| 1 | Admitted-Fee/PreQual/Technical/Finance ADMINISTRATIVE BUILDING SHIPYARD PREMISES SHIPYARD PREMISES M G ROAD PERUMANOOR ERNAKULAM KERALA ERNAKULAM KERALA 682015 | ERNAKULAM | KERALA | 682015 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹1.2 Cr
Closing Date
27 Dec 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE ADMIRAL SUPERINTENDENT
NSRY, KOCHI
DD AND ALLIED REPAIRS OF IN SHIPS/CRAFTS UNDER RATE CONTRACT (RC)
2021_NAVY_493938_1
PP/01/1000/MOU/RC/21
Single
Marine Services
Item Rate
21900 days
NSRY, Kochi
THE FIRM SHOULD HAVE SUITABLE FACILITY, SUFFICIENT INFRASTRUCTURE SET UP AT KOCHI AND MAN POWER FOR 24X7 SUPPORT FOR DD AND ALLIED REPAIRS OF IN SHIPS/CRAFTS UNDER RATE CONTRACT (RC)
4 documents required · 4 mandatory
₹0
₹1.2 Cr
Yes
28 Dec 2021
10 Dec 2021
28 Dec 2021
10 Dec 2021
27 Dec 2021
15 Dec 2021
13 Dec 2021 - 14 Dec 2021
180 days
Amount
GENERAL/TECHINICAL SERVICES
DOCKING AND UNDOCKING OF THE VESSEL(Vessel upto 5500 GRT)
(A) DOCKING -FIRST DAY IN DOCK
(B) SUBSEQUENT DAYS IN DOCK
(C) ASSISTANCE FOR DOCKING & UNDOCKING (QUOTE AS ONE UNIT)
(D) ARRANGE PILOTAGE FOR TAKING THE VESSEL FROM NAVAL JETTY TO YARD BERTH/DOCKING/ UNDOCKING/DELIVERY OF VESSEL BACK AT NAVAL JETTY.
(E) MOORING/UNMOORING AND LINE HANDLING FOR EACH OPERATION ESTIMATED FOR EACH OPERATION
PROVIDE WHARFAGE / WET BASIN FACILITIES (Vessel upto 5500 GRT)
DOCK BLOCK PREPARATION (BOTH CENTER LINE AND SIDE BLOCKS) FOR DOCKING OF SHIP IN REQUIRED VERSION. SHIPYARD TO ARRANGE FOR THIRD PARTY INSPECTION AND HAND OVER DULY RECOMMENDED CERTIFICATE FOR DOCK BLOCK PREPARATION TO NAVY POST INSPECTION
SIDE BLOCK FABRICATION.(Shaped block)
ARRANGEMENT OF DOCK BLOCKS FOR DRYDOCKING
SHIPYARD TO PROVIDE PORTABLE AC UNIT (CAPACITY 15 TR ) DURING THE PERIOD OF WHARFAGE AND DRY DOCKING. ADEQUATE FLEXIBLE HOSES TO CARRY CHILLED AIR FROM PORTABLE AC UNITS TO ACCOMMODATION AREAS, IN SHIPS SUPERSTRUCTURE AND BELOW DECKS AND ELECTRONICS/ CONTROLS/SENSOR COMPARTMENTS OF THE SHIP TO BE CATERED BY SHIP YARD. PAYMENT AT ACTUALS. RIGGING OF REQUIRED HOSES WIL BE RESPONSIBILITY OF THE SHIPYARD.
PROVIDE FRESH WATER ONBOARD PAYMENT AT ACTUAL NUMBER OF DAYS
Supply of fresh water from shoreline
Connection & disconnection per hose
PROVIDE FACILITIES FOR GARBAGE COLLECTION AND DISPOSAL ARRANGEMENTS (15 KG EACH) TWICE PER DAY . PAYMENT AT ACTUAL NUMBER OF DAYS.
PROVIDE CRANE 10-15 TON CAPACITY DURING THE REFIT (FOR NAVY'S EQUIPMENT)
PROVIDE ONE FIRE FIGHTING TRAINED HOT WORK SENTRY FOR 16 HRS EACH DAY. NUMBER OF SENTRIES REQUIRED WILL BE INTIMATED BASED ON SHIP YARDS REQUISITION FOR HOT WORK RECEIVED THE PREVIOUS DAY. PAYMENT AT ACTUALS
PROVIDE ONE FIRE FIGHTING TRAINED HOT WORK SUPERVISOR FOR 16 HRS EACH DAY. PAYMENT AT ACTUALS
PROVIDE TEMPORARY LIGHTING AND VENTILATION ONBOARD IN ALL MACHINERY COMPARTMENTS, COMPARTMENTS WITHIN SUPERSTRUCTURE, ALL ALLEYWAYS/ PASSAGE WAYS, CARGO SPACE. BALLAST TANK MUST BE WELL LIT WITH 24 VDC LAMPS. PROVISION OF MAXIMUM 20 LIGHT POINTS.
PROVISION OF PORTABLE INTAKE/ EXHAUST BLOWER OF WITH ADEQUATE HOSING ARRANGEMENT. ARRANGEMENT ON AS REQUIRED BASIS. PAYMENT AT ACTUALS.
Hire charge per blower with hose(Ordinary)
Hire charge per blower with hose(Explosion proof)
Connection and disconnection per fan
PROVISION OF SHORE POWER 3 PHASE, 415V, 50HZ IN DRY DOCK & WHARFAGE. POWER SUPPLY CABLE AND POWER METER/ENERGY TO BE PROVIDED BY SHIPYARD. PAYMENT AT ACTUALS AS PER FINAL READING. (B) CONNECTION/ DISCONNECTION (C) SHIP SHOULD BE EARTHED AT 04 POINTS WHILE IN DRY DOCK. EARTHING CABLE TO BE SUPPLIED BY SHIPYARD.
Providing shore power PER KWH
Connection & disconnection
Earthing of Ship at 04 points while in dry dock
PROVIDE SEA WATER FIRE MAIN CONNECTION WITH 06 BAR PRESSURE FOR ENTIRE DURATION WITH CONTROL VALVES AND NECESSARY SUPPLY HOSES. SHIPYARD TO CONNECT REFERENCE PRESSURE GAUGE AT DISCHARGE LINE. CALIBRATION CERTIFICATE OF PRESSURE GAUGES TO BE SUBMITTED
Providing fire line /Maintain pressure per hose
Connection & disconnection per hose
A) PROVIDE ONE INDUCTIVE CUM RESISTIVE LOAD BANK OF UPTO 500 KW FOR LOAD TRIALS OF DA INCLUDING OPERATOR CREW FOR 8 HOURS EACH DAY SUBJECT TO AVAILABILITY. PAYMENT AT ACTUALS.
B) SHIFTING/ CONNECTION.
C) MINIMUM CHARGE OF INDUCTIVE CUM RESISTIVE LOAD BANK OF UPTO 500 KW
ADMIN SERVICES
FURNISHED CONFERENCE HALL WITH CONFERENCE TABLE, HIGH BACK EXECUTIVE CHAIRS, 15 SEATING CAPACITY, FHD PROJECTOR, PC AND MULTIMEDIA COMMUNICATION FACILITY (3 X 50 " DISPLAY UNITS) FOR CONDUCTING REFIT PROGRESS MEETINGS AT SHIPYARD AND DISCUSSIONS WITH OEM/TRADE AND SHIP STAFF TO BE PROVIDED TO REFIT MONITORING TEAM. PAYMENT AT ACTUALS.SUBJECT TO AVAILABILITY.
SEPARATE SHORE TOILET/ WASHROOM FOR SHIPS OFFICERS AND CREW SUITABLE FOR MAX 15 OFFICERS AND 120 SAILORS. PAYMENT AT ACTUALS.SUBJECT TO AVAILABILITY.
AC DINING HALL AND GALLEY (A) AC DINING HALL WITH SOFA SET, 55" FULL HD LED TV, DTH SATELLITE HD CABLE CONNECTION. DINING TABLE AND CHAIRS, CATERING FOR DINING OF 15 OFFICERS AT A TIME . (B)AC DINING HALL WITH 55' LED TV, DTH SATELLITE HD CABLE CONNECTION, SUITABLE DINING TABLE AND CHAIRS, CATERING FOR DINING OF 120 SAILORS AT A TIME . (C)PROVISION OF SHORE GALLEY WITH 04 LPG BURNERS/ ELECTRIC HOT PLATES, INCLUDING COST OF GAS/ ELECTRICITY AND SINK WITH WATER CONNECTION FOR WASHING OF PLATES, UTENSILS ETC. FRESH WATER RO PURIFIER/ HEAVY DUTY AQUAGUARD TO BE FITTED FOR MEETING GALLEY AND SHIPS CREW WATER REQUIREMENT (AT TWO LOCATIONS VIZ GALLEY AND DINING HALL). SUBJECT TO AVAILABILITY. PAYMENT AT ACTUALS DAYS USED.
SUPPLY 300 LITERS( 20Ltr x15 Nos can)OF DRINKING WATER PER DAY ONBOARD.
PROVIDE STD LAND LINE WITH FAX FACILITY IN PROJECT OFFICE.
AIR CONDITIONED & FURNISHED OFFICE SPACE (400 SO FEET) WITH ATTACHED TOILET FOR COMMANDING OFFICER L- SHAPED TABLE AND HIGH BACK EXECUTIVE CHAIR, FIRMLY MOUNTED GODREJ SAFE AND 01 STRONG LOCKER, VISITOR SOFA SET, COFFEE/TEA VENDING MACHINE, HIGH SPEED INTERNET CONNECTION, LED TV, DTH, STD LINE AND FAX FACILITY AT SHORE WITHIN 200 M OF SHIP'S BERTH. PANTRY AREA TO BE PROVIDED WITH BELL, MICROWAVE OVEN, INDUCTION COOKER, REFRIGERATOR. CUPBOARD FOR STORAGE OF CUTLERY, SUFFICIENT AREA FOR FOOD HANDLING AND WASH BASIN (2X2) WITH FRESH WATER SUPPLY THROUGH RO/AQUAGUARD
AIR CONDITIONED OFFICE FOR SHIPS OFFICERS ALONG WITH OFFICE FURNITURE, STD LINE, FAX FACILITY, PRINTER WITH SCAN AND XEROX FACILITY
AIR CONDITIONED OFFICE SPACE FOR PROJECT OFFICER ALONG WITH 04 SUPERVISORS WITH WORK STATION, FURNITURE AND ONE COMPUTER/ LAPTOP (WINDOWS 10 OR HIGHER) WITH HIGH SPEED BROADBAND INTERNET CONNECTIVITY, LASER PRINTER (4 IN 1) XEROX AND SCAN FACILITY & OFFICE STATIONERY
OFFICE SPACE FOR REFIT OFFICE. WORK STATIONS FOR 06 SAILORS WITH TELEPHONE EXTENSION LINES. 01 HEAVY DUTY XEROX MACHINE AND STORAGE RACKS FOR KEEPING FILES.
HD CABLE TV CONNECTION ONBOARD DURING REFIT PERIOD (MINIMUM 30 DAYS)
PROVIDE ONE CHANGING ROOM WITH LOCKERS AND ATTACHED WASH ROOM FOR 10 NSRY(K)WORKERS
DAILY MAINTENANCE/UPKEEP/CLEAN SHIP OF ABOVE MENTIONED ROOMS/HALLS/OFFICE SPACES/WASHROOMS
PROVIDE CONTAINER/LAY-APART STORE FOR STOWAGE AND PRESERVATION OF ITEMS DURING REFIT TIME.
PROVIDE SEPARATE AC PORTABLE CABINS FOR ODD AND DUTY WATCH DURING NIGHT ADJACENT TO SHIP IN JETTY PER CABIN
PROVIDE A TWO TON TRUCK (WITH TRANSIT INSURANCE, PACKING AND LOADING) FOR TRANSPORTING SHIPS MATERIAL/SPARES FROM CSL TO MO(K)NSRY(K) FOR 10 HRS/100 KMS PER DAY WHICHEVER IS LESS. REQUIREMENT FOR TRANSPORT WILL BE INTIMATED ONE DAY IN ADVANCE. PAYMENT AT ACTUALS
PROVIDE FIVE SEATER AC SEDAN CAR (MAX:15 HRS/150 KMS PER DAY, WHICHEVER IS LESS)
PROVIDE ONE 18 SEATER AC MINI BUS (10 HRS/100 KMS PER DAY, WHICHEVER IS LESS).
PROVIDE ONE 50 SEATER BUS(10HRS/100 KM PER DAY. WHICHEVER IS LESS)
PROVIDE A 40 TON TRUCK (WITH TRANSIT INSURANCE, PACKING AND LOADING) FOR TRANSPORTING SHIPS MATERIAL/SPARES FROM CSL TO MO(K)/NSRY(K) AND BACK FOR 10 HRS/100 KMS PER DAY WHICHEVER IS LESS. REQUIREMENT FOR TRANSPORT WILL BE INTIMATED ONE DAY IN ADVANCE, PAYMENT AT ACTUALS
STATIONARY ITEMS FOR NSRY/PROJECT MONITORING TEAM OFFICE PROVIDE STATIONARY/OFFICE ITEMS FOR ENTIRE RC DURATION (CONSUMABLE/NON-RETURNABLE). DETAILED REQUIREMENT WILL BE INTIMATED BY NSRY (KOC)/PROJECT MONITORING TEAM OFFICE ON AS REQUIRED BASIS.CATER BUDGET OF RS.20,000/- PER MONTH, PAYMENT AT ACTUALS.
UNDER WATER HULL CLEANING OF MARINE FOULING ON PROPELLER,RUDDER AND UNDERWATER GRATINGS.
UNDER WATER HULL CLEAN UNDERWATER PORTION OF HULL USING HYDRO JETTING WITH MAXIMUM PRESSURE NOT EXCEEDING 3000 PSI AND SCRAP MARINE GROWTH AND LOOSE PAINT FILM UP TO 500 MM ABOVE BOOT TOP AREA, SHAFT BRACKETS, ROPE GUARDS, EDDY PLATES, RUDDERS, SEA CHESTS/TUBES, BOW DOOR AND RAMP ETC.
UNDER WATER HULL , BULWARK AND TRANSOM AREA
A) ABRASIVE BLASTING & FULL COAT PAINTING
B) COPPER SLAG SWEEPING AND ONE COAT OF ANTI FOULING
RATES FOR EACH OPERATION
A) HP WASHING.
B) COPPER SLAG SWEEPING TO SA1
C) COPPER SLAG BLASTING TO SA2 / SA 2.5)
D) LP WASHING
E) PAINTING / PRIMING PER COAT
DECK: I) WEATHER DECK
A) HYDRO BLASTING AND PAINTING.
B) HYDRO BLASTING OF FITTINGS ON DECK
II) HELLO DECK
A) VACUUM / HYDRO JET BLASTING & PAINTING
SUPER STRUCTURE
A) HYDRO BLASTING AND PAINTING.
A) HP WASHING & ONE COAT PAINTING
TANKS
A) OPEN MANHOLE COVERS OF TANKS & OBTAIN GAS FREE CERTIFICATE.
B) CLEANING OF TANK INSIDE SURFACE FOR HOTWORK / SURVEY
C) REMOVAL AND DISPOSAL OF SLUDGE
D) REMOVAL AND DISPOSAL OF OILY WATER
E) REMOVAL AND DISPOSAL OF WATER
F) REMOVAL AND DISPOSAL OF MUD/MUCK
G) ST3 PREPARATION & PAINTING
BILGE AREA
ST3 PREPARATION & PAINTING
UT GAUGING: CARRY OUT ULTRA SONIC GAUGE SURVEY .
A) UT GAUGING PER SPOT
B) UT GAUGING MINIMUM CHARGE
RATES FOR STAGING
A) BUILD UP STAGE UPTO 3 MTRS FROM BOTTOM
B) BUILD UP STAGE UPTO 6 MTRS FROM BOTTOM
C) BUILD UP STAGE UPTO 9 MTRS FROM BOTTOM
UNDER WATER HULL CARRYOUT 100% VISUAL HULL SURVEY OF EXTERNAL ABOVE WATER AND UNDERWATER HULL PAYING PARTICULAR ATTENTION TO PLATING IN THE VICINITY OF PROPELLERS, SHAFT AND SHAFT BRACKETS, ROPE GUARDS, EDDY PLATES, RUDDERS, FITTING UP TO THE RUDDER HEAD, KEEL AND HULL PLATING REST ON CLOSELY SPACED DOCKING BLOCKS, DOUBLE BOTTOM TANKS, PEAK TANKS FOR SIGNS OF CORROSION, DEFECTS AND DAMAGE.
UNDER WATER HULL VISUAL SURVEY OF ALL THE BILGES TO BE CARRIED OUT. NOTE- POST COMPLETION OF UNDER WATER AND ABOVE WATER HULL SURVEY, 07 COPIES OF SURVEY REPORT (AS PER IN STANDARDS) TO BE PREPARED AND HANDED TO NSRY(KOC)/RMT. COST FOR THE SAME TO BE COVERED.
PAINT SCHEME OF ALL TECHNICAL WINDOWS
A) DRY SURVEY OF WELD JOINTS AND SURROUNDING AREA TO REMOVE PITS/BURS AND SHARP EDGES.(GRINDING)
B) REPAIR OF WORNOUT WELD SEAMS OF SHIP STRUCTURE.
C) ABRASIVE BLASTING TO SA 2 / SA2.5 STANDARDS OF RENEWED PLATE
D) PAINT/PRIMER PER COAT
A) RENEWAL OF ANODE IN UNDERWATER AREA UPTO10 KG RENEW SACRIFICIAL ANODES WHEREVER CONSUMED MORE THAN 50%. WORK INVOLVES FOLLOWING BURN OUT THE OLD ANODES LUGS FROM HULL. DRY SURVEY OF THE BURN OUT AREA FOR SMOOTH HULL .WELDING OF NEW SACRIFICIAL ANODES AT THE LOCATION OF OLD ANODES.
B) RENEWAL OF ANODES IN TANKS - UPTO 10 KG RENEW SACRIFICIAL ANODES WHEREVER CONSUMED MORE THAN 50%. WORK INVOLVES FOLLOWING BURN OUT THE OLD ANODES LUGS AND REMOVE OLD ANODE.WELDING OF NEW SACRIFICIAL ANODES AT THE LOCATION OF OLD ANODES.
C) RENEWAL OF ANODES IN SEA CHEST RENEW SACRIFICIAL ANODES WHEREVER CONSUMED MORE THAN 50%. WORK INVOLVES FOLLOWING BURN OUT THE OLD ANODES LUGS AND REMOVE OLD ANODE.WELDING OF NEW SACRIFICIAL ANODES AT/ADJACENT TO THE LOCATION OF OLD ANODES.
CLEAN SACRIFICIAL ANODES IN UNDER WATER HULL WITH STEEL WIRE BRUSH. NOTE:- ANY PAINT OR COATING OVER THE ANODES IS TO BE SCRAPPED CLEAN BEFORE UNDOCKING
NOTE:- DETAILS OF VARIOUS TYPES OF ANODES IS APPENDED BELOW: I) MK-II SACRIFICIAL ANODES FOR UNDER WATER SHELL PLATE & BALLAST TANK. II) MK-III SACRIFICIAL ANODES FOR UW SEA CHEST. III) MK-IV SACRIFICIAL ANODES. IV) MK-V SACRIFICIAL ANODES FOR RUDDERS. v) MK-IV SACRIFICIAL ANODES
RENEW DAMAGED DRAUGHT MARKS (PORT & STBD). SIZE -LENGTH OF DIGIT 100 MM, THICKNESS 8MM. VERTICAL GAP BETWEEN DIGIT- 100MM AND HORIZONTAL GAP BETWEEN DIGIT- 20MM. LOCATION - (I) FORWARD (PORT & STBD) (II) MID SHIP (PORT & STBD). (III) AFT (PORT & STBD).DRY SURVEY TO BE CARRIED OUT AFTER RENEWAL AND WELDING OF DRAFT MARKS.
DRAUGHT MARKS AND PENNANT NUMBER
A) DRAUGHT MARKS TO BE PRIMED/PAINTED WITH COMPLETE PAINT SCHEME AS APPROPRIATE FOR UNDER WATER AND ABOVE WATER AREA AND FINAL COAT TO BE PAINTED WITH WHITE PAINT AS PER NO 53-16.
B) RENEWAL OF SHIPS PENNANT NUMBER
C )SHIPS PENNANT NUMBER WITH WHITE AND BLACK PAINT TO BE PAINTED AT PORT, STBD SIDE AND AFT CUT UP AREA AS PER NO 53-16.
PAINT SHAFT BRACKETS AS PER NO 53/16
PAINT WATER INLETS AND DISCHARGES IN HULL IN ACCORDANCE WITH NO 53116 AND POLICY ISSUED BY IHQ/DNA.
SEA TUBES & SEA CHEST
A) CLEAN AND CARRY OUT ENDOSCOPIC SURVEY OF SEA TUBE AS PER NO 01/15 COVERING THE COMPLETE SURFACE OF SEA TUBE/SEA CHEST-ALL BRANCH PIPES/ FLUSH THROUGH LINES WELDED TO SEA CHEST/ SEA TUBE ARE TO BE SURVEYED AS PART OF SEA TUBE.
B) SEA TUBES NOT ACCESSIBLE FOR PRESERVATION BY PAINTING ARE TO BE GALVANIZED AND SPRAY COATED WITH PAINT SCHEME AS PER NO 53/16 AND POLICY DIRECTIVES ISSUED BY IHQ/DNA TIME TO TIME. NOTE:- SEA TUBES SITED WITHIN DIESEL OIL TANKS ARE NOT TO BE GALVANIZED ON THE TANK SIDE
C) CLEAN AND EXAMINE SEA TUBES EXTERNAL FOR EXTERNAL CORROSION, EXCESSIVE PITTING , CRACKS ETC.
D) VISUAL SURVEY OF (AS INDICATED BY SS) OF SEA TUBES INTERNAL POST REMOVAL OF VALVE.
E) CARRY OUT RENEWAL OF DEFECTIVE SEA TUBES AS PER THE SHIP CONSTRUCTION MATERIAL. PAINT AND PRESSURE TEST SEA TUBE UP TO 1.7 BAR POST RENEWAL.
F) SEA TUBES REMOVED FOR REPAIR TO BE ABRASIVE BLASTED AND COATED WITH PAINT SCHEME AS PER NO 53/16 AND POLICY DIRECTIVES ISSUED BY IHQ/DNA , FAIRING PLATES LAPS, WELDS ETC TO BE FAIRED WITH EPOXY PUTTY BEFORE APPLICATION OF PAINT .PRESSURE TEST REPAIRED SEA TUBES UP TO 1.7 KG/SQCM FURTHER, SUBMIT DETAILED REPORT SEA TUBE WISE TO SHIP STAFF.
G) REMOVE & CLEAN GRATINGS FOR SURVEY, RENEW DEFECTIVE/ WORN OUT FASTENERS, MAT-STUDS/ NUTS - SS,
TANKS CARRYOUT AIR PRESSURE TESTING OF TANKS.TEST PRESSURE 0.15 KG/SQCM
SUBSEQUENT AIR PRESSURE TESTING OF TANKS.TEST PRESSURE 0.15 KG/SQCM
ANCHOR,CABLE AND CHAIN LOCKER
A) DISMANTLE ANCHORS, SWIVEL PIECES AND D-SHACKLE WITH PIN FROM ANCHOR CHAIN/STEEL WIRE ROPE. SHIP YARD TO HIRE THIRD PARTY INSPECTION OR SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE OR IRS OR ABS FOR SURVEY AND INSPECTION. UNDERTAKE MANDATED REPAIRS AND CARRY OUT LOAD TEST OF ANCHOR STROP
B) DISCONNECT AND CHANGE END TO END EACH CABLE/EACH LENGTH
C) REMOVING MUD,MUCK AND WATER (Assuming total 0.5 cum of mud from both chain lockers),SPOT CHIPPING, SCRAPING , WIRE BRUSHING RUSTY PORTION AND PAINTING ON BOTH CHAIN LOCKERS.
SHIP'S STRUCTURE - STEEL RENEWAL (A) RENEWAL OF STEEL PLATES (4-16 MM) AND STRUCTURAL SECTIONS OF ENTIRE SHIP INCLUDING FOLLOWING LOCATIONS : (I) UNDERWATER HULL (II) UNDERWATER COMPARTMENTS (III) SHIP'S TANKS (IV) INTERNAL AW COMPARTMENTS (V) WEATHER DECKS (VI) SHIP SIDE/ BULWARK AREAS (VII) SUPERSTRUCTURE NOTE: (I) DMR249A STEEL PLATES PROVIDED BY NAVY .CONSUMABLES PROVIDED BY SHIPYARD. (II) COST DOES NOT INCLUDE COST OF INWAY JOBS AND COST OF CLEANING NECESSARY FOR HOT WORK. (III) TESTING OF ALL WELD JOINTS BY DYE PENETRANT SHALL BE CARRIED OUT ONCE AFTER COMPLETION OF ROOT RUN AND FINALLY ON COMPLETION OF ALL WELD RUNS FOLLOWED BY WATER HOSE TEST (3 KG/SQCM PRESSURE), (IV) DETAILS OF STRUCTURAL RENEWALS TO BE INCORPORATED IN RESPECTIVE DECK PLANS GIVING ALL DETAILS AND SUBMITTED FOR INFORMATION AND RECORD.
A) STEEL RENEWAL AT HULL , DECK , BULWARK, SUPERSTRUCTURE. MIN CHARGE PER LOCATION INR22500/-
B) STEEL RENEWAL IN COMPARTMENTS & TANKS MIN CHARGE PER LOCATION INR 27000/-
DEGUTTING AND REGUTTING FOR STEEL RENEWAL: LAGGING
(A) RENEWAL OF HOT LAGGING. (INCL OF MATERIAL COST )
(B) RENEWAL OF MFMB/MWMB LAGGING (INCL OF MATERIAL COST)
RENEWAL OF COLD LAGGING upto 150 NB PIPE(INCL OF MATERIAL COST)
PANELLING
(A) RENEWAL OF WOODEN / SUNMICA PANELLING IN CABINS/ MESSES/MARINE BOARD PANELLING (CEILING/BHD) (INCL OF MATERIAL COST)
RENEWAL OF SS PANELLING IN BATHROOM( GALLEY/ WCS (INCL OF MATERIAL COST)
A) RENEWAL OF CRCA PANELLING (INCL OF MATERIAL COST)
B) RENEWAL OF SANDWICH PANELLING(INCL OF MATERIAL COST)
REMOVAL AND REFIT OF PANELL
UNDERLAY/ DECK COVERING
RENEWAL OF DECK UNDERLAY IN WET SPACES
RENEWAL OF DECK UNDERLAY IN DRY AREA SPACES
RENEWAL OF DECK UNDERLAY IN WET SPACES - TOP COAT ONLY.
RENEWAL OF DECK UNDERLAY IN DRY AREA SPACES - TOP COAT ONLY
DEGUTTING AND REGUTTING OF ELECTRIC WIRES (EXISTING)
A) UP TO 15 MM DIA
B) ABOVE 16 MM UP TO 50 MM DIA
C) ABOVE 51 MM
DEGUTTING AND REGUTTING (REMOVE/REFIT) OF PIPE .
Up to 50 NB
MISC.STEEL RENEWAL(Ladder,Hatch,Manhole,Door etc Using Yard supplied Grade A Steel)
A) STEEL RENEWAL
B) MINIMUM CHARGE
C) MINIMUM CHARGE FOR LUG , CLEAT ETC
RENEWAL OF SCUPPER LIPS ON SHIP SIDE PERISHED.MAT:NEOPRENE RUBBER. WORK ALSO INVOLVES DEGUTTING AND REGUTTING OF LAGGING/PANELING, SCUPPER LIPS BRACKETS. MAT: MS.
CARRY OUT REPAIR OF ISOLATED PITS OF SIZE MAXIMUM 25MM BY 25 MM AND AVERAGE DEPTH OF 4 MM WITH APPROPRIATE WELDING CONSUMABLE NOTE:- SCOPE OF WORK INVOLVES THE FOLLOWING : (I) PREPARING PITTED SURFACE BY BURR CUTTER / GRINDING WHEEL, DEPOSITION OF WELD METAL, CARRYING OUT VISUAL INSPECTION & DPT, GRINDING OF BUILT UP SURFACE SMOOTH FOLLOWED BY APPLICATION OF COMPATIBLE PRIMER COATING (II) RECORD OF REPAIR TO BE MAINTAINED AND MARKED ON STRUCTURAL DRAWING / SHELL EXPANSION BY THE SHIP REPAIR YARD. THESE RECORDS ARE TO BE FORWARDED TO SHIP STAFF AND WORK MONITORING TEAM/ HITU.
WELD SEAM REPAIR OF WORNOUT WELD SEAMS OF SHIP STRUCTURE.
LADDERS
RENEWAL OF LADDER STEPS (MAT- MS)
RENEWAL OF LADDER STEPS (ALUMINUIM CHEQURED )
ALUMINIUM RENEWAL A) UNDERTAKE ALUMINIUM RENEWAL JOBS ONBOARD.
B) MINIMUM CHARGE
GUARD RAILS. GUARD RAIL PIPES (MATERIAL CARBON STEEL) UNDERTAKE GUARD RAIL PIPE RENEWAL:-
(A) 26 TO 50 MM DIA (OD)
(B) 51 TO 80 MM DIA
VENTILATION COWLING OVERHAUL / REPAIRS TO VENTILATION COWLING. SCOPE INVOLVES THE FOLLOWING:- (A) DEGUTTING AND REGUTTING OF VENTILATION COWL FOR REPAIRS. (B) REMOVE, OVERHAUL AND EASED THE FLAP.
MUSHROOM HEADS REMOVAL, DISMANTLE, OVERHAUL AND REGUTTING OF MUSHROOM HEADS:- (A) UPTO 400MM DIA.
MUSHROOM HEADS REMOVAL, DISMANTLE, OVERHAUL AND REGUTTING OF MUSHROOM HEADS.- (B) 400MM TO 600MM DIA.
EXHAUST TRUNKING CLEANING BLOW THROUGH AND REPAIRS TO EXHAUST TRUNKING SIZE: 300MM DIA (RATE FOR REPAIR AND LAGGING GIVEN BELOW)
REPAIR OF TRUNKING (Upto 300 mm dia)
RENEWAL OF TRUNKING (Up to 300 mm dia)
RENEWAL OF HOT LAGGING
A) BLOW THROUGH OF VENTILATION TRUNKING WITH COMPRESSED AIR (Insitu Max:300 mm Dia)
B) R/REFIT AND CLEANING OF VENTILATION TRUNKING (Max:300 mm Dia)
C) REPAIRS IF ANY (Max:300 mm Dia)
STRIP AND CLEAN SOIL AND URINAL DRAIN PIPES.
100NB & BELOW
ABOVE 100NB upto 200NB
OVERHAULING OF PORT HOLES.
RENEW STUDS OF MANHOLE COVERS AND COAMING OF TANKS
RENEWAL OF EACH STUD
OPEN/CLOSE OF MANHOLE COVER WITH NEW PACKING
UNDERTAKE HOSE TEST OF NON WATERTIGHT COMPARTMENT
RENEWAL OF RUBBER BEADING OF DOORS WITH SILICON RUBBER BEADING. MATERIAL PROVIDED BY SHIPYARD.POST FITMENT CHALK TEST OF ALL DOORS TO BE UNDERTAKEN IN PRESENCE OF HITU AND SS.
REPAIR/ RENEWAL OF JAMMED LOCKING MECHANISM OF WT DOORS, POST REPAIRS. CHALK TEST TO BE UNDERTAKEN IN PRESENCE OF HITU.
HATCHES
RENEWAL OF RUBBER BEADING OF HATCHES WITH SILICON RUBBER BEADING. MATERIAL PROVIDED BY SHIPYARD.POST FITMENT CHALK TEST OF ALL DOORS TO BE UNDERTAKEN IN PRESENCE OF HITU AND SS.
REPAIR OF JAMMED LOCKING MECHANISM OF WT HATCHES. POST REPAIRS, CHALK TEST TO BE UNDERTAKEN IN PRESENCE OF HITU.
REPAIR OR RENEW DAMAGED OR CORRODED STANCHIONS ALONG WITH STANCHIONS SHOE. MAT- MS
RENEWAL OF RUBBER BEADING OF COOL AND COLD ROOM- INSITU
UNDERTAKE HOSE TEST OF NON WATERTIGHT COMPARTMENT
ENGINEERING WORK PACKAGE.
TAIL SHAFT
A) TAIL SHAFT SURVEY INCLUDING DRAW OUT/ IN SHAFT (UPTO 250 MM DIA SHAFT)
B) CHECK CLEARANCE OF A-BRACKET BEARINGS. RENEW IF NECESSARY.
C) RENEWALOF DEEP SEA SEAL / STERN TUBE SEAL
SURVEY AND REPAIR OF PROTECTIVE COATING OF TAIL SHAFT DIA UPTO 250 MM.
CHECK THE BEARING CLEARANCE OF FWD AND AFT END STERN TUBE BEARINGS WITH THE HELP OF HOW WEAR DOWN GAUGE, COMPARE VALUES WITH THE RE FERRENCE READINGS.
RUDDER
A) MEASURE RUDDER CLEARANCES
B) LOWER RUDDER ,SURVEY, RE INSTALLATION AND RENEWAL OF RUDDER BUSH
C) PRESSURE TESTING OF RUDDER
PLUMMER BLOCK
UNDERTAKE SAMPLE INSPECTION OF PLUMMER BEARINGS ON EACH SHAFT LINE FOR SCORING/CORROSION.
PIPE WORK: I)RENEWAL OF DEFECTIVE PIPES OF SHIP SYSTEM AS NECESSARY MATERIALS :- 90/10 CUNI , CARBON STEEL AND GALVANIZED CARBON STEEL PIPES
90/10 CUNI PIPE
Renew 200 NB 90/10 CuNi pipe.
Renew 150 NB 90/10 CuNi pipe.
Renew 125 NB 90/10 CuNi pipe.
Renew 100 NB 90/10 CuNi pipe.
Renew 80 NB 90/10 CuNi pipe.
Renew 65 NB 90/10 CuNi pipe.
Renew upto 50 NB 90/10 CuNi pipe.
70/30 CUNI PIPE
Renew 200 NB 70/30 CuNi pipe.
Renew 150 NB 70/30 CuNi pipe.
Renew 125 NB 70/30 CuNi pipe.
Renew 100 NB 70/30 CuNi pipe.
Renew 80 NB 70/30 CuNi pipe.
Renew 65 NB 70/30 CuNi pipe.
Renew upto 50 NB 70/30 CuNi pipe.
GI PIPE
Renew 200 NB GI pipe
Renew 150 NB GI pipe
Renew 125 NB GI pipe
Renew 100 NB GI pipe
Renew 80 NB GI pipe
Renew 65 NB GI pipe
Renew upto 50 NB GI pipe
MS/ CARBON STEEL PIPE
Renew 200 NB MS pipe
Renew 150 NB MS pipe
Renew 125 NB MS pipe
Renew 100 NB MS pipe
Renew 80 NB MS pipe
Renew 65 NB MS pipe
Renew upto 50 NB MS pipe
II) REMOVE/REFIT OF PIPE .
Up to 50 NB
III) CHOKE CLEARING OF PIPE.
Up to 50 NB
SYSTEM PIPE BRACKETS/CLAMPS RENEWAL SECURING BRACKETS/ CLAMPS FOR VARIOUS PIPE LINES CORRODED. BRACKETS/ CLAMPS TO BE RENEWED AND WELDED AT SCATTERED PLACES. RUBBER JOINT TO BE RENEWED. JOB INVOLVES CUTTING OF OLD BRACKETS AND WELDING OF NEW BRACKETS. MAT - MS.
I) CLAMP/BRACKET RENEWAL INSITU
(A) 250 MM DIA CLAMP WITH BRACKET
(B) 200 MM DIA CLAMP WITH BRACKET
(C) 150 MM DIA CLAMP WITH BRACKET
(D) 125 MM DIA CLAMP WITH BRACKET
(E) 100 MM DIA CLAMP WITH BRACKET
(F) 80 MM DIA CLAMP WITH BRACKET
(G) 65 MM DIA CLAMP WITH BRACKET
(H) UP TO 50 MM DIA CLAMP WITH BRACKET
II) REMOVE/REFIT OF PIPE FOR CLAMP RENEWAL.
Up to 50 NB
UNDER WATER /OVER BOARD VALVES OVERHAULING VALVES TO BE REMOVED. OVERHAULED, PRESSURE TESTED, FITTED AND PROVED TO SHIP STAFF ONBOARD. PROCESS INVOLVES RENEWAL OF FLANGE JOINTS AND SECURING FASTENERS (MAT - GI /BRASS/SS).
(A) 400 NB SEACHEST / OVERBOARD VALVES
(B) 350 NB,300 NB & 250 NB SEACHEST / OVERBOARD VALVES
(C) 200 NB SEACHEST / OVERBOARD VALVES
(D) 100 NB,125NB & 150 NB SEACHEST / OVERBOARD VALVES
( E ) BELOW 100 NB SEACHEST / OVERBOARD VALVES
STRIP AND EXAMINE AND REFIT OF GEARED STORM VALVES , OVERHAULING OF STORM VALVES - SIZE UP TO 150 NB.
SHIP SYSTEM VALVES REMOVE , OVERHAUL , PRESSURE TEST, RECTIFY SHIP SYSTEM VALVES (GLOBE/GATE/BUTTERFLY) AND PROVE TO SHIP STAFF ONBOARD INCLUDING RENEWAL OF FLANGE JOINTS AND SECURING FASTENERS.
250 NB VALVE
200 NB VALVE
150 NB VALVE
125 NB VALVE
100 NB VALVE
80 NB VALVE
65 NB VALVE
Up to 50 NB VALVE
VALVE WHEEL- RENEWAL (Material :- M S/Carbon steel)
a) For 300NB , 250NB & 200 NB Valves
b) For 100NB ,125NB & 150 NB Valves
c) For Valves below 100NB
BILGE PLATES TO BE SECURED WITH THE FOUNDATION BY DZUS FASTENERS AT VARIOUS INTERNAL COMPARTMENT MATERIAL GALVANIZED
CARRY OUT CHEMICAL CLEANING AND PRESSURE TESTING OF HP AIR BOTTLES TO 1.5 TIMES OF WORKING PRESSURE WORKING PRESSURE - 30 BAR
A) OVERHAULING OF CENTRIFUGAL PUMP INCLUDING CHANGE OF BEARING.
UP TO 2 HP
ABOVE 2 HP UP TO 5 HP
ABOVE 5 HP UP TO 10 HP
ABOVE 10 HP UP TO 25 HP
ABOVE 25 HP UP TO 50 HP
ABOVE 50 HP UP TO 75 HP
ABOVE 75 HP UP TO 100 HP
B) OVERHAULING OF RECIPROCATING PUMP INCLUDING BEARING CHANGE
UP TO 2 HP
ABOVE 2 HP UP TO 5 HP
ABOVE 5 HP UP TO 10 HP
ABOVE 10 HP UP TO 25 HP
ABOVE 25 HP UP TO 50 HP
ABOVE 50 HP UP TO 75 HP
ABOVE 75 HP UP TO 100 HP
CALIBRATION OF FOLLOWING EQUIPMENT. CERTIFICATE T BE PROVIDED
CALIBRATION OF AMMETER
CALIBRATION OF KILOWATT METER
CALIBRATION OF FREQUENCY METER
CALIBRATION OF VOLT METER
ELECTRICAL WORK PACKAGE
UNDERWATER LOG (A) CLEAN PICK UP HEAD AND TRANSDUCER EXTERNALLY.
UNDERWATER LOG (B) CARRY OUT RENEWAL OF MINOR FAIRING BY COLD REPAIR AROUND TRANSDUCER.
UNDERWATER LOG (C) COVER THE TRANSDUCER WITH FOAM LINED WATER PROOF COVER/ SHEET TO AVOID DAMAGE WHILE SAND BLASTING AND UNDERWATER PAINTING.
ECHO SOUNDER (A) CLEAN TRANSDUCER EXTERNALLY.
ECHO SOUNDER (B) CARRY OUT RENEWAL OF MINOR FAIRING BY COLD REPAIR AROUND TRANSDUCER.
ECHO SOUNDER (C) COVER THE TRANSDUCER WITH FOAM LINED WATER PROOF COVER/ SHEET TO AVOID DAMAGE WHILE SAND BLASTING AND UNDERWATER PAINTING.
MOTORS REMOVE MOTOR FROM ONBOARD COMPARTMENT, TRANSPORT ASHORE, DISMANTLING OVERHAULING, VARNISHING, BAKING, REASSEMBLING, RETURN ONBOARD, WORK IN POSITION, RECONNECT CABLES AND TEST AS PER NAVAL TRIALS SCHEDULE ONBOARD.
A) AC MOTOR OVERHAULING COST WITHOUT REWINDING
Upto 5 KW
AC MOTOR OVERHAULING COST WITH REWINDING
Upto 5 KW
stage.html
html • 0.02 MB
finance_551609.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .