Loading…
Loading…
Tender Value
₹6.8 L
EMD Value
₹6,769
Closing Date
8 Oct 2026, 5:30 pmDue tomorrow
S.E. M.I. Division, Sundargarh
O/o the Superintending Engineer, MI Division, Sundargarh, At/PO- Mahesdihi
Improvement to Gomamunda check dam in Kutra Block of Sundaragada District under Improvement to Check dam Scheme.
2026_CEMIB_141928_5
SE MID SNG 05/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
Kutra Block
C and D class contractor
2 documents required · 2 mandatory
₹4,000
₹6,769
Yes
29 Sept 2026
29 Sept 2026
9 Oct 2026
29 Sept 2026
8 Oct 2026
29 Sept 2026
29 Sept 2026 - 8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation, loading, unloading and carriage by mechanical means of all kind of soil including moorum. stoney earth, gravel etc. interspread with boulders up to 1/2 cum in size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by EIC with all lead from the place of excavation etc complete as directed by the Engineer-in-charge.(Excavation of foundation) | 25.27 | Cum | 82 | ₹2,072.14 |
| 2 | Filling foundation and plinth with excavated materials and watered and rammed etc complete as directed by the Engineer-in-Charge. | 8.42 | Cum | 54.6 | ₹459.73 |
| 3 | Cement concrete in M-15 grade using 20mm down graded size crusher broken granite metal of approved quality quarried and free from weathered skins and foreign materials including mixing the materials by use of concrete mixtures and laying concrete in layers not exiding 0.15 m. in depth to required level, curing, vibrating with vibrators, finishing etc with all leads lifts and delifts complete in all respect to proper profile and leveling including dewatering if necessary and cost, conveyance and royality and other taxes etc of materials including hire and running charges of the machineries complete as directed by the Engineer-in-charge. | 85.56 | Cum | 6,008.3 | ₹5,14,070.15 |
| 4 | Straightening, cutting, bending, binding , fitting and placing uncoated HYSD bar reinforcement and laying in position including cost of binding wire 18 to 20 gauge and fixing of reinforcement including lapping where necessary with all leads, lifts from bending yard to placement spot including cost, conveyance & all taxes of reinforcement as directed by the Engineer-in-Charge. | 8.56 | Qntl | 9,760.8 | ₹83,552.45 |
| 5 | Rigid smooth centering,shuttering for concrete works (with or without nominal renforcement ) including false works and dismentling then after casting for reuse and making good to the damaged surface where necessary with cost conveyance of materials, taxes and labour T & P etc. complite in all respect as per the direction of the Engineer-in charge. | 307.31 | Sqm | 249.8 | ₹76,766.04 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Tendernotice_2.pdf
PDF • 7.26 MB
BOQ_611296.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .