Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAdmitted-Finance | ₹15.6 L | L1 | Admitted-Finance |
| 2 | L2₹28.6 L+₹13.0 L (83.2%)Admitted-Finance | ₹28.6 L+₹13.0 L (83.2%) | L2 | Admitted-Finance |
| 3 | L3₹30 L+₹14.4 L (92.3%)Admitted-Finance 521 LOHA BHAVAN P D MELLO ROAD MASJID EAST MUMBAI MAHARASHTRA 400009 UDYAM MH 19 0131433 21ABHCS9995D1ZZ B 27ABHCS9995D1ZN R M 37ABHCS9995D1ZM B MII STATUS AS VERIFIED | MUMBAI | MAHARASHTRA | 400009 | ₹30 L+₹14.4 L (92.3%) | L3 | Admitted-Finance |
| 4 | L4₹49 L+₹33.4 L (214.1%)Admitted-Finance 34 SANJAY BUILDING NO 6 ANDHERI KURLA ROAD ANDHERI EAST MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | ₹49 L+₹33.4 L (214.1%) | L4 | Admitted-Finance |
| 5 | L5₹63.5 L+₹47.9 L (307.1%)Admitted-Finance | ₹63.5 L+₹47.9 L (307.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | H AND H PRECISION PVT LTD L4 | avisan engineering enterprises L1 | VENKATESWARA ENGINEERING WORKS L2 | MAYURI ENGINEERING WORKS L5 | Sadhav Offshore Engineering Private Limited L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Ops Room
a) Removal of Electrical Equipments (Approx 400 Kgs each – 5
Nos) from location for creating Space for Installation of ATDS
Sub units viz : DCP,DDR,MCP,DBs.
b) Fabrication and installation of Foundations for fitment of
above .
c) New foundation to be Fabricated and installed for Relocating
RDDU.
d) Shifting of New Equipment’s from Workshop to Location is
under Contractors Scope. | 1 | LS | 5,00,000 ₹5,00,000 | 75,000 ₹75,000 Lowest | 5,61,899 ₹5,61,899 | 7,46,145 ₹7,46,145 | 1,60,000 ₹1,60,000 |
| 2.00 | Ops Room Lobby
a) Removal of Electrical Equipments (Approx 400 Kgs each – 5
Nos ) from location for creating Space for Installation of ATDS
Sub units viz : CFP , ITU.
b) Fabrication and installation of Foundations for fitment of
above .
c) New foundation to be Fabricated and installed for Relocating
EOGFCS
d) Shifting of New Equipment’s from Workshop to Location is
under Contractors Scope | 1 | LS | 7,00,000 ₹7,00,000 | 75,000 ₹75,000 Lowest | 2,85,086 ₹2,85,086 | 8,64,090 ₹8,64,090 | 1,60,000 ₹1,60,000 |
| 3.00 | Bridge
a) Removal of Electrical Equipments, DBs, ,etc (Approx 300 Kgs
each – 3 Nos ) from location for creating Space for Installation
of ATDS Sub units viz : RDU , DBs
b) Fabrication and installation of Foundations for fitment of
above .
c) Shifting of New Equipment’s from Workshop to Location is
under Contractors Scope | 1 | LS | 7,00,000 ₹7,00,000 | 70,000 ₹70,000 Lowest | 3,29,696 ₹3,29,696 | 4,32,837 ₹4,32,837 | 1,20,000 ₹1,20,000 |
| 4.00 | Quarter Deck
(a) Major deck modification is required in quarter deck for
fitment of winch system onboard.
(b) Winch to be placed after frame number 8 to frame number 15 and between the port side pillar and the centre line of the ship.
(c) Winch centre line shall be 2400mm from the ship centre line
towards port side.
(d) 03 RU lockers are required to be relocated for installing winch sheave subsystem and Hydraulic power pack.
(e) Telephone box and power supply box to be elevated in the same bulkhead to facilitate mounting of winch power panel for which all foundations are to fabricated and Installed and items to be fixed.
(f) Clear space is required at the aft and for mounting of the sheave and deployment of the array. The area between 2nd and 3rd frame on aft end to be made available by removing frames and plates and increasing the area of the window.
(g) Total space requirement from for Winch system is approx.
7m from the aft end for winch and sheave.
(j) CVD can be placed on Quarter deck adjacent to Capstan operating panel,
(k) Necessary deck strengthening is required to be done at the
winch system location. – Approx 3 Tons
(l) Sheaves to be fitted at aft end, after relocating the RU boxes
along with supply of fresh water at 1 bar pressure ( 20 LPM).
(m) Hydraulic power pack to be located as per the layout options at Quarter deck.
(n) Winch power panel (WPP) JB-winch and JB-PP, automatic
change over switch (ACOS), switch disconnector fuse (SDF), Display unit , Winch, Towed Array, Towed Cable roller must be located at Quarter deck
Note :
1. All Foundations to be Fabricated and installed by
contractor only.
2. Shifting of all items and securing is under contractors
Scope.
3. Deck Strengthening is under Contractors Scope.
4. All in way Jobs to be considered in the Scope. | 1 | LS | 12,00,000 ₹12,00,000 | 6,00,000 ₹6,00,000 | 2,74,678 ₹2,74,678 Lowest | 14,51,718 ₹14,51,718 | 12,50,000 ₹12,50,000 |
| 5.00 | Gun Deck
a) Launcher Foundations (P & S) to be fabricated and installed
in position.(Approx 3000mm Dia)
b) Deck strengthening to be carried out on Both Port and Stbd
Gun Deck locations (Approx – 4 Tons-P&S).
c) Launchers to be shifted from Workshop and to be fitted in
Position.
d) All Degutting of Items, Piercing of Bhds, Bhd Glands Fitment
etc is under contractors Scope.
e) Shifting of New Equipment’s from Workshop to Location is
under Contractors Scope
f) Pneumatic Lines to be drawn from HP air Bottle to Launchers.
( Isolating Valve , Strainer , Pressure Reducer Valve (200-
50BAR), Pressure relief Valve, Isolating Valve, Safety Relief
Valve along with SS Pipe lines to be installed in the System .
BOM attached at Annexure I. ) | 1 | LS | 14,00,000 ₹14,00,000 | 5,00,000 ₹5,00,000 Lowest | 6,77,899 ₹6,77,899 | 18,45,279 ₹18,45,279 | 11,20,000 ₹11,20,000 |
| 6.00 | Aviation Store & Aviation Store Lobby
a) Removal of Electrical Equipments (Approx 200 Kgs each – 3
Nos) from location for creating Space for Installation of ATDS
Sub units viz : WMC ,FDU-D,Power Supply Boxes,etc
b) Fabrication and installation of Foundations for fitment of
above .
c) Shifting of New Equipment’s from Workshop to Location is
under Contractors Scope. | 1 | LS | 2,00,000 ₹2,00,000 | 80,000 ₹80,000 Lowest | 2,49,868 ₹2,49,868 | 3,69,279 ₹3,69,279 | 1,20,000 ₹1,20,000 |
| 7.00 | Gun Wharf Store
a. Fitment of expendable decoy storage racks & Boxes
b. Head Phone assembly
Transit case | 1 | LS | 1,00,000 ₹1,00,000 | 80,000 ₹80,000 | 2,79,688 ₹2,79,688 | 3,69,279 ₹3,69,279 | 25,000 ₹25,000 Lowest |
| 8.00 | Electrical SPTA Room
a. New Metallic Stowage Lockers to be provided for securing of
Materials like SPTA, Test Equipment’s etc. | 1 | LS | 1,00,000 ₹1,00,000 | 80,000 ₹80,000 | 1,99,875 ₹1,99,875 | 2,72,718 ₹2,72,718 | 45,000 ₹45,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
10 Apr 2026, 11:00 amClosed
M(SRC-OS)
HSL
INSTALLATION OF ATDS SYSTEM ON INS PROJECT
2026_HSL_99323_1
SR COMPLEX/PRODUCTION/OUT SOURCEREQUISITION/2025/974
Open Tender
Miscellaneous Services
Service
150 days
VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹25,000
Yes
HSL SRC VISAKHAPATNAM
16 Apr 2026
2 Apr 2026
10 Apr 2026
2 Apr 2026
10 Apr 2026
2 Apr 2026
4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ops Room
a) Removal of Electrical Equipments (Approx 400 Kgs each – 5
Nos) from location for creating Space for Installation of ATDS
Sub units viz : DCP,DDR,MCP,DBs.
b) Fabrication and installation of Foundations for fitment of
above .
c) New foundation to be Fabricated and installed for Relocating
RDDU.
d) Shifting of New Equipment’s from Workshop to Location is
under Contractors Scope. | 1 | LS | - | - |
| 2 | Ops Room Lobby
a) Removal of Electrical Equipments (Approx 400 Kgs each – 5
Nos ) from location for creating Space for Installation of ATDS
Sub units viz : CFP , ITU.
b) Fabrication and installation of Foundations for fitment of
above .
c) New foundation to be Fabricated and installed for Relocating
EOGFCS
d) Shifting of New Equipment’s from Workshop to Location is
under Contractors Scope | 1 | LS | - | - |
| 3 | Bridge
a) Removal of Electrical Equipments, DBs, ,etc (Approx 300 Kgs
each – 3 Nos ) from location for creating Space for Installation
of ATDS Sub units viz : RDU , DBs
b) Fabrication and installation of Foundations for fitment of
above .
c) Shifting of New Equipment’s from Workshop to Location is
under Contractors Scope | 1 | LS | - | - |
| 4 | Quarter Deck
(a) Major deck modification is required in quarter deck for
fitment of winch system onboard.
(b) Winch to be placed after frame number 8 to frame number 15 and between the port side pillar and the centre line of the ship.
(c) Winch centre line shall be 2400mm from the ship centre line
towards port side.
(d) 03 RU lockers are required to be relocated for installing winch sheave subsystem and Hydraulic power pack.
(e) Telephone box and power supply box to be elevated in the same bulkhead to facilitate mounting of winch power panel for which all foundations are to fabricated and Installed and items to be fixed.
(f) Clear space is required at the aft and for mounting of the sheave and deployment of the array. The area between 2nd and 3rd frame on aft end to be made available by removing frames and plates and increasing the area of the window.
(g) Total space requirement from for Winch system is approx.
7m from the aft end for winch and sheave.
(j) CVD can be placed on Quarter deck adjacent to Capstan operating panel,
(k) Necessary deck strengthening is required to be done at the
winch system location. – Approx 3 Tons
(l) Sheaves to be fitted at aft end, after relocating the RU boxes
along with supply of fresh water at 1 bar pressure ( 20 LPM).
(m) Hydraulic power pack to be located as per the layout options at Quarter deck.
(n) Winch power panel (WPP) JB-winch and JB-PP, automatic
change over switch (ACOS), switch disconnector fuse (SDF), Display unit , Winch, Towed Array, Towed Cable roller must be located at Quarter deck
Note :
1. All Foundations to be Fabricated and installed by
contractor only.
2. Shifting of all items and securing is under contractors
Scope.
3. Deck Strengthening is under Contractors Scope.
4. All in way Jobs to be considered in the Scope. | 1 | LS | - | - |
| 5 | Gun Deck
a) Launcher Foundations (P & S) to be fabricated and installed
in position.(Approx 3000mm Dia)
b) Deck strengthening to be carried out on Both Port and Stbd
Gun Deck locations (Approx – 4 Tons-P&S).
c) Launchers to be shifted from Workshop and to be fitted in
Position.
d) All Degutting of Items, Piercing of Bhds, Bhd Glands Fitment
etc is under contractors Scope.
e) Shifting of New Equipment’s from Workshop to Location is
under Contractors Scope
f) Pneumatic Lines to be drawn from HP air Bottle to Launchers.
( Isolating Valve , Strainer , Pressure Reducer Valve (200-
50BAR), Pressure relief Valve, Isolating Valve, Safety Relief
Valve along with SS Pipe lines to be installed in the System .
BOM attached at Annexure I. ) | 1 | LS | - | - |
| 6 | Aviation Store & Aviation Store Lobby
a) Removal of Electrical Equipments (Approx 200 Kgs each – 3
Nos) from location for creating Space for Installation of ATDS
Sub units viz : WMC ,FDU-D,Power Supply Boxes,etc
b) Fabrication and installation of Foundations for fitment of
above .
c) Shifting of New Equipment’s from Workshop to Location is
under Contractors Scope. | 1 | LS | - | - |
| 7 | Gun Wharf Store
a. Fitment of expendable decoy storage racks & Boxes
b. Head Phone assembly
Transit case | 1 | LS | - | - |
| 8 | Electrical SPTA Room
a. New Metallic Stowage Lockers to be provided for securing of
Materials like SPTA, Test Equipment’s etc. | 1 | LS | - | - |
stage.html
html • 0.03 MB
techsummary_108902.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_108902.xls
BOQ • 0.24 MB
TBID_974.pdf
Tender Documents • 3.43 MB
ANNEXURE.pdf
Tender Documents • 0.55 MB
Terms_Cond.pdf
Tender Documents • 0.20 MB
Corrigendum.pdf
PDF • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .