPORTING TIE RODS AS PER SAMPLE ALONG WITH BOTTLE SCREW AND C CLAMP. (QTY - 30 NO, MAT - MS, LENGTH - 2 MTR / ROD) - Service Cost
REPLACE ALL SUPPORTING TIE RODS AS PER SAMPLE ALONG WITH BOTTLE SCREW AND C CLAMP. (QTY - 30 NO, MAT - MS, LENGTH - 2 MTR / ROD) - Material Cost
REPLACE HOT LAGGING(GLASS WOOL) ALONG WITH CLADDING SHEETS (GI SHEET, 20 GUAGE) IN BOTH ENGINE ROOMS - Service Cost
REPLACE HOT LAGGING(GLASS WOOL) ALONG WITH CLADDING SHEETS (GI SHEET, 20 GUAGE) IN BOTH ENGINE ROOMS - Material Cost
MGT SAFETY & GOVERNING SYSTEM (1241RE) - MCR
PERFORM ALL LABORATORY ANALYSIS OF THE WORKING FLUID IN THE HYDRAULIC TANK. - Service Cost
PERFORM ALL LABORATORY ANALYSIS OF THE WORKING FLUID IN THE HYDRAULIC TANK. - Material Cost
BOOST GT EXHAUST SEA WATER SYSTEM - ASP UNDERTAKE THE FOLLOWING FOR BGT EXHAUST SEA WATER SYSTEM:-
RENEW OUTLET PERFORATED MANIFOLD - Service Cost
RENEW OUTLET PERFORATED MANIFOLD - Material Cost
RENEW OIL MC-20 IN CLOSED INTERNAL CAVITY OF WATER SCOOP. - Service Cost
RENEW OIL MC-20 IN CLOSED INTERNAL CAVITY OF WATER SCOOP. - Material Cost
RENEW FLOW DUCT OF WATER SCOOP. - Service Cost
RENEW FLOW DUCT OF WATER SCOOP. - Material Cost
RENEW PAINT OF SYSTEM PIPES. - Service Cost
RENEW PAINT OF SYSTEM PIPES. - Material Cost
OVERHAUL AND REFIT ANGLE VALVE. Qty -02, Angle valve - 25mm dia - Service Cost
OVERHAUL AND REFIT ANGLE VALVE. Qty -02, Angle valve - 25mm dia - Material Cost
OFFER SYSTEM TRIALS AS PER IN NORMS- Service Cost
Annexure D (Details of DL. 20258) De-gutting/NDT/Repair/Renewal/ Regutting of complete FER & AER exhaust system with lagging to create unshipping route:-
Service Cost - Exhaust trunking including funnel
Material Cost - Exhaust trunking including funnel
Service Cost - Soft Patches
Material Cost - Soft Patches
Service Cost - Exhaust system compensators
Material Cost - Exhaust system compensators
De-gutting/Repair/Re-gutting of following:-
Service Cost - Railing/Grating/Chequered Plates
Material Cost - Railing/Grating/Chequered Plates
Service Cost - Ventilation trunking
Material Cost - Ventilation trunking
Service Cost - Degutting/Overhaul/Re-gutting of ventilation blowers
Material Cost - Degutting/Overhaul/Re-gutting of ventilation blowers
De-gutting/Repairs/Chemical cleaning/Pressure Testing/Re-Gutting of associated system piping:-
Service Cost - Air system (Mat - SS, Dia - 12 to 20 mm)
Material Cost - Air system (Mat - SS, Dia - 12 to 20 mm)
Service Cost - Lub oil system (Mat - Al, Dia - 12 - 40 mm)
Material Cost - Lub oil system (Mat - Al, Dia - 12 - 40 mm)
Service Cost - Fuel system (Mat - Al, Dia - 38 to 80 mm)
Material Cost - Fuel system (Mat - Al, Dia - 38 to 80 mm)
Service Cost - Chemical washing system (Mat - SS, Dia - 12 to 30 mm)
Material Cost - Chemical washing system (Mat - SS, Dia - 12 to 30 mm)
Service Cost - GT Fire Fighting system (Mat -SS, Dia - 12 to 30 mm)
Material Cost - GT Fire Fighting system (Mat -SS, Dia - 12 to 30 mm)
Service Cost - Conduits for control cables (Mat - Al, Dia - 20 to 50 mm)
Material Cost - Conduits for control cables (Mat - Al, Dia - 20 to 50 mm)
Service Cost - Fuel System valves (Mat - Al)
Material Cost - Fuel System valves (Mat - Al)
Service Cost - GT casing drain (Mat - Al, Dia - 38 to 80 mm)
Material Cost - GT casing drain (Mat - Al, Dia - 38 to 80 mm)
Service Cost - Lub oil system valves (Mat - Al)
Material Cost - Lub oil system valves (Mat - Al)
Service Cost - De-aerator lines (Mat - Al, Dia - 32 & 80 mm)
Material Cost - De-aerator lines (Mat - Al, Dia - 32 & 80 mm)
De-gutting/Repairs/Chemical Cleaning/Pressure Testing/re-gutting of peripheral items of GT/RG like:-
Service Cost - Fuel Service Cost and Material Cost Tank (Tank no 7)
Material Cost - Fuel Service Cost and Material Cost Tank (Tank no 7)
Service Cost - FNT Filter and stands
Material Cost - FNT Filter and stands
Service Cost - GT Emergency fuel tank
Material Cost - GT Emergency fuel tank
Service Cost - GT/RG coolerS
Material Cost - GT/RG coolers
Service Cost CT 200 Filters
Material Cost - CT 200 Filters
Service Cost - Renewal of GT/RG Lub oil storage and circulating tanks
Material Cost - Renewal of GT/RG Lub oil storage and circulating tanks
De-gutting/Repairs/Chemical cleaning/Pressure Testing/Re-gutting of peripheral items of GT/RG like:-
Service Cost - GT Fire Fighting Bottles
Material Cost - GT Fire Fighting Bottles
Service Cost - PTOG Bottles
Material Cost - PTOG Bottles
Service Cost - FREON 114B2 Storage Bottles
Material Cost - FREON 114B2 Storage Bottles
Service Cost - Air Reducers (9-11, 20-25, 90-110 KG/CM2)
Material Cost - Air Reducers (9-11, 20-25, 90-110 KG/CM2)
Service Cost - De-gutting/Overhaul/Re-gutting of GT fuel Booster pump
Material Cost - De-gutting/Overhaul/Re-gutting of GT fuel Booster pump
De-gutting/Renewal/Repairs/Fabrication/Re-gutting of entire GT air intake system. These include:-
Service Cost - FER & AER air intake compartments on flag deck and weather deck
Material Cost - FER & AER air intake compartments on flag deck and weather deck
Service Cost - Air Intake trunkings in both engine rooms
Material Cost - Air Intake trunkings in both engine rooms
Service Cost - All GTs air intake cowlings
Material Cost - All GTs air intake cowlings
Service Cost - All GTs intake rubber diaphragms
Material Cost - All GTs intake rubber diaphragms
Service Cost - Perforated sheets
Material Cost - Perforated sheets
Service Cost - Nylon filter frames as per drawing/in-situ gauging
Material Cost - Nylon filter frames as per drawing/in-situ gauging
Service Cost - Coarse filter elements along with securing arrangement
Material Cost - Coarse filter elements along with securing arrangement
Service Cost - Baffle plates
Material Cost - Baffle plates
Service Cost - Baffle plate supporting structures
Material Cost - Baffle plate supporting structures
Service Cost - Supplementary trunking
Material Cost - Supplementary trunking
Service Cost - Cloth Bellow
Material Cost - Cloth Bellow
Service Cost - Shutters
Material Cost - Shutters
Service Cost - De-icing pipe
Material Cost - De-icing pipe
Service Cost - Acoustic filters with perforated sheet
Material Cost - Acoustic filters with perforated sheet
Service Cost - Air Differential pipes
Material Cost - Air Differential pipes
Service Cost -Bi-Metalic strip
Material Cost -Bi-Metalic strip
Service Cost - Gun mountings
Material Cost - Gun mountings
Service Cost - De-gutting/Repairs/Re-gutting of GT casing cooling trunkings
Material Cost - De-gutting/Repairs/Re-gutting of GT casing cooling trunkings
Unshipping of GTA Units:-
Service Cost - Remove first connection of all GTs and RGs and Secure them with protective polythene sheets or plastic caps as required and as necessary for preservation.
Material Cost - Remove first connection of all GTs and RGs and Secure them with protective polythene sheets or plastic caps as required and as necessary for preservation.
Service Cost - Break chock fastening and degut all foundation bolts of GTs and RGs. Heating of bolts using gas welding will be required
Material Cost - Break chock fastening and degut all foundation bolts of GTs and RGs. Heating of bolts using gas welding will be required
Service Cost -Dismantle cordon shaft between all GTs and RGs including removal of PT cover sleeve, oblong cover and other fittings as necessary
Material Cost -Dismantle cordon shaft between all GTs and RGs including removal of PT cover sleeve, oblong cover and other fittings as necessary
Service Cost - Dismantle link shaft between PCRG & SCRG including removal of PT cover sleeve, oblong cover and other fitting as necessary
Material Cost - Dismantle link shaft between PCRG & SCRG including removal of PT cover sleeve, oblong cover and other fitting as necessary
Service Cost - Dismantle resilient shaft between cruise and boost RGs including removal of PT cover sleeve, oblong cover and other fittings as necessary
Material Cost - Dismantle resilient shaft between cruise and boost RGs including removal of PT cover sleeve, oblong cover and other fittings as necessary
Service Cost - Remove exhaust piece of GT (Between PT & compensator) of all four GTs from engine rooms to outside by crane.
Material Cost - Remove exhaust piece of GT (Between PT & compensator) of all four GTs from engine rooms to outside by crane.
Service Cost - Transport all items to storage space hired by contractor.
Material Cost - Transport all items to storage space hired by contractor.
Service Cost - Prepare following GTs and RGs for lifting by attaching special lifting gear and fit chain pulley blocks in engine rooms as required and as necessary (i) PCGT (ii) SCGT (iii) PCRG (iv) SCRG (v) PBGT (vi) SBGT
Material Cost - Prepare following GTs and RGs for lifting by attaching special lifting gear and fit chain pulley blocks in engine rooms as required and as necessary (i) PCGT (ii) SCGT (iii) PCRG (iv) SCRG (v) PBGT (vi) SBGT
Service Cost - Remove following GTs and RGs using jetty crane one by one (i) PCGT (ii) SCGT (iii) PCRG (iv) SCRG (v) PBGT (vi) SBGT
Material Cost - Remove following GTs and RGs using jetty crane one by one (i) PCGT (ii) SCGT (iii) PCRG (iv) SCRG (v) PBGT (vi) SBGT
Service Cost - Undertake unbolting of shaft flange of both shafts with Boost RGs as required and as necessary. Boost RGs will be lifted post completion of shafting work.
Material Cost - Undertake unbolting of shaft flange of both shafts with Boost RGs as required and as necessary. Boost RGs will be lifted post completion of shafting work.
Service Cost - Prepare Boost RGs for lifting by attaching special lifting gear.
Material Cost - Prepare Boost RGs for lifting by attaching special lifting gear.
Service Cost - Remove Boost RGs using jetty crane and transport them to Stowage space
Material Cost - Remove Boost RGs using jetty crane and transport them to Stowage space
Foundation preparation of all GTA units as per specifications. Foundations to be offered to trial agency for checks as per specified document.
Service Cost - Prior to dry dock, recondition or renew technical support units of both the propeller shafts as required and as necessary
Material Cost - Prior to dry dock, recondition or renew technical support units of both the propeller shafts as required and as necessary
Service Cost - Prepare surface of all GTs and RGs foundations as required and as necessary. Work involves plugging of holes by welding and grinding/bedding of surface for required finish. Checks of foundations to be offered to trial agency.
Material Cost - Prepare surface of all GTs and RGs foundations as required and as necessary. Work involves plugging of holes by welding and grinding/bedding of surface for required finish. Checks of foundations to be offered to trial agency.
Lowering of GT/RG units:-
Service Cost - Take custody of all GTs and RGs, Prepare them with lifting gear and transport them to ship for lowering them inside engine rooms.
Material Cost - Take custody of all GTs and RGs, Prepare them with lifting gear and transport them to ship for lowering them inside engine rooms.
Service Cost - Prepare ship's engine rooms for lowering GTs and RGs by fitting chain pulleys blocks as required and as necessary.
Material Cost - Prepare ship's engine rooms for lowering GTs and RGs by fitting chain pulleys blocks as required and as necessary.
Service Cost - Lower GTs & RGs one by one using jetty crane. Jetty crane shall be provided by ND(MB)
Material Cost - Lower GTs & RGs one by one using jetty crane. Jetty crane shall be provided by ND(MB)
Alignment of boost RGs with propeller shaft:-
Service Cost - Carry out rough alignment between propeller shafts and Boost RGs using jack bolts. Process involves installation of temporary metal brackets with bolts for shifting RGs in lateral directions.
Material Cost - Carry out rough alignment between propeller shafts and Boost RGs using jack bolts. Process involves installation of temporary metal brackets with bolts for shifting RGs in lateral directions.
Service Cost -Manufacture coupling bolts between Boost RG and propeller shafts and couple them after rough alignment.
Material Cost -Manufacture coupling bolts between Boost RG and propeller shafts and couple them after rough alignment.
Alignment of all RGs with each other through link shaft:-
Service Cost - Manufacture jack bolts of required size for all GTs and RGs and place them on GTs and RGs for rough alignment
Material Cost - Manufacture jack bolts of required size for all GTs and RGs and place them on GTs and RGs for rough alignment
Service Cost - Take custody of all cordon shafts and resilient shafts and transport them to ship and install them one by one for rough alignment.
Material Cost - Take custody of all cordon shafts and resilient shafts and transport them to ship and install them one by one for rough alignment.
Service Cost t - Carryout rough alignment between cruise and Boost RGs and cruise RGs including link shaft using jack bolts. Process involves installation of temporary metal bracket with bolts for shifting RGs in lateral direction
Material Cost - Carryout rough alignment between cruise and Boost RGs and cruise RGs including link shaft using jack bolts. Process involves installation of temporary metal bracket with bolts for shifting RGs in lateral direction
Alignment of individual GTs with respective RGs:-
Service Cost - Carry out rough alignment between cruise and boost GTs with their respective RGs. Process involves installation of temporary metal brackets with bolts for shifting RGs in lateral directions
Material Cost - Carry out rough alignment between cruise and boost GTs with their respective RGs. Process involves installation of temporary metal brackets with bolts for shifting RGs in lateral directions
Service Cost - Carry out final alignment between all GTs and RGs on jack bolts.
Material Cost - Carry out final alignment between all GTs and RGs on jack bolts.
Service Cost - Prepare and manufacture shims for all GTs and RGs as per required specifications and tolerances.
Material Cost - Prepare and manufacture shims for all GTs and RGs as per required specifications and tolerances.
Service Cost - Drill foundation holes for all GTs and RGs using portable drilling machines followed by reaming of holes to required dimensions
Material Cost - Drill foundation holes for all GTs and RGs using portable drilling machines followed by reaming of holes to required dimensions
Service Cost - Manufacture fit and free bolts as per required dimensions and install them along with shims
Material Cost - Manufacture fit and free bolts as per required dimensions and install them along with shims
Service Cost - Dismantle all cordon shafts and resilient shafts for installation of exhaust volutes
Material Cost - Dismantle all cordon shafts and resilient shafts for installation of exhaust volutes
Exhaust build up of both engine rooms with specified clearances :-
Service Cost - Lower exhaust volutes of all GTs one by one and keep them in position along with cordon shafts
Service Cost - Manufacture shims for all exhaust volutes and install the volutes using bolts manufactured as necessary. Temporary shims for boost exhaust duct assembling necessary to get required clearances as per given specifications in process chart (Supplement to GT Operating instructions)
Material Cost - Manufacture shims for all exhaust volutes and install the volutes using bolts manufactured as necessary. Temporary shims for boost exhaust duct assembling necessary to get required clearances as per given specifications in process chart (Supplement to GT Operating instructions)
Service Cost - Install all cordon shafts resilient shafts between GTs and RGs along with exhaust volutes and bulkhead glands (between cruise and boost RGs)
Service Cost - Undertake alignment check and ensure they are within limits. If alignment is not within limits, analyse and rectify defects till alignment values are within limits for all units including link shaft. Present the reading to acceptance agency.
Service Cost - Install cladding and venturi pieces on the compensators as required and as necessary
Service Cost - Transport and lower cruise exhaust ducts and install them one by one as required and as necessary. Final tightening of bolts between duct and soft patch of 01 deck should only be undertaken after the soft patch securing is completed.
Material Cost - Transport and lower cruise exhaust ducts and install them one by one as required and as necessary. Final tightening of bolts between duct and soft patch of 01 deck should only be undertaken after the soft patch securing is completed.
Harbour trial regime as per specified document. This will include:-
Service Cost - Harbour trials/trips
Service Cost - Basin trials
Sea trial regime as per specified document. This will include:-
Service Cost - Sea trials
Service Cost - Trips at sea
Service Cost - Control system checks at sea
Service Cost - Liquidation of observations post sea trials/FPT
Service Cost - Alignment checks post FPT
INDWELL CONSTRUCTIONS PVT LTD
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .