Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
12 Mar 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
LT CDR ANKUR SHARMA
MANAGER (COMMERCIAL), SUBMARINE MAINTENANCE UNIT, NAVAL DOCKYARD, VISAKHAPATNAM - 530014
RATE REPAIR CONTRACT FOR REPAIRS OF NUCON BDU ONBOARD EKM SUBMARINES FOR A PERIOD OF 03 YEARS
2022_NAVY_509084_1
SMU/300/RRC/21-22/BDU DATED 19 FEB 22
Open Tender
Miscellaneous Services
Works
1095 days
SUBMARINE MAINTENANCE UNIT, NAVAL DOCKYARD, VSKP
PLEASE REFER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹0
Exempted
CONFERENCE HALL, SMU(V)
25 Mar 2022
19 Feb 2022
14 Mar 2022
19 Feb 2022
12 Mar 2022
1 Mar 2022
19 Feb 2022 - 28 Feb 2022
1 Mar 2022
120 days
Laying and Jointing PVC Pipe. Heading
Removal, Cleaning and Refitment of HP Moisture Separator Housing(Replace, if necessary) - First Year
Removal, Cleaning and Refitment of Pre filter housing(Replace, if necessary) - First Year
Removal, Cleaning and Refitment of After filter housing(Replace, if necessary) - First Year
Removal, Cleaning and Refitment of Oil filter housing(Replace, if necessary) - First Year
Check the functioning of Pressure Maintaining Valve(PMV) and replace the seal kit if necessary - First Year
Check the functioning of 1st stage Pressure Regulator(PRV) and replace the seal kit if necessary - First Year
Check the functioning of Pneumatic valve block assembly(Replace, if necessary) - First Year
Check the functioning of Pneumatic changeover valve and replace the seal kit if necessary - First Year
Check the functioning of Electrical control panel and replace if necessary - First Year
Check the functioning of Timer controlled auto drains and replace if necessary - First Year
Check the functioning of Check valve block and replace the seal kit if necessary - First Year
Check the functioning of Expansion valve and replace the seal kit if necessary - First Year
Check the functioning of Bypass valve and replace the seal kit if necessary - First Year
Check the functioning of 2nd and 3rd stage Pressure regulators(Replace, if necessary) - First Year
Replacement of desiccant in both drying towers - First Year
Functional checks of BDU post repair/routine - First Year
Removal, Cleaning and Refitment of HP Moisture Separator Housing(Replace, if necessary) - Second Year
Removal, Cleaning and Refitment of Pre filter housing(Replace, if necessary) - Second Year
Removal, Cleaning and Refitment of After filter housing(Replace, if necessary) - Second Year
Removal, Cleaning and Refitment of Oil filter housing(Replace, if necessary) - Second Year
Check the functioning of Pressure Maintaining Valve(PMV) and replace the seal kit if necessary - Second Year
Check the functioning of 1st stage Pressure Regulator(PRV) and replace the seal kit if necessary - Second Year
Check the functioning of Pneumatic valve block assembly(Replace, if necessary) - Second Year
Check the functioning of Pneumatic changeover valve and replace the seal kit if necessary - Second Year
Check the functioning of Electrical control panel and replace if necessary - Second Year
Check the functioning of Timer controlled auto drains and replace if necessary - Second Year
Check the functioning of Check valve block and replace the seal kit if necessary - Second Year
Check the functioning of Expansion valve and replace the seal kit if necessary - Second Year
Check the functioning of Bypass valve and replace the seal kit if necessary - Second Year
Check the functioning of 2nd and 3rd stage Pressure regulators(Replace, if necessary) - Second Year
Replacement of desiccant in both drying towers - Second Year
Functional checks of BDU post repair/routine - Second Year
Removal, Cleaning and Refitment of HP Moisture Separator Housing(Replace, if necessary) - Third Year
Removal, Cleaning and Refitment of Pre filter housing(Replace, if necessary) - Third Year
Removal, Cleaning and Refitment of After filter housing(Replace, if necessary) - Third Year
Removal, Cleaning and Refitment of Oil filter housing(Replace, if necessary) - Third Year
Check the functioning of Pressure Maintaining Valve(PMV) and replace the seal kit if necessary - Third Year
Check the functioning of 1st stage Pressure Regulator(PRV) and replace the seal kit if necessary - Third Year
Check the functioning of Pneumatic valve block assembly(Replace, if necessary) - Third Year
Check the functioning of Pneumatic changeover valve and replace the seal kit if necessary - Third Year
Check the functioning of Electrical control panel and replace if necessary - Third Year
Check the functioning of Timer controlled auto drains and replace if necessary - Third Year
Check the functioning of Check valve block and replace the seal kit if necessary - Third Year
Check the functioning of Expansion valve and replace the seal kit if necessary - Third Year
Check the functioning of Bypass valve and replace the seal kit if necessary - Third Year
Check the functioning of 2nd and 3rd stage Pressure regulators(Replace, if necessary) - Third Year
Replacement of desiccant in both drying towers - Third Year
Functional checks of BDU post repair/routine - Third Year
Filter Element – SR6001D-NIPL2007G - First Year
Filter Element – SR6001D-NIPL2007F - First Year
Filter Element – SR6001D-NIPL2007N - First Year
Filter Element – SR6001D-NIPL2007C - First Year
Pneumatic Valve Block 220 VAC – SR6001D-NIPL-4430-13 - First Year
Electrical Control Panel – SR6001D-NIPL-4430-6 - First Year
Electronic HP Timer Drain HPS-400 220VA – SR6001D-ZNKB-15DN2 - First Year
2nd Level Pressure Regulator – SR6001D-R-28 BC - First Year
3rd Level Pressure Regulator – SR6001D-R-38 BC - First Year
Desiccant (Duranit Balls) – SR6001D-Duranit 1/8” - First Year
Desiccant – SR6001D-NZPL-4293 - First Year
Change Over Valve – SR6001D-NIPL-4430-10 - First Year
Expansion Valve – SR6001D-NIPL-4430-11 - First Year
Check Valve Block – SR6001D-NIPL-4430-4 - First Year
By Pass Valve – SR6001D-NIPL-4430-12 - First Year
HPRV1 – SR6001D-NIPL-4430-18 - First Year
Pressure Maintaining Valve – SR6001D-NIPL-4321-3 - First Year
Needle Valve – SR6001D-NV-2 - First Year
Filter Element – SR6001D-NIPL2007G - Second Year
Filter Element – SR6001D-NIPL2007F - Second Year
Filter Element – SR6001D-NIPL2007N - Second Year
Filter Element – SR6001D-NIPL2007C - Second Year
Pneumatic Valve Block 220 VAC – SR6001D-NIPL-4430-13 - Second Year
Electrical Control Panel – SR6001D-NIPL-4430-6 - Second Year
Electronic HP Timer Drain HPS-400 220VA – SR6001D-ZNKB-15DN2 - Second Year
2nd Level Pressure Regulator – SR6001D-R-28 BC - Second Year
3rd Level Pressure Regulator – SR6001D-R-38 BC - Second Year
Desiccant (Duranit Balls) – SR6001D-Duranit 1/8” - Second Year
Desiccant – SR6001D-NZPL-4293 - Second Year
Change Over Valve – SR6001D-NIPL-4430-10 - Second Year
Expansion Valve – SR6001D-NIPL-4430-11 - Second Year
Check Valve Block – SR6001D-NIPL-4430-4 - Second Year
By Pass Valve – SR6001D-NIPL-4430-12 - Second Year
HPRV1 – SR6001D-NIPL-4430-18 - Second Year
Pressure Maintaining Valve – SR6001D-NIPL-4321-3 - Second Year
Needle Valve – SR6001D-NV-2 - Second Year
Filter Element – SR6001D-NIPL2007G - Third Year
Filter Element – SR6001D-NIPL2007F - Third Year
Filter Element – SR6001D-NIPL2007N - Third Year
Filter Element – SR6001D-NIPL2007C - Third Year
Pneumatic Valve Block 220 VAC – SR6001D-NIPL-4430-13 - Third Year
Electrical Control Panel – SR6001D-NIPL-4430-6 - Third Year
Electronic HP Timer Drain HPS-400 220VA – SR6001D-ZNKB-15DN2 - Third Year
2nd Level Pressure Regulator – SR6001D-R-28 BC - Third Year
3rd Level Pressure Regulator – SR6001D-R-38 BC - Third Year
Desiccant (Duranit Balls) – SR6001D-Duranit 1/8” - Third Year
Desiccant – SR6001D-NZPL-4293 - Third Year
Change Over Valve – SR6001D-NIPL-4430-10 - Third Year
Expansion Valve – SR6001D-NIPL-4430-11 - Third Year
Check Valve Block – SR6001D-NIPL-4430-4 - Third Year
By Pass Valve – SR6001D-NIPL-4430-12 - Third Year
HPRV1 – SR6001D-NIPL-4430-18 - Third Year
Pressure Maintaining Valve – SR6001D-NIPL-4321-3 - Third Year
Needle Valve – SR6001D-NV-2 - Third Year
SHANMUKHA ENGG. WORKS
Nucon Pneumatics Pvt Ltd
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .