Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAdmitted-Finance 15 NEW IDDGAH BUILDINGS NH BARAMULLA BARAMULLA JAMMU KASHMIR 193101 | BARAMULLA | JAMMU AND KASHMIR | 193101 | L1 | Admitted-Finance | |
| 2 | L2₹3.9 L+₹33,000 (9.17%)Admitted-Finance NIGEEN HAZRATBAL SRINAGAR | L2 | Admitted-Finance | |
| 3 | L3₹4.5 L+₹90,000 (25.0%)Admitted-Finance BAGH I ALI MARDAN KHAN NOWSHERA SRINAGAR J K 190011 | SRINAGAR | JAMMU AND KASHMIR | 190011 | L3 | Admitted-Finance | |
| 4 | L4₹5.0 L+₹1.4 L (38.3%)Admitted-Finance 37 LACHMAN PORA BATAMALOO SRINAGAR J K | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BHAT CONSTRUCTIONS L2 | M/S P.M.T INDUSTRIES L3 | Hydro Engineers L4 | NSCOO ENGINEERING PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | SITC of Transformer Oil Pump motor assembly set used for circulation of transformer oil in 14 MVA power transformers (compatible to the existing OFWF system)with following specifications:
CONFIGURATION: Elbow (end suction) glandless oil submerged motor on common shaft with impeller, High grade cast iron casing and bronze impellers, Fully weatherproof
Fluid Type: Transformer Oil
Power : 3.08HP, 2.3KW
No. of Phases = 3NO'S
RPM = 1420 rpm.
Inlet Suction Diameter = 4inch
Outlet Suction Diameter = 4 inch.
Capacity= 12 ltr/sec.
Insulation = Class-B
Head = 5.48 m
Frequency = 50 HZ
volts = 380-420 V
The job includes replacement of malfunctioning/ deteriorated pumps of 14MVA Power transformer banks including on site modifications, changes in design for fixing gaskets, wiring, control and protection, allied accessories, etc. required for the job. | 3 | Nos | 1,31,000 ₹3,93,000 | 1,50,000 ₹4,50,000 | 1,66,000 ₹4,98,000 | 1,20,000 ₹3,60,000 Lowest |
Tender Value
₹5.3 L
EMD Value
₹10,700
Closing Date
27 Sept 2025, 4:00 pmClosed
Executive Engineer
Executive Engineer, GD, LJHP Baramulla
Supply, installation, testing and commissioning of 3 no oil pumps and motor set for 14 MVA Power Transformer of LJHP, Gantamulla, Baramulla
2025_SPDC_285735_1
NIT no. 09 of 2025-26 dated 27-08-2025
Open Tender
Electrical Works
Item Rate
45 days
Gantmulla Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
CP and AO Baramulla
₹10,700
Yes
Online
23 Oct 2025
28 Aug 2025
29 Sept 2025
28 Aug 2025
27 Sept 2025
3 Sept 2025
2 Sept 2025
Amount
SITC of Transformer Oil Pump motor assembly set used for circulation of transformer oil in 14 MVA power transformers (compatible to the existing OFWF system)with following specifications: CONFIGURATION: Elbow (end suction) glandless oil submerged motor on common shaft with impeller, High grade cast iron casing and bronze impellers, Fully weatherproof Fluid Type: Transformer Oil Power : 3.08HP, 2.3KW No. of Phases = 3NO'S RPM = 1420 rpm. Inlet Suction Diameter = 4inch Outlet Suction Diameter = 4 inch. Capacity= 12 ltr/sec. Insulation = Class-B Head = 5.48 m Frequency = 50 HZ volts = 380-420 V The job includes replacement of malfunctioning/ deteriorated pumps of 14MVA Power transformer banks including on site modifications, changes in design for fixing gaskets, wiring, control and protection, allied accessories, etc. required for the job.
BHAT CONSTRUCTIONS (BID ID -2515669)
M/S P.M.T INDUSTRIES (BID ID -2523041)
Hydro Engineers (BID ID -2548815)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .