| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹64.3 LAccepted-AOC ANGUL ODISHA 759147 UDYAM OD 01 0001580 | ANUGUL | ODISHA | 759147 | l1 | Accepted-AOC Overall L1 bidder |
Tender Value
₹65.4 L
EMD Value
₹1.3 L
Closing Date
22 Aug 2025, 10:00 amClosed
The GM, SGTPP.
Administrative Building, SgTPP, PO-Manigram, Dist- Murshidabad, Pin-742237
Service contract for Overhauling of Mechanical system for Ash Handling plant of U 3 Stg II under AHP MM II at SgTPP
2025_WBPDC_880757_1
WBPDCL/SGTPP/NIT/E3614/25-26
Open Tender
Support/Maintenance Service
Lump-sum
25 days
SgTPP, WBPDCL
Qualification required as per NIT and Tender documents signed and stamped in each page as a token of acceptance
3 documents required · 3 mandatory
₹0
₹1.3 L
Yes
Contract Cell, SGTPP,Admin Bldg
29 Nov 2025
22 Jul 2025
26 Aug 2025
30 Jul 2025
22 Aug 2025
30 Jul 2025
6 Aug 2025
BA Feed gate actuator cylinder dismantling, cylinder seal kit checking if require replacement,gasket fitting and cylinder fitting, if require then cylinder replacement.
BA Feed gate alignment checking/ Replacement of side guide angles, rollers, wedges including water leakage arrest from enclosure body & view glass checking and replacement, if required.
BA Clinker grinder overhauling (Dismantling of crusher,checking/replacement of shaft, cam segments, sleeve, bearings, wear plates, sprocket etc.)and/or replacement of complete assembly of clinker grinder
BA Clinker Grinder gear box & fluid
BA Jet Pulsion pumps overhauling/replacement including checking/replacement of nozzle tip, nozzle plate, wear piece intermediate, throat increaser.
BA hopper four side trough seal nozzle checking, welding of nozzle pipe. Seal trough cleaning & water flushing.
BA clinker grinder feed sump checking, Repairing/replacement, welding, painting and refitting
BA hopper all wall jetting nozzle checking/replacement.
Checking of BA area KGV then servicing/replacement if required.
Checking & servicing/replacement of Water line valves (Gate, Globe and Plug) at BA area.
Application of refractory by gunning machine including supply and fixing of SS anchors and SS wire mesh inside Bottom ash hopper
Checking and Servicing/Replacement of Economizer hopper KGV
Checking/replacement if required of drop pipe below each eco hopper & Fabrication & erection of adaptor below each Economizer hopper
Replacement of 200 NB MS discharge pipe from flushing apparatus including fabrication of miter cut bends and reducers.
Replacement of 250NB/300 NB MS/ DRC Pipe
Dry & wet cleaning of of Economizer hoppers
Dry & wet cleaning of ash from inside of Air Preheated hoppers
Vacuum line Gasket checking and replacement
Overhauling of ESP Material Handling valve replacement if required
Overhauling of APH Material Handling
Replacement of ESP hopper fluidizing tiles and installation of flushing arrangement with nipple and plugs.
Wetting head nozzle cleaning
Wetting head replacement if required
Replacement of Collector tank cone
Checking/replacement (if required) of Impingement plate/wear plate/baffle plate inside each Collector tank
Checking/replacement (if required) of Collector tank drop pipe
Wet mode air washer nozzle cleaning /replacement. Ash cleaning inside of air washer.
Fluidizing airline flushing/cleaning For ESP hoppers
Fly ash pipeline (6", 8" & 10") checking /replacement, if required
Fly ash pipe line (vacuum line) bend, elbow, lateral, match piece checking & replacement
Checking/servicing/replacement of Segregating valves 200 NB and 250 NB.
Checking/servicing/Replacement of vacuum breakers
Servicing / Replacement of all water line valves of FAE Tower ,necessary rectification if required
Water washing of 200 NB Vacuum line from Vacuum pump to Collector Tank, Vacuum Pump and Silencer
i)Replacement of different sizes of Water/Slurry pipeline (200 NB & above ) ii)Replacement of Vacuum Pumps Suction lines
Replacement of different sizes of water pipeline (15 NB to 150 NB )
Cleaning of Buffer hopper, Intermediate Surge hopper, Transfer hopper, Air lock vessels and disposal of ash from worksite to suitable place (as per instruction of department) for FAE tower #4A & #4B
Each Air lock vessel#s top & bottom gate seat and disc checking/replacement(if required)
Each air lock vessel's vent/equalizing valves, venting & equalizing line, air lock vessel#s fluidizing pad checking and if required, dismantling and repairing and replacement if required
Intermediate Surge hopper wall body welding checking, repairing and strengthening
Checking/replacement of each Transfer vessel fluidizing tiles, top & bottom gate, vent/equalizing valve
Checking/repairing/replacement of square tiles with gasket of Intermediate Surge hopper.
Checking/cleaning/replacement of total filter bags for all buffer hoppers of FAE tower #4A & #4B including pulse jetting ba
Installation of different types of valve (20 NB to 250 NB) for ash handling system 70.000 Number 545.59 38,191.30
Fabrication & Erection of Platforms with hand rail at different areas at AHP, STG-2 i) ISH#3A & 3B Top plate replacement. ii) ISH# 3A & 3B seal box area enhancement. iii) Erection of platform below 16 Nos. Branch Segregating Valves
i)Couplings /Bends/Lateral checking and rectification by fabrication if required for 200NB and above pipe lines. ii) Replacement of coupling and gasket 200NB/250NB CI lines at U#4, ESP& APH
Replacement/repairing of flushing Apparatus of Economizer hoppers
Replacement/repairing of seal box of Economizer hoppers
Rotation of 200NB C.I Pipe Lines of U#3 ESP&APH Hoppers with inside cleaning of pipelines
Rotation of 250NB C.I Lines of U#3 ESP& APH Hoppers with inside cleaning of pipe lines
Refractory cooling header(100NB,SS316) And cooling water supply pipe (25 NB, SS 316) checking, fabrication & replacement
Adopter below ESP Hoppers & APH Hoppers Checking, repairing & replacement if required
Checking and Servicing/replacement of Manual KGV below ESP & APH Hoppers
Dismantling & Replacement of bottom hopper feed gate including pneumatic cylinder assembly
Replacement and strengthening along with encasing of clinker grinder drive motor base frame including dismantling and re-erection of drive motor, Gear Box and Fluid coupling
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .