Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
1 Dec 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RnB Division
SUMBAL SONAWARI
Construction of Tile path at Sumbal Bazar from main road upto Sh. Gulzar Ahmad Shah and Other.
2025_PWDJK_295677_4
NIT NO 53 OF 2025-26 SUMBAL DIVISION
Open Tender
Civil Works
Percentage
15 days
SUMBAL SONAWARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer RnB Division
₹4,000
20 Nov 2025
20 Nov 2025
2 Dec 2025
20 Nov 2025
1 Dec 2025
20 Nov 2025
P/L dry stone soling close packed including carriage complete job
Providing and fixing in position cement concrete M-10 (1:3:6) with 20mm nominal size crushed stone agg. excluding cost of centering and shuttering. All work up to plinth level incl. carriage.
P/F of precast cement concrete interlocked tiles dark shade 50 mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to matchthe shade of the tiles, including rubbing, cleaning and curing complete on sand cushion.
Centring and shuttering including strutting, propping etc and removal of form work:- Foundation
12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) incl carriage complete job.
Add cost of of sign board and photograph
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_957304.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .