Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.1 LAccepted-AOC RUDRAPRAYAG | RUDRA PRAYAG | UTTARAKHAND | 246141 | ₹44.1 L Quoted ₹44.6 L | L1 | Accepted-AOC QUALIFIED |
| 2 | L2₹45.6 LRejected-Finance 2 FRIENDS ENCLAVE SHAH NAGAR P O DEFENCE COLONY DEHRADUN WORKS AT RESHAM MAJRI GURUDWARA ROAD LAL TAPPAR IND AREA RISHIKESH DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹45.6 L | L2 | Rejected-Finance NOT QUALIFIED |
| 3 | Not Admitted-Fee/PreQual/Technical FYOULI RESORT FATA MAIKHANDA RUDRAPARYA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | UTTARANCHAL FORGINGS INDUSTRY L2 | DEVENDRA SINGH BHANDARI L1 |
|---|---|---|---|---|---|
| 1.00SUPPLY OF MATERIAL PORTION | |||||
| 2.00 | MS NUT&BOLTS 16X65mm | 5 | KG | 1,100 ₹1,100 | 1,025 ₹1,025 |
| 3.00 | MS NUT & BOLT 16 X 100 mm | 5 | KG | 790 ₹790 | 780 ₹780 |
| 4.00 | E- CLAMP | 19 | NOS | 9,500 ₹9,500 | 8,626 ₹8,626 |
| 5.00 | STAY CLAMP FOR SP-33 WITH NUT & BOLT | 135 | NOS | 40,500 ₹40,500 | 34,290 ₹34,290 |
| 6.00 | PP & CLAMP WITH N&B ST POLE SP-33 | 98 | NOS | 31,360 ₹31,360 | 24,794 ₹24,794 |
| 7.00 | Bracing Clamp For ST SP33 Top With N&B | 36 | NOS | 16,200 ₹16,200 | 15,732 ₹15,732 |
| 8.00 | EARTH WIRE CLAMP FOR SP-33 WITH
N/B | 32 | NOS | 11,200 ₹11,200 | 10,656 ₹10,656 |
| 9.00 | Bottom Bracing Clamp For SP33-N&B | 36 | NOS | 16,200 ₹16,200 | 15,732 ₹15,732 |
| 10.00 | ALUMINIUM BINDING WIRE | 10 | KG | 3,900 ₹3,900 | 3,850 ₹3,850 |
Tender Value
Refer Docs
EMD Value
₹81,500
Closing Date
15 May 2025, 12:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER, EDC KARANPRAYAG
Reconductoring 33KV line with Dog Conductor from Jakholi S/s to Ghanshali S/s on Semi-Turnkey Basis Under EDD Rudraprayag against Capital (SI) Head
2025_UPCL4_83363_1
03/EDC(K)/2025-26
Open Tender
Repair and Maintenance Works
180 days
RUDRAPRAYAG
AS PER NIT
3 documents required · 3 mandatory
₹2,360
EE EDD GOPESHWAR
₹81,500
4 Jun 2026
30 Apr 2025
16 May 2025
30 Apr 2025
15 May 2025
1 May 2025
SUPPLY OF MATERIAL PORTION
MS NUT&BOLTS 16X65mm
MS NUT & BOLT 16 X 100 mm
E- CLAMP
STAY CLAMP FOR SP-33 WITH NUT & BOLT
PP & CLAMP WITH N&B ST POLE SP-33
Bracing Clamp For ST SP33 Top With N&B
EARTH WIRE CLAMP FOR SP-33 WITH N/B
Bottom Bracing Clamp For SP33-N&B
ALUMINIUM BINDING WIRE
LABOUR PORTION
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF 33 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-33 POLE
ERECTION OF SP-33 DOUBLE POLE
GROUTING OF POLE
MUFFING OF POLE
PAINTING OF SP-33 POLE
LAYING OF DOG CONDUCTOR IN HT LINE
GUARDING OF 33 KV LINE
LOPPING & CHOPPINGOF TREE BRANCHES
CONST.,INST.OF DANGER BOARD/ NUMBER PLATE
CARTAGE SP-33 POLE, 100-150KM
CARTAGE OF PETTY MATERIAL,100-150KM
HEADLOAD CARTAGE SP-33 POLE(1-3 KM)
HEADLOAD CARTAGE OF MATERIAL(1-3 KM)
Replacement of 33KV Damage Disc/Pin/Fit.
BACK CARTAGE OF PETTY MATERIAL,150-200KM
Dismantling of 33KV line with earth wire
BACK HEAD LOAD CART. OF PETTY MAT. 1-3KM
CONSTR.OF PLINTH FOR 33 KV D/P
UTTARANCHAL FORGINGS INDUSTRY (BID ID -381142)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid