Loading…
Loading…
Tender Value
₹2.5 L
EMD Value
₹6,353
Closing Date
5 Aug 2026, 2:00 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer, PWD Bridges Sub Division, Ernakulam
GENERAL-Bridge Safety-Ordinary Repair of Puthuval bridge,Arattuvazhy-2 bridge and Arattuvazhy-3 bridge in Vypin Constituency. Bridge Safety-General Civil Work
2026_PWD_844003_3
PWD/BR/TR/11355/2025_5_1_1/1
Open Tender
Civil Works - Bridges
Percentage
180 days
Puthuval
Please refer Tender documents.
7 documents required · 7 mandatory
₹560
Yes
₹6,353
Yes
27 Jul 2026
27 Jul 2026
7 Aug 2026
27 Jul 2026
5 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rehabilitation of bridges | |||||
| 1.001 | OD65567/2025-2026:Hire charge of boat including boat man, fuel and all other expense etc. complete | - | hour | 715 | - |
| 1.002 | OD63184/2025-2026:Drilling holes through the slab and beam for anchoring steel bars. | - | each | 268.08 | - |
| 1.003 | OD65307/2025-2026:Encasing the deteriorated surface with micro concrete so has to get a uniform size. Applying epoxy bonding agent on the existing concrete surface so as to get a well bonding with the new surface. The rate shall include the cost of material, labour charges of generator. All complete as per manufacture specification and as per the instruction of Engineer in Charge. | - | cum | 83,865.24 | - |
| 1.004 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | - | cum | 997.65 | - |
| 1.005 | OD63187/2025-2026:Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand :12 graded stone aggregate 20mm nominal size) upto plinth level with cement mortar 1:6 (1cement : 6course sand)
12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1
cement : 6 coarse sand). | 1 | cum | 6,978.06 | ₹6,971.08 |
| 1.006 | 12.7.B:Random Rubble Masonry (coursed/uncoursed ) Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. | - | cum | 12,123.52 | - |
| 1.007 | 14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications | - | MT | 1,30,935.47 | - |
| 1.008 | 13.5.E.P.1:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M20 - Using concrete Mixer - Height upto 5m | 1 | cum | 12,196.43 | ₹12,184.23 |
| 1.009 | 16.8:Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical Specification | 1 | sqm | 344.24 | ₹343.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
nitsbd.pdf
Tender Documents • 1.66 MB
BOQ_1459075.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .