| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹9,896.66Admitted-Finance PLOT NO 70 01 JAGDA ROURKELA 769042 | SUNDARGARH | ODISHA | 769042 | ₹9,896.66 | Admitted-Finance |
| 2 | ₹17,170.18Admitted-Finance | ₹17,170.18 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S. Perfect Electricals | M/s PARIDA BROTHERS |
|---|---|---|---|---|---|
| 1.00Group A - INSTALLATION / LABOUR CHARGES [FIBER OPTIC CABLE LAYING] | |||||
| 1.01 | Digging of Hard Soil by manual labour (Spec: 3 feet Depth and 1 feet width) and refilling of trenches | 1 | Meter | 200 ₹236 | 265 ₹312.70 |
| 1.02 | Digging of Soft soil by manual labour (Spec: 3 feet Depth and 1 foot width) and refilling of trenches. | 1 | Meter | 100 ₹118 | 145 ₹171.10 |
| 1.03 | HDPE Pipe Laying and Laying of fiber cable through HDPE pipe, welding, cutting, drilling and finishing. | 1 | Meter | 58 ₹68.44 | 81 ₹95.58 |
| 1.04 | Termination / Splicing of Fibers (per fiber) | 1 | Core | 20 ₹23.60 | 34 ₹40.12 |
| 1.05 | Fixing and Installation of LIUs | 1 | Number | 225 ₹265.50 | 360 ₹424.80 |
| 1.06 | Splicing of pigtail | 1 | Number | 450 ₹531 | 610 ₹719.80 |
| 1.07 | OTDR (Optical Time Domain Reflectometer) Testing, Report & Documentation, Labelling in LIU / Fiber Enclosure (per link) | 1 | Core | 130 ₹153.40 | 160 ₹188.80 |
| 1.08 | Laying of optical fiber through PVC pipe, welding, wall cutting finishing by wall plaster | 1 | Meter | 45 ₹53.10 | 64 ₹75.52 |
| 1.09 | Road punching | 1 | Meter | 800 ₹944 | 1,000 ₹1,180 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
4 Feb 2026, 12:00 pmClosed
Registrar
National Institute of Technology Rourkela, Odisha - 769008
Rate Contract for Passive Networking and OFC Work at NIT Rourkela, Odisha - 769008
2026_NITRK_894910_1
NITR/PW/CIC/2026/371 Date 21/01/2026
Open Tender
Miscellaneous Services
365 days
NIT Rourkela
Refer tender documents
2 documents required · 2 mandatory
₹1,500
Yes
Director NIT Rourkela
₹1 L
Yes
14 Feb 2026
21 Jan 2026
5 Feb 2026
21 Jan 2026
4 Feb 2026
21 Jan 2026
Group A - INSTALLATION / LABOUR CHARGES [FIBER OPTIC CABLE LAYING]
Digging of Hard Soil by manual labour (Spec: 3 feet Depth and 1 feet width) and refilling of trenches
Digging of Soft soil by manual labour (Spec: 3 feet Depth and 1 foot width) and refilling of trenches.
HDPE Pipe Laying and Laying of fiber cable through HDPE pipe, welding, cutting, drilling and finishing.
Termination / Splicing of Fibers (per fiber)
Fixing and Installation of LIUs
Splicing of pigtail
OTDR (Optical Time Domain Reflectometer) Testing, Report & Documentation, Labelling in LIU / Fiber Enclosure (per link)
Laying of optical fiber through PVC pipe, welding, wall cutting finishing by wall plaster
Road punching
Excavation and back filling with protection of bricks and sand in three side of HDPE pipe
OFC laying on surface / overhead
Supply and Fixing of RCC (Reinforced Cement Concrete) route marker after OFC cable and warning tape laying.RCC Dimension: 900x200x100mm
Supply and Fixing of Iron route marker after OFC cable and warning tape laying.Route marker dimension: [ Disc size - 200mm diameter; Stand size - Iron angle of 25mm x 25mm x 3mm, length 3 feet.]
OFC Route marking paint on wall (wherever it is required)
Group B - INSTALLATION / LABOUR CHARGES [UTP CABLE LAYING]
Laying and labeling of UTP cable through existing concealed pipe, welding, wall cutting, drilling and finishing wall by plastering.
Fixing of PVC Pipe
Fixing of PVC Casing and Capping
Supply and Fixing of PVC Pipe (Materials to be supplied by the vendor)
Supply and Fixing of PVC Casing and Capping (Materials to be supplied by the vendor)
Installation of wall mount rack.
Supply and fixing of a switch board with 5/15 amp socket and switch beside network rack.
Supply and fixing of a switch board with two 5/15 amp socket and two switchs beside network rack.
Fixing, labeling and termination of Back box, Face plate and I/O.
Fixing, labeling and termination of Face plate and I/O (Without Back box).
Outdoor UTP Cable Laying.
UTP Cable Laying through surface mounted PVC pipe, casing capping and overhead
Fixing of Patch / Jack Panel
Termination and labeling of UTP cable on Patch / Jack Panel (per port)
UTP Testing and documentation at both Patch / Jack Panel side and I/O side using DTX Analyser (per connection)
Termination/Crimping of RJ-45 Connector
Fixing of Wireless Access Point with proper mounting kit on Wall/Ceiling.
Group C - INSTALLATION / LABOUR CHARGES [CCTV SURVEILLANCE]
CCTV Surveillance Camera installation (Indoor Dome/Bullet/PTZ) in the wall/ceiling
CCTV Surveillance Camera installation (Outdoor Dome/Bullet/PTZ) on the Pole
Installation of pole for CCTV camera which has to be laid at a depth of 2 feet and filled with concrete for 1’ x 1’ x 1’ (“Only pole will be supplied by NIT Rourkela”)
CAT6 Cable Laying in open (ariel) with Stay Wires for Outdoor Surveillance Camera. (Stay wires have to be provided by the contractor )
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
TDPassiveNetwork.pdf
Tender Documents • 1.47 MB
BOQ_940630.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid