Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
Closing Date
2 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
M (SRC-OS)
Ph.No. 9493792254
Air conditioning system to be overhauled along with spares and satisfactory trails to be showned on DCI DREDGER BACKHOE 1
2026_HSL_100659_1
SR COMPLEX/PRODUCTION/OUT SOURCE REQUISITION/2026/476
Open Tender
Miscellaneous Services
Service
20 days
HSL, VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
2 Nov 2026
28 Oct 2026
2 Nov 2026
28 Oct 2026
2 Nov 2026
28 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | The following Air conditioning system works to be carried out and satisfactory trials to be showned to ship staff.All required OEM spares and consumables are procure,supply and fitment in contractor scope.all machining works,pullers,welding,cutting
and brazing works are in contractor scope. | - | - | - | - |
| 2 | Complete Air conditioning system to be overhauled, System converted from R-22 refrigerant to R407c
complied refrigerant and satisfactory trials to be showned.
1. A/C Compressor needs completely overhauled with new OEM spares.
(Compressor Model. Earlyle 06EA599600)
2. Blower assembly not rotating and jammed,required renewal complete Blower unit.
3. Evaporator coil fins damaged needs replacement of complete evaporator coil unit.
4. Heating coil to be removed from place.
5. AHU filter frame damaged needs filter replacement.
6. Filter inspection door corroded and damaged same to be replacement.
7. Drier inlet & Outlet valves and drier core needs replaced with new one,
8. HP/LP/oil pressure gauge and cut-outs needs replacement.
9. Compressor oil, Expansion valve, Condenser relief valve and required R407c refrigerant to be replaced.
10. System flushing, pressure testing to be carried out with nitrogen for 24 hrs and to ensure complete leak
free
11. After successful pressure testing, system vaccumaizing and gas charging to be carried out.
12. System trials to be showned to ship staff. | 1 | LS | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
CQ476.pdf
Tender Documents • 0.83 MB
TBID467.pdf
Tender Documents • 0.36 MB
BOQ_110224.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .