| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77,278Accepted-AOC A CLASS GOVT CONTRACTOR V P O TANEHAR TEHSIL DHARAMPUR DISTT MANDI | ₹77,278 Quoted ₹65,490.20 | L1 | Accepted-AOC L1 |
| 2 | L2₹70,251.71+₹4,761.51 (7.27%)Rejected-AOC VILL CHANDPUR P O KHOUDA SUB TEHSIL TIHRA DISTT MANDI | MANDI | HIMACHAL PRADESH | 175001 | ₹70,251.71+₹4,761.51 (7.27%) | L2 | Rejected-AOC L2 |
| 3 | L3₹74,154.58+₹8,664.38 (13.2%)Rejected-AOC CHIEF ENGINEER OP KANGRA ZONE HPSEBL DHARAMSHALA | KANGRA | HIMACHAL PRADESH | 175013 | ₹74,154.58+₹8,664.38 (13.2%) | L3 | Rejected-AOC L3 |
Tender Value
₹92,108
Closing Date
3 Aug 2026, 11:00 amClosed
Sr. XEN
ED HPSEBL DHARAMPUR
Tender for prov. SOP to Drip Irrigation System under HPSHIVA project at Cluster Satrehar in (E) Section Dharampur UESD HPSEBL Dharampur.
2026_HPSEB_140047_1
22/2026-27
Open Tender
Supply and Erection
Percentage
60 days
Dharampur
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
1 Sept 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Erection Part LT Line (TS. No. 35/2026-27 W.B.S. D-26-0659) | |||||
| 1.01 | Erection of S/T pole 9 mtr long,(Single pole structure) with RCC muff Including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor). | 2 | No. | 3,197 | ₹6,394 |
| 1.02 | Erection of stay set LT line, comprising digging of pit, fixing of stay rod, filling of pit, Nozzeling and tightining complete in all respects. | 4 | No. | 1,694 | ₹6,776 |
| 1.03 | Add Erection Charges for LT Earthing Set | 2 | No. | 1,262 | ₹2,524 |
| 1.04 | Sagging of conductor 1 KM single GI wire, AAAC cond., comprising laying of Conductor, stringing & sagging, binding with insulator complete in all respects. | 0.2 | km | 4,293 | ₹858.6 |
| 1.05 | Erection of LT line with ACSR 30 mm² 6/1/2.59 mm such as stringing, tensioning and sagging,jointing and fastening . | 0.4 | km | 7,546 | ₹3,018.4 |
| 1.06 | Add Manual Carriage | 0.05 | km | 33,793 | ₹1,689.65 |
| 1.07 | Transportation Charges for complete Material of LT line | 1 | Job | 10,490 | ₹10,490 |
| 2(Supply Part LT LIne) | |||||
| 2.01 | ACSR 6/1/2.59 mm (30 mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage} | 0.4 | Km | 29,322 | ₹11,728.8 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Tendernotice_2.pdf
PDF • 0.52 MB
BOQ_207627.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .