| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.4 LAccepted-Finance UTTAR SONAKHALI NARAYANTALA BASANTI SOUTH 24 PARGANAS | BASANTI | SOUTH 24 PARGANAS | WEST BENGAL | ₹66.4 L | L1 | Accepted-Finance ok |
| 2 | L2₹71.2 LAccepted-Finance VILL CHAKRAMNATH P O P S KULPI SOUTH 24 PARGANAS 743351 | KULPI | SOUTH 24 PARGANAS | WEST BENGAL | 743351 | ₹71.2 L | L2 | Accepted-Finance ok |
| 3 | L3₹73.8 LAccepted-Finance | ₹73.8 L | L3 | Accepted-Finance ok |
| Sl No | Description | Qty | Unit | M/S. AVISIKTA L2 | RKS ENGINEER & CONTRACTOR L3 | TARUN ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00Drawl of 33KV XLPE 3CX400SMM Cable for 33KV DC HT line from Minakhan132KV to Jibantala 33/11KV substation under Canning Division.. | ||||||
| 1.01 | SURVEY OF HTUG LINE | 2.84 | KM | 3,300 ₹9,372 | 3,500 ₹9,940 | 3,000 ₹8,520 |
| 1.02 | EXCAVATION OF SOIL FOR FORMATION OF TRAIL HOLE | 7.92 | CUM | 36 ₹285.12 | 39 ₹308.88 | 34 ₹269.28 |
| 1.03 | LAYING AND DRESSING OF 33KV XLPE 400 SQMM CABLE IN THE EXCAVATION CABLE TRENCHES AS PER INSTRUCTION OF SITE ENGG | 4,080 | MTR | 80 ₹3.3 L | 92 ₹3.8 L | 75 ₹3.1 L |
| 1.04 | MICRO TUNNELLING WORK WITH LAYING OF HDPE PIPE 200 MM DIA AS PER INSTRUCTION OF SITE ENGINEER AND AS PER SITE CONDITION FOR LAYING OF UG CABLE AND SUPPLY OF HDPE PIPE | 3,880 | MTR | 1,655 ₹64.2 L | 1,695 ₹65.8 L | 1,540.27 ₹59.8 L |
| 1.05 | EXCAVATION OF SOIL FOR FORMATION OF CABLE TRENCH | 709.8 | CUM | 23 ₹16,325.40 | 30 ₹21,294 | 21 ₹14,905.80 |
| 1.06 | SUPPLY AND INSTALLATION OE KILN BURNT BRICK HAVING PROPER SIZE AND SHAPE FOR CABLE PROTECTIVE COVER AS PER INSTRUCTION OF THE SITE ENGINEER. | 5,400 | NOS | 9.5 ₹51,300 | 11 ₹59,400 | 9.22 ₹49,788 |
| 1.07 | MAKING & FIXING OF OUTDOOR TERMINATION JOINT FOR 33KV XLPE 400 SQMNM CABLE INCLUDING FIXING OF THE JOINTING BOX AT THE EXISTING STRUCTURE BUT WITHOUT THE JOINTING MATERIAS | 8 | NOS | 2,400 ₹19,200 | 2,800 ₹22,400 | 2,200 ₹17,600 |
| 1.08 | MAKING OF STRAIGHT THROUGH JOINT INCLUDING MAKING OF JOINTING PIT OF 33KV XLPE 400 SQMM CABLE WITHOUT SUPPLY OF JOINTING MATERIAL EXCLUDING MAKING OF PROTECTIVE DUCT FOR CABLE JOINT | 11 | NOS | 2,550 ₹28,050 | 2,900 ₹31,900 | 2,377 ₹26,147 |
| 1.09 | FIXING OF LA WITH LA BASE PLATE | 12 | NOS | 3,800 ₹45,600 | 4,500 ₹54,000 | 3,500 ₹42,000 |
Tender Value
₹66.4 L
EMD Value
₹1.3 L
Closing Date
12 Feb 2026, 5:00 pmClosed
DIVISIONAL MANAGER CANNING DIVISION
CANNING DIVISION , SPORTS COMPLEX ZILLA PARISAD BUILDING , 24 PARGANAS SOUTH
Drawl of 33KV XLPE 3CX400SMM Cable for 33KV DC HT line from Minakhan132KV to Jibantala 33/11KV substation under Canning Division..
2026_WBSED_992052_1
WBSEDCL/DM/CNG/25-26/18
Open Tender
Miscellaneous Services
CANNING DIVISION
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.3 L
11 Mar 2026
27 Jan 2026
16 Feb 2026
27 Jan 2026
12 Feb 2026
27 Jan 2026
Drawl of 33KV XLPE 3CX400SMM Cable for 33KV DC HT line from Minakhan132KV to Jibantala 33/11KV substation under Canning Division..
SURVEY OF HTUG LINE
EXCAVATION OF SOIL FOR FORMATION OF TRAIL HOLE
LAYING AND DRESSING OF 33KV XLPE 400 SQMM CABLE IN THE EXCAVATION CABLE TRENCHES AS PER INSTRUCTION OF SITE ENGG
MICRO TUNNELLING WORK WITH LAYING OF HDPE PIPE 200 MM DIA AS PER INSTRUCTION OF SITE ENGINEER AND AS PER SITE CONDITION FOR LAYING OF UG CABLE AND SUPPLY OF HDPE PIPE
EXCAVATION OF SOIL FOR FORMATION OF CABLE TRENCH
SUPPLY AND INSTALLATION OE KILN BURNT BRICK HAVING PROPER SIZE AND SHAPE FOR CABLE PROTECTIVE COVER AS PER INSTRUCTION OF THE SITE ENGINEER.
MAKING & FIXING OF OUTDOOR TERMINATION JOINT FOR 33KV XLPE 400 SQMNM CABLE INCLUDING FIXING OF THE JOINTING BOX AT THE EXISTING STRUCTURE BUT WITHOUT THE JOINTING MATERIAS
MAKING OF STRAIGHT THROUGH JOINT INCLUDING MAKING OF JOINTING PIT OF 33KV XLPE 400 SQMM CABLE WITHOUT SUPPLY OF JOINTING MATERIAL EXCLUDING MAKING OF PROTECTIVE DUCT FOR CABLE JOINT
FIXING OF LA WITH LA BASE PLATE
MAKING OF PROTECTIVE DUCT FOR CABLE JOINT COMPLETE AS PER WBSEDCL APPROVED DRAWING
SUPPLY AND FIXING OF GI PIPE 200MM DIA
SUPPLY AND FIXING OF CI CABLE MARKER
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.04 MB
BOQ_2425728.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid