Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | GHR Marine Training & Certification Services Pvt. Ltd. Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
5 Feb 2024, 11:00 amClosed
Manager SRC-OS
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Works on Air bottles, Boiler, STP and OWS on ORV SINDHU SADHANA
2024_HSL_94041_1
20 / 22019 / 062 / Misc Engg / 2023-24
Open Limited
Miscellaneous Services
Service
25 days
HSL Visakhapatnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
27 Feb 2024
8 Jan 2024
5 Feb 2024
8 Jan 2024
5 Feb 2024
8 Jan 2024
Amount
The following Air bottles to be removed from position,chemically cleaned,pressure tested,initial and final survey showned to ship staff and IRS.all air bottle mountings,Relief valves,valve block and drain valves to be overhauled,pressure tested and fitted back.Pressure setting of relief valve on control valve blcok to be carried out.satisfactory operation shown to ship staff and IRS.repaint the inner side and outer side of airbottle, All required materials are procure,supply and fitment in contractor scope.all machining works,pullers,welding,cutting and brazing works are in contractor scope Service air bottle -1 NO
The following Air bottles to be removed from position,chemically cleaned,pressure tested,initial and final survey showned to ship staff and IRS.all air bottle mountings,Relief valves,valve block and drain valves to be overhauled,pressure tested and fitted back.Pressure setting of relief valve on control valve blcok to be carried out.satisfactory operation shown to ship staff and IRS.repaint the inner side and outer side of airbottle, All required materials are procure,supply and fitment in contractor scope.all machining works,pullers,welding,cutting and brazing works are in contractor scope Main Air compressor air bottle -2 NOS
HOT WATER BOILER Make : Euro Boiler GARIONI NAVAL,Model : NPR 407, Burner Type : RIELLO, Model :RL 50 Boiler to be chemically cleaned,hard scales to be removed by mechanical cleaning,pressure tested. Burner motor to be overhauled with new bearing,all defective spares to be enewed,solenoid valves must be checked. Renew if it is required.Boiler should be made operational. All the safeties to be tried out.All required materials are procure,supply and fitment in contractor scope.all machining works,pullers,welding,cutting and brazing works are in contractor scope
Boiler Accommodation Hot water line temp control 3-way valve calibration and Aux.,cooler line thermostat valve to be calibrated(VIALE DEI CADUTI, 3-25030 CASTELMELLA(BS)-ITALY Ph. +39/030/2681541,Drawing 25, Valve type: PN 100 ).Valves to be tested and satisfactory operation to be showned to ship staff .All required materials are procure,supply and fitment in contractor scope.
OVERHAULING OF STP PLANT Name Plate Details : Make : Hamworthy Super Trident, Model size: ST6A-C EAN Hydraulic Load: 9.36 cubic meter/day EAN Organic Load : 6 kg/day, EAK Hydraulic Load : 11 lit/min Work Scope involves : Removal of sludge from the STP plant. Cleaning of internal compartment and water washing. Apply paint coat inside the STP compartment as per OEM painting scheme. STP compartment to be completely demucked and cleaned. UT gauging to be done. Renew the plate if required. Paint the STP compartment inside and outside as per painting scheme.Clean filters, settling tank mesh, diffusers & ejectors fitted in the vacuum pump suction line. The vacuum pump suction line flaps to be replced with new one. Ejector line to inspect and repairs as required. STP plant level sensorand high level alarm to be checked. same need to be renewed if it found defective. STP to offered for ISPP survey. The scope for the above job including dismantling and refitting after replacement of spares. All the spares and
REMOVAL AND REFITMENT OF OILY WATER SEPERATOR. OILY WATER SEPERATOR along with all accessories to be removed from position, shifted to jetty.New OILY WATER SEPERATOR along with all accessories(supplied by HSL) to be Installed and commissioned in position, satisfactory operation to be showned in presence of OEM to ship staff and surveyor.
SRI BALAJI MARINE & CIVIL ENGINEERING WORKS
SHRI GURUDATTA ENGINEERING WORKS
GHR Marine Training & Certification Services Pvt. Ltd.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Restricted Tender
This is a Open Limited tender. Documents are accessible only to bidders authorized by the issuing authority on the government portal.
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .