| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.3 CrAdmitted-Finance | ₹23.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹25.5 CrAdmitted-Finance | ₹25.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹32.4 CrAdmitted-Finance 366 GIANI ZAIL SINGH NAGAR ROPAR PB 140001 | ROPAR | ROPAR | PUNJAB | 140001 | ₹32.4 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GARG & GARG CO L3 | M/s. B. B. VERMA L2 | M/s JITENDRA KUMAR AGRAWAL L1 |
|---|---|---|---|---|---|---|
| 1.00SURFACING WORKS BETWEEN KM 0.00 TO KM 16.540 ON ROAD GOMAGUDA-METAGUDEM ROAD | ||||||
| 1.10 | GSB 15 cm thick (compacted) with stone aggregate conforming to grading No 1 as per Tables-400-1 and physical requirement for material as per tabel 400-2 of MORT&H specifications for Road and Bridge Works 2013 including supply of material, watering and compaction all complete as specified at particular specification and as directed by Engineer-In-Charge. | 19,574 | 10 Sqm | 6,000 ₹11.7 Cr | 4,900 ₹9.6 Cr | 4,500 ₹8.8 Cr |
| 1.20 | WBM 75 mm consolidated thickness of stone aggregate size 63 mm to 45 mm, grading 1 as per table 400-9 and satisfying the physical requirement as per table 400-8 of MORT&H specifications for Road and Bridge Works 2013 spread rolled, hollow made up to form true surface, blinded and consolidated to gradient and camber required all as specified | 17,544 | 10 Sqm | 6,000 ₹10.5 Cr | 2,900 ₹5.1 Cr | 2,500 ₹4.4 Cr |
| 1.30 | Providing and laying 50 mm thick DBM layer, precoated stone aggregate physical requirements/grading/mix composition requirement as per Table 500-8/9/10 respectively of MORT&H specifications for Road and Bridge Works 2013 with 4.250% asphalt VG-30/40 penetration grade as per MoRT&H data book and rolled to the required specification as specified at particular specification | 7,832 | 10 Sqm | 6,000 ₹4.7 Cr | 6,600 ₹5.2 Cr | 6,200 ₹4.9 Cr |
| 1.40 | Providing and laying 40 mm thick BC on DBM layer with precoated stone chips grading confirming to Table 500-17 and mix satisfying the physical requirement of Table 500-16 of MORT&H specifications for Road and Bridge Works 2013 mixed with 5% binder asphalt VG-30/40 penetration grade by weight of total mix and 2% cement by weight of mix (for filler) all as specified as per MoRT&H data book and as specified at particular specification | 7,832 | 10 Sqm | 6,000 ₹4.7 Cr | 6,300 ₹4.9 Cr | 5,800 ₹4.5 Cr |
| 1.50 | Providing and applying prime coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying [email protected] per 10sqm, (using BPD with manual labour) all completetd as per clause 502 of MORT&H specifications for Road and Bridge Works 2013 and as specified at particular specification. | 7,832 | 10 Sqm | 600 ₹47.0 L | 570 ₹44.6 L | 550 ₹43.1 L |
| 1.60 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor @2.5 Kg/10 sqm on prepared bituminous granular surface cleaned with mechanical broom, all complete as per clause 503 of MORT&H specifications for Road and Bridge Works 2013 and as specified at perticular specification. | 7,832 | 10 Sqm | 300 ₹23.5 L | 360 ₹28.2 L | 350 ₹27.4 L |
Updated dates
Tender Value
₹21.3 Cr
EMD Value
₹13.9 L
Closing Date
20 Jan 2026, 6:00 pmClosed
Executive Engineer
HQ CE P HIRAK NEAR GOVT ITI TANAKPUR UTTARAKHAND
Surf Wks Of GSB 15 Cm,WBM 75 Mm,DBM 50 Mm,BC 40 Mm On Gomaguda-Metagudem Rd Btw Km0.00-Km16.54,Constr Of Bridge On Rd Raigudem-Pedabodkel,App Rd To Palagoda CRPF Camp Of Length 150 Mtr And App Rd To Gundarajugodem CRPF Camp Of Length 230 Mtr
2025_BRO_744169_1
80656
Open Tender
Civil Works - Roads
120 days
GOMAGUDA-METAGUDEM CHHATTISGARH
As per tender document
5 documents required · 5 mandatory
₹0
₹13.9 L
Yes
HQ CE P HIRAK
13 Feb 2026
11 Dec 2025
22 Jan 2026
12 Dec 2025
20 Jan 2026
1 Jan 2026
12 Dec 2025 - 31 Dec 2025
23 Dec 2025
SURFACING WORKS BETWEEN KM 0.00 TO KM 16.540 ON ROAD GOMAGUDA-METAGUDEM ROAD
GSB 15 cm thick (compacted) with stone aggregate conforming to grading No 1 as per Tables-400-1 and physical requirement for material as per tabel 400-2 of MORT&H specifications for Road and Bridge Works 2013 including supply of material, watering and compaction all complete as specified at particular specification and as directed by Engineer-In-Charge.
WBM 75 mm consolidated thickness of stone aggregate size 63 mm to 45 mm, grading 1 as per table 400-9 and satisfying the physical requirement as per table 400-8 of MORT&H specifications for Road and Bridge Works 2013 spread rolled, hollow made up to form true surface, blinded and consolidated to gradient and camber required all as specified
Providing and laying 50 mm thick DBM layer, precoated stone aggregate physical requirements/grading/mix composition requirement as per Table 500-8/9/10 respectively of MORT&H specifications for Road and Bridge Works 2013 with 4.250% asphalt VG-30/40 penetration grade as per MoRT&H data book and rolled to the required specification as specified at particular specification
Providing and laying 40 mm thick BC on DBM layer with precoated stone chips grading confirming to Table 500-17 and mix satisfying the physical requirement of Table 500-16 of MORT&H specifications for Road and Bridge Works 2013 mixed with 5% binder asphalt VG-30/40 penetration grade by weight of total mix and 2% cement by weight of mix (for filler) all as specified as per MoRT&H data book and as specified at particular specification
Providing and applying prime coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying [email protected] per 10sqm, (using BPD with manual labour) all completetd as per clause 502 of MORT&H specifications for Road and Bridge Works 2013 and as specified at particular specification.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor @2.5 Kg/10 sqm on prepared bituminous granular surface cleaned with mechanical broom, all complete as per clause 503 of MORT&H specifications for Road and Bridge Works 2013 and as specified at perticular specification.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.27 MB
TD80656.pdf
Tender Documents • 1.76 MB
IP.pdf
Additional Documents • 2.54 MB
BOQ_833285.xls
BOQ • 0.34 MB