Tender Value
₹56.1 L
EMD Value
₹56,100
Closing Date
12 Oct 2026, 5:00 pm
SE ABD
SE ANANDAPUR BARRAGE DIVISION SALAPADA
CONSTRUCTION OF BOUNDARY WALL FOR E1 E2 E3 E4 E5 E6 E7 E8 BLOCK OF ANANDAPUR BARRAGE COLONY, SALAPADA FOR THE YEAR 2026 27
2026_CCEAB_141770_1
ABP-ABD-09 of 2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
ANANDAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹56,100
Yes
28 Sept 2026
28 Sept 2026
13 Oct 2026
28 Sept 2026
12 Oct 2026
28 Sept 2026
28 Sept 2026 - 12 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing roads and land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness with cost of labour, labour cess, hire & running charges of all machineries, sundries & T&P required for the work complete as directed by the Engineer in charge. | 1,177.65 | Sqm | 2.86 | ₹3,368.08 |
| 2 | Earth work in excavation in foundation trenches, column foundation, pit, etc in all kind of soil including moorum stony earth and gravel mixed with boulders except sheet rock and boulders not requiring blasting including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site with initial lead of 50 mtr and all lifts, including shoring, shuttering & dewatering (if required) with cost of labour, labour cess, hire & running charges of all machineries, sundries & T&P required for the work complete as directed by the Engineer in charge. | 239.52 | Cum | 210.52 | ₹50,423.75 |
| 3 | Filling the Foundation and Plinth, Sides of Foundation, etc. with excavated materials (excluding rock), in layers not exceeding 0.225 m in depth including cost of watering, ramming, dressing and levelling the top to proper level & gradient, cost of labour, conveyance, loading, unloading, T&P, etc, all complete as per the direction of Engineer-in-Charge. | 79.84 | Cum | 116.96 | ₹9,338.09 |
| 4 | Supplying and Filling with Sand in Foundation and Plinth in layers not exceeding 20 cm in depth, well watered and compact , top surface dressed and levelled to proper level and gradient including cost of all materials , conveyance, royalties, loading, unloading, cost of all labour, T&P, etc. All compelete as per the dirrection of Engineer-in-charge. | 19.62 | Cum | 521.76 | ₹10,236.93 |
| 5 | Providing and laying Plain Cement Concrete of proportion (1:3:6) in foundation & floor using 40 mm & down grade black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading, royalties, cost of labours, T&P, etc. all complete as per the direction of the Engineer -in -charge. | 28.83 | Cum | 6,027.54 | ₹1,73,773.98 |
| 6 | Providing and laying Cement concrete (1:1.5:3) nominal mix with 12mm size hard broken granite chips,washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading, royalties, cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge. | 124.37 | Cum | 8,380.72 | ₹10,42,310.15 |
| 7 | Providing & fixing TOR Fe-500 HYSD Reinforcement bars of required diameter and approved quality for Reinforced Cement Concrete work including straightening, cutting, bending, binding, welding (if approved) , joining (if necessary), tying the grills, hoisting, lowering and placing in position as per the approved design & drawings (BBS) with provision of standard fan hooks including the cost of all materials, cost of all labour, conveyance, loading, unloading, cost of binding wires of 18 to 20 gauge, T&P, etc, all complete as per the direction of Engineer-in-Charge. | 74.62 | Qntl | 8,997.32 | ₹6,71,380.02 |
| 8Rigid and smooth centering & shuttering for R.C.C. works including false works and dismantling them after casting including cost of all materials, labour, conveyance, taxes, royalties, loading, unloading, scaffolding, T&P etc. complete as per the direction of the Engineer-in-charge. | |||||
| 8.1 | (a) Footing & plinth | 570.25 | Sqm | 249.83 | ₹1,42,465.56 |
| 8.2 | (b) Column | 325.88 | Sqm | 1,219.7 | ₹3,97,475.84 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Bid.pdf
Tender Documents • 2.75 MB
BOQ_610979.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .