Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance ELGI INDUSTRIAL COMPLEX III SINGANALLUR COIMBATORE TAMIL NADU 641005 | COIMBATORE | TAMIL NADU | 641005 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹17.2 L
Closing Date
9 Mar 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE ASY
THE ADMIRAL SUPERINTENDENT FOR OFFICER IN CHARGE TST (VIKRANT) NAVAL SHIP REPAIR YARD
FOR CONCLUDING RATE CONTRACT (RRC) FOR HIGH PRESSURE AIR AND LOW PRESSURE AIR COMPRESSORS SYSTEM INSTALLED ON BOARD INS VIKRANT
2023_NAVY_582191_1
TST/344/E/LP HP/23-26 (i)
Single
Marine Services
Item Rate
1095 days
AT KOCHI
THE OEM/ REP SHOULD HAVE SUITABLE FACILITY, SUFFICIENT INFRASTRUCTURE AND EXPERTISE FOR PROVIDING SERVICE UNDER RRC WITHIN 24 HOURS OF NOTIFICATION AT KOCHI AND 72 HOURS AT ANY OTHER PORTS IN INDIA
7 documents required · 7 mandatory
₹0
₹17.2 L
Yes
AT NSRY KOCHI
10 Mar 2023
21 Feb 2023
10 Mar 2023
21 Feb 2023
9 Mar 2023
3 Mar 2023
22 Feb 2023 - 27 Feb 2023
1 Mar 2023
Amount
Work/ Item description
1000 Hourly routines
Check screw connections of connecting rod screws, flywheel bolt, cylinder head screws of 1st, 2nd and 3rd stage, burst disc flange 2nd stage lamellar valve retaining screw, 1st, 2nd stage cooler inserts. If necessary, tighten them to the torque valve as given in the table 5.3 of Maintenance manual (this is to be undertaken Annually/ 1000 Hourly whichever is coming earlier)
4000 Hourly routines
Replace piston rings of all three stages.
Replace qudqeon pins and qudqeon pin bearings.
Clean the motor windings at both ends (subjected to corrosive or other environments)
Carry out chemical cleaning of the inter stage cooler.
Replace coupling flexible insert.
Check safety valves for their operation as per technical manual.
Check cylinders, liners and pistons for scoring marks and excessive wear. Replace parts if wear limits are exceeding limits.
6000 Hourly routines
Replace dryer agent.
12000 Hourly routines
Check the crankshaft drive bearing and replace if extremely worn.
Check the big end bearing and replace if extremely worn.
Replace shaft seal in the crankcase.
Occasional routines
Replacement of zinc plugs.
Repairs of soft starters.
Overhauling of Concentric Valve 1st 2nd and 3rd stage.
Pressure testing of air bottles.
Calibration of Pressure Transmitters.
Overhauling/ Repairs of Auto Change over valve.
Overhauling of Solenoid valve.
Serviceability checks of Pressure Transmitters.
Overhauling/ Repairs/ Renewal of Concentric and Lamellar valve.
Overhauling of Lub Oil pump.
Overhauling of Sea Water Pressure Reducer.
Repair/ Resetting and calibration of high discharge pressure relief valve.
Calibration of 1st 2nd and 3rd stage relief valve.
Overhauling of Pneumatic system valves.
Replacement of Connecting Rod, Piston Ring and Piston of compressor.
Overhauling of condensate drain solenoid valve.
Overhauling/ repair of air reducers.
Calibration/ Repair of Dew point sensor.
Installation of software of PLC cards of PLC panel.
Replacement of Filter Element of Beko Dryer.
Installation of software of PLC cards of Drier unit.
Removal and Refitment of interstage coolers.
Pressure testing of interstage coolers.
Replacement change the adsorption in the event of contamination by oil (brownish discoloring).
Reprogramming of Flash Drive in PLC Panel LCP.
Overhauling of complete compressor.
Replacement of bearing of compressor.
Repairing and overhauling of pressure maintaining valves in compressor discharge.
Repairing and overhauling of Solenoid valves in drier assembly
Cary out chemical cleaning of Lub Oil cooler.
PRICE SCHEDULE FOR HPAC
1000 Hourly routines
Check screw connections of connecting rod screws, flywheel bolt, cylinder head screws of 1st, 2nd and 3rd stage, burst disc flange 2nd stage lamellar valve retaining screw, 1st, 2nd stage cooler inserts. If necessary, tighten them to the torque valve as given in the table 5.3 of Maintenance manual (this is to be undertaken Annually/ 1000 Hourly whichever is coming earlier)
4000 Hourly routines
Replace piston rings of all three stages.
Replace qudqeon pins and gudgeon pin bearings.
Clean the motor windings at both ends (subjected to corrosive or other environments)
Carry out chemical cleaning of the inter stage cooler.
Replace coupling flexible insert.
Check safety valves for their operation as per technical manual.
Check cylinders, liners and pistons for scoring marks and excessive wear. Replace parts if wear limits are exceeding limits.
6000 Hourly routines
Replace dryer agent.
12000 Hourly routines
Check the crankshaft drive bearing and replace if extremely worn.
Check the big end bearing and replace if extremely worn.
Replace shaft seal in the crankcase.
Occasional routines
Replacement of zinc plugs.
Repairs of soft starters.
Overhauling of Concentric Valve 1st 2nd and 3rd stage.
Pressure testing of air bottles.
Calibration of Pressure Transmitters.
Overhauling/ Repairs of Auto Change over valve.
Overhauling of Solenoid valve.
Serviceability checks of Pressure Transmitters.
Overhauling/ Repairs/ Renewal of Concentric and Lamellar valve.
Overhauling of Lub Oil pump.
Overhauling of Sea Water Pressure Reducer.
Repair/ Resetting and calibration of high discharge pressure relief valve.
Calibration of 1st 2nd and 3rd stage relief valve.
Overhauling of Pneumatic system valves.
Replacement of Connecting Rod, Piston Ring and Piston of compressor.
Overhauling of condensate drain solenoid valve.
Overhauling/ repair of air reducers.
Calibration/ Repair of Dew point sensor.
Installation of software of PLC cards of LCP panel.
Replacement of Filter Element of Beko Dryer.
Installation of software of PLC cards of Drier unit.
Removal and Refitment of interstage coolers.
Pressure testing of interstage coolers.
Replacement change the adsorption in the event of contamination by oil (brownish discoloring).
Reprogramming of Flash Drive in PLC Panel LCP.
Overhauling of complete compressor.
Replacement of bearing of compressor.
Repairing and overhauling of pressure maintaining valves in compressor discharge.
Repairing and overhauling of Solenoid valves in drier assembly
Cary out chemical cleaning of Lub Oil cooler.
Unscheduled maintenance support for LPAC and HPAC (As per man-day rates including all expenses)
Superintendent Engineer
Service Engineer
Service Technician
stage.html
html • 0.02 MB
finance_652236.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .