| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 66 2 48A SRIRAMNAGAR SRIHARIPURAM SRIHARIPURAM VISAKHAPATNAM ANDHRA PRADESH 530011 | VISAKHAPATANAM | ANDHRA PRADESH | 530011 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
10 Jun 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-Com
Hindustan Shipyard limited, Visakhapatnam
Overhauling of Coolers on INS DHRUV
2022_HSL_90201_1
20 / 22009 / Coolers / 048 / 2022-23
Open Tender
Miscellaneous Services
Service
15 days
Hindustan Shipyard Ltd
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
Exempted
18 Jun 2022
3 Jun 2022
10 Jun 2022
3 Jun 2022
10 Jun 2022
3 Jun 2022
Amount
The following Coolers are to be removed, chemical cleaned, overhauled, tested up the required pressure,fitted in position and showned to ship staff and surveyor.For overhauling,all required materials (like zinc anodes,copper plugs,purging cocks,gaskets) and consumables are procure,supply and fitment covered in contractor scope. CONTRACTOR HAS TO EXECUTE COMPLETE BELOW SCOPE OF WORK AS PER TERMS AND CONDITIONS TO THE SATISFACTION OF SHIP STAFF & HSL.
Remove and examine sea-water side of Alternator air cooler (where fitted) for corrosion, erosion and fouling. Clean tube plate and tubes with water jet (BR 3000 art. 1801 refers). Carry out Chemical cleaning if necessary. Pressure testing on completion to be undertaken.
Remove and examine sea-water side of Alternator air cooler (where fitted) for corrosion, erosion and fouling. Clean tube plate and tubes with water jet (BR 3000 art. 1801 refers). Carry out Chemical cleaning if necessary. Pressure testing on completion to be undertaken.
Following annual routine to carry out on both main engine central coolers: Clean coolers as per OEM MIP and undertake pressure testing after assembly (Test one media side at a time while keeping the other side open to the atmosphere. The pressure testing must be performed at a pressure equal to the operating pressure of the actual unit but never above the design pressure as stated on the name plate. The recommended test time is 10 minutes. Dry the unit after hydrostatic pressure testing.
Following annual routine to carry out on both main engine Fuel coolers: Clean coolers as per OEM MIP and undertake pressure testing after assembly (Test one media side at a time while keeping the other side open to the atmosphere. The pressure testing must be performed at a pressure equal to the operating pressure of the actual unit but never above the design pressure as stated on the nameplate. The recommended test time is 10 minutes. Dry the unit after hydrostatic pressure testing.
Carry out chemical cleaning of CPP oil cooler.
SHRI GURUDATTA ENGINEERING WORKS
Sri Balaji Marine and Civil Engg Works
GOKUL ENGINEERING ASSOCIATES
M/s Kalyani Marine And Industrial Engineers
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .